← Back to opportunities

REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)

The Tall Ship Glenlee Trust

Buyer Contact Info

Buyer Name: The Tall Ship Glenlee Trust

Buyer Address: 150 Pointhouse Place, Glasgow, UK, G3 8RS

Contact Name: Fiona Greer

Contact Email: fiona.greer@thetallship.com

Contact Telephone: +44 1413573699

Status
complete
Procedure
open
Value
51829.0 GBP
Published
10 Feb 2026, 00:00
Deadline
n/a
Contract Start
n/a
Contract End
n/a
Category
goods
CPV
42416000
Region
n/a
Awarded To
Saltire Lifts LTD
Official Source
Open Public Contracts Scotland

Description

The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund. Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.

Linked Documents

Some PCS documents require login and recording interest on the source portal before download links are available.

No linked documents found for this notice.

Opportunity Context

More Information Links

External Link: https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=FEB549258

Link Title: REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)

Link Description: The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund. Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.

Lots

Lot Description: Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.

Lot 1 Status: complete

Lot 1 Has Options: No

Lot 1 Award Criterion (quality): Quality

Documents

Document Title: REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)

Document Description: The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund. Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.

Raw Notice JSON

Expand raw payload
{
  "awards": [
    {
      "id": "ocds-r6ebe6-0000818861-1",
      "relatedLots": [
        "1"
      ],
      "suppliers": [
        {
          "id": "org-306",
          "name": "Saltire Lifts LTD"
        }
      ]
    }
  ],
  "bids": {
    "statistics": [
      {
        "id": "471",
        "measure": "bids",
        "relatedLot": "1",
        "value": 3.0
      },
      {
        "id": "472",
        "measure": "smeBids",
        "relatedLot": "1",
        "value": 2.0
      },
      {
        "id": "473",
        "measure": "foreignBidsFromEU",
        "relatedLot": "1",
        "value": 0.0
      },
      {
        "id": "474",
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "1",
        "value": 3.0
      },
      {
        "id": "475",
        "measure": "electronicBids",
        "relatedLot": "1",
        "value": 3.0
      }
    ]
  },
  "buyer": {
    "id": "org-305",
    "name": "The Tall Ship Glenlee Trust"
  },
  "contracts": [
    {
      "awardID": "ocds-r6ebe6-0000818861-1",
      "dateSigned": "2026-02-10T00:00:00Z",
      "id": "ocds-r6ebe6-0000818861-1",
      "status": "active",
      "value": {
        "amount": 51829.0,
        "currency": "GBP"
      }
    }
  ],
  "date": "2026-02-10T00:00:00Z",
  "description": "(SC Ref:823292)",
  "id": "rls-60-FEB549258",
  "initiationType": "tender",
  "language": "EN",
  "links": [
    {
      "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000818861",
      "rel": "canonical"
    }
  ],
  "ocid": "ocds-r6ebe6-0000818861",
  "parties": [
    {
      "address": {
        "locality": "Glasgow",
        "postalCode": "G3 8RS",
        "region": "UK",
        "streetAddress": "150 Pointhouse Place"
      },
      "contactPoint": {
        "email": "fiona.greer@thetallship.com",
        "name": "Fiona Greer",
        "telephone": "+44 1413573699",
        "url": "http://"
      },
      "details": {
        "classifications": [
          {
            "id": "Registered charity",
            "scheme": "TED_CA_TYPE"
          },
          {
            "description": "Recreation, culture and religion",
            "id": "08",
            "scheme": "COFOG"
          }
        ],
        "url": "http://www.thetallship.com"
      },
      "id": "org-305",
      "identifier": {
        "legalName": "The Tall Ship Glenlee Trust"
      },
      "name": "The Tall Ship Glenlee Trust",
      "roles": [
        "buyer",
        "centralPurchasingBody"
      ]
    },
    {
      "address": {
        "locality": "Coatbridge",
        "postalCode": "ML5 4EF",
        "region": "UK",
        "streetAddress": "The Atrium Business Centre, North Caldeen Road"
