← Back to opportunities

Pre-construction Manager

BGIS Global Integrated Solutions Ltd

Buyer Contact Info

Buyer Name: BGIS Global Integrated Solutions Ltd

Buyer Address: 7th Floor, 50 Broadway, London, SW1H 0BL, England

Contact Name: Sebastian Stowell

Contact Email: sebastian.stowell@bgis.com

Contact Telephone: +44 7540749729

Status
active
Procedure
open
Value
100000.0 GBP
Published
17 Apr 2025, 16:45
Deadline
09 May 2025, 11:00
Contract Start
01 Jun 2025, 23:00
Contract End
31 Oct 2025, 23:59
Category
works
CPV
34632100 - Mechanical signalling
Region
n/a
Awarded To
n/a
Official Source
Open Contracts Finder

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

Linked Documents

No linked documents found for this notice.

Opportunity Context

More Information Links

External Link: https://www.contractsfinder.service.gov.uk/Notice/aacf7d0c-aaa2-4f96-9647-648db593d92a

Link Description: Opportunity notice on Contracts Finder

External Link: https://www.mytenders.co.uk/search/show/search_view.aspx?ID=APR169646

Link Description: NOTE: To register your interest in this notice and obtain any additional information please visit the myTenders Web Site at the link provided.

Documents

Document Description: Opportunity notice on Contracts Finder

Document Description: NOTE: To register your interest in this notice and obtain any additional information please visit the myTenders Web Site at the link provided.

Raw Notice JSON

Expand raw payload
{
  "buyer": {
    "id": "GB-CFS-315449",
    "name": "BGIS Global Integrated Solutions Ltd"
  },
  "date": "2025-04-17T17:45:06+01:00",
  "id": "aacf7d0c-aaa2-4f96-9647-648db593d92a-841395",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-b5fd17-7fa08745-138e-4a36-ab7c-cf1dd0c96064",
  "parties": [
    {
      "address": {
        "countryName": "England",
        "locality": "London",
        "postalCode": "SW1H 0BL",
        "streetAddress": "7th Floor, 50 Broadway"
      },
      "contactPoint": {
        "email": "sebastian.stowell@bgis.com",
        "name": "Sebastian Stowell",
        "telephone": "+44 7540749729"
      },
      "id": "GB-CFS-315449",
      "identifier": {
        "legalName": "BGIS Global Integrated Solutions Ltd"
      },
      "name": "BGIS Global Integrated Solutions Ltd",
      "roles": [
        "buyer"
      ]
    }
  ],
  "tag": [
    "tender"
  ],
  "tender": {
    "classification": {
      "description": "Mechanical signalling",
      "id": "34632100",
      "scheme": "CPV"
    },
    "contractPeriod": {
      "endDate": "2025-10-31T23:59:59Z",
      "startDate": "2025-06-02T00:00:00+01:00"
    },
    "datePublished": "2025-04-17T17:45:06+01:00",
    "description": "Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS.\r\nThe site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system.\r\nThe existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included:\r\n- Replacement of selected IQ3 main plant controllers with IQ4 equivalents\r\n- Upgrade from Trend 963 to Trend IQVision graphical user interface\r\n- Integration of two separate site BMS networks into a unified IP network\r\n- Replacement of some IQL terminal unit controllers with IQEco units\r\nHowever, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by:\r\n- Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively\r\n- Removing obsolete I/O modules and integrating new hardware with existing field wiring\r\n- Rationalising the network architecture to ensure optimal performance and future maintainability\r\n- Enhancing the operator interface, trend logging, and graphical capabilities via IQVision\r\n- Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality\r\nThe building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval.\r\nContractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.",
    "documents": [
      {
        "datePublished": "2025-04-17T17:45:06+01:00",
        "description": "Opportunity notice on Contracts Finder",
        "documentType": "tenderNotice",
        "format": "text/html",
        "id": "1",
        "language": "en",
        "url": "https://www.contractsfinder.service.gov.uk/Notice/aacf7d0c-aaa2-4f96-9647-648db593d92a"
      },
      {
        "description": "NOTE: To register your interest in this notice and obtain any additional information please visit the myTenders Web Site at the link provided.",
        "documentType": "tenderNotice",
        "id": "2",
        "url": "https://www.mytenders.co.uk/search/show/search_view.aspx?ID=APR169646"
      }
    ],
    "id": "MT234376",
    "items": [
      {
        "deliveryAddresses": [
          {
            "countryName": "United Kingdom",
            "region": "London"
          }
        ],
        "id": "1"
      }
    ],
    "mainProcurementCategory": "works",
    "procurementMethod": "open",
    "procurementMethodDetails": "Open procedure (below threshold)",
    "status": "active",
    "suitability": {
      "sme": true,
      "vcse": false
    },
    "tenderPeriod": {
      "endDate": "2025-05-09T12:00:00+01:00"
    },
    "title": "Pre-construction Manager",
    "value": {
      "amount": 100000,
      "currency": "GBP"
    }
  }
}