      },
      "contactPoint": {
        "telephone": "+44 7752153885"
      },
      "details": {
        "scale": "sme",
        "url": "http://"
      },
      "id": "org-306",
      "identifier": {
        "legalName": "Saltire Lifts LTD"
      },
      "name": "Saltire Lifts LTD",
      "roles": [
        "supplier"
      ]
    },
    {
      "address": {
        "locality": "Glasgow",
        "postalCode": "G5 9DA",
        "streetAddress": "Sheriff Clerk\u00e2\u0080\u0099s Office, PO Box 23, 1 Carlton Place,"
      },
      "contactPoint": {
        "telephone": "+44 1414298888",
        "url": "https://www.scotcourts.gov.uk/the-courts/court-locations/glasgow-sheriff-court-and-justice-of-the-peace-court"
      },
      "id": "org-162",
      "identifier": {
        "legalName": "Glasgow Sheriff Court and Justice of the Peace Court"
      },
      "name": "Glasgow Sheriff Court and Justice of the Peace Court",
      "roles": [
        "reviewBody"
      ]
    }
  ],
  "relatedProcesses": [
    {
      "id": "1",
      "identifier": "2025/S 000-083806",
      "relationship": [
        "planning"
      ],
      "scheme": "EU-OJ"
    }
  ],
  "tag": [
    "award",
    "contract"
  ],
  "tender": {
    "classification": {
      "id": "42416100",
      "scheme": "CPV"
    },
    "coveredBy": [
      "GPA"
    ],
    "description": "The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund.\r\n Contractor turnkey project requirement definition:-\r\n 1.\tLift as presently configured with four access/ egress levels in weather deckhouse, \u00e2\u0080\u0098tween decks, mezzanine deck, hold, DDA compliant.\r\n 2.\tPlatform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons.\r\n 3.\tPower \u00e2\u0080\u0093 single phase 220 V AC.\r\n 4.\tCapable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship.\r\n 5.\tDoes not need to meet fire evacuation requirements.\r\n 6.\tDesign must accommodate the limited pit depth of \u003c150mm.\r\n 7.\tMeet or exceed 2006/42CE.\r\n 8.\tAll works must comply with CDM regs.\r\n 9.\tLift must be capable of a minimum of 20 operational cycles per hour.\r\n 10.\tNormal duty cycle is 8 hours per day with some operational days of up to 24 hours per day.\r\n 11.\t A five-year warranty on all parts and labour/ hours is required.\r\n 12.\t A five-year maintenance package is required.\r\n 13.\t A key control is required to avoid unauthorised operations.\r\n 14.\tTurnkey project for removal of all components of old lift installation and installation and commissioning of new lift.\r\n 15.\tAll responsibility for measurements, design, removal of old equipment and materials arisings from site.\r\n 16.\tAll transportation of equipment and materials, lifting and craneage are part of the turnkey contract.\r\n 17.\tAll works must comply with relevant Health and Safety at Work Act requirements.\r\n 18.\tInsurance must be provided for a sum of GBP 10 million pounds for any one occurrence.\r\n 19.\tProduct liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate.\r\n Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.",
    "documents": [
      {
        "description": "The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund.\r\n Contractor turnkey project requirement definition:-\r\n 1.\tLift as presently configured with four access/ egress levels in weather deckhouse, \u00e2\u0080\u0098tween decks, mezzanine deck, hold, DDA compliant.\r\n 2.\tPlatform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons.\r\n 3.\tPower \u00e2\u0080\u0093 single phase 220 V AC.\r\n 4.\tCapable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship.\r\n 5.\tDoes not need to meet fire evacuation requirements.\r\n 6.\tDesign must accommodate the limited pit depth of \u003c150mm.\r\n 7.\tMeet or exceed 2006/42CE.\r\n 8.\tAll works must comply with CDM regs.\r\n 9.\tLift must be capable of a minimum of 20 operational cycles per hour.\r\n 10.\tNormal duty cycle is 8 hours per day with some operational days of up to 24 hours per day.\r\n 11.\t A five-year warranty on all parts and labour/ hours is required.\r\n 12.\t A five-year maintenance package is required.\r\n 13.\t A key control is required to avoid unauthorised operations.\r\n 14.\tTurnkey project for removal of all components of old lift installation and installation and commissioning of new lift.\r\n 15.\tAll responsibility for measurements, design, removal of old equipment and materials arisings from site.\r\n 16.\tAll transportation of equipment and materials, lifting and craneage are part of the turnkey contract.\r\n 17.\tAll works must comply with relevant Health and Safety at Work Act requirements.\r\n 18.\tInsurance must be provided for a sum of GBP 10 million pounds for any one occurrence.\r\n 19.\tProduct liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate.\r\n Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.",
        "documentType": "awardNotice",
        "format": "text/html",
        "id": "FEB549258",
        "title": "REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)",
        "url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=FEB549258"
      }
    ],
    "id": "ocds-r6ebe6-0000818861",
    "items": [
      {
        "additionalClassifications": [
          {
            "id": "42416000",
            "scheme": "CPV"
          },
          {
            "id": "42416100",
            "scheme": "CPV"
          },
          {
            "id": "42416120",
            "scheme": "CPV"
          },
          {
            "id": "42416130",
            "scheme": "CPV"
          },
          {
            "id": "42419510",
            "scheme": "CPV"
          },
          {
            "id": "42417000",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "region": "UKM82"
          }
        ],
        "deliveryLocation": {
          "description": "The Tall Ship Glenlee, 150 Pointhouse Place, Glasgow, G3 8RS"
        },
        "id": "1",
        "relatedLot": "1"
      }
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "lots": [
      {
        "awardCriteria": {
          "criteria": [
            {
              "description": "20",
              "name": "Quality",
              "type": "quality"
            },
            {
              "description": "20",
              "type": "price"
            }
          ]
        },
        "description": "Contractor turnkey project requirement definition:-\r\n 1.\tLift as presently configured with four access/ egress levels in weather deckhouse, \u00e2\u0080\u0098tween decks, mezzanine deck, hold, DDA compliant.\r\n 2.\tPlatform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons.\r\n 3.\tPower \u00e2\u0080\u0093 single phase 220 V AC.\r\n 4.\tCapable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship.\r\n 5.\tDoes not need to meet fire evacuation requirements.\r\n 6.\tDesign must accommodate the limited pit depth of \u003c150mm.\r\n 7.\tMeet or exceed 2006/42CE.\r\n 8.\tAll works must comply with CDM regs.\r\n 9.\tLift must be capable of a minimum of 20 operational cycles per hour.\r\n 10.\tNormal duty cycle is 8 hours per day with some operational days of up to 24 hours per day.\r\n 11.\t A five-year warranty on all parts and labour/ hours is required.\r\n 12.\t A five-year maintenance package is required.\r\n 13.\t A key control is required to avoid unauthorised operations.\r\n 14.\tTurnkey project for removal of all components of old lift installation and installation and commissioning of new lift.\r\n 15.\tAll responsibility for measurements, design, removal of old equipment and materials arisings from site.\r\n 16.\tAll transportation of equipment and materials, lifting and craneage are part of the turnkey contract.\r\n 17.\tAll works must comply with relevant Health and Safety at Work Act requirements.\r\n 18.\tInsurance must be provided for a sum of GBP10 million pounds for any one occurrence.\r\n 19.\tProduct liability insurance in the sum of GBP10 million pounds in the aggregate and professional indemnity insurance in the aggregate.\r\n Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.",
        "hasOptions": false,
        "id": "1",
        "status": "complete"
      }
    ],
    "mainProcurementCategory": "goods",
    "procedure": {
      "acceleratedRationale": "We are ok with 15 days",
      "isAccelerated": true
    },
    "procurementMethod": "open",
    "procurementMethodDetails": "Open procedure",
    "status": "complete",
    "title": "REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)"
  }
}