← Back to opportunities

Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV

Buyer Contact Info

Buyer Name: Balfour Beatty VINCI Systra JV

Buyer Address: Astral House Imperial Way, Watford, WD244WW, UK

Contact Name: Manish Tailor

Contact Email: supplychain@bbvsjv.com

Contact Telephone: 07738982498

Status
active
Procedure
n/a
Value
10000000.0 GBP
Published
07 Feb 2025, 10:15
Deadline
21 Feb 2025, 12:00
Contract Start
30 Jun 2027, 23:00
Contract End
09 Dec 2030, 23:59
Category
works
CPV
45262670 - Metalworking
Region
n/a
Awarded To
n/a
Official Source
Open Contracts Finder

Description

WP12.4.1 - Installation of primary steel framework, installation of steel sub frames, cladding tracking systems, firestops, insulation, retail doors and glazing panels for retail units within the station SAB areas. 1.1.1.1 Scope: For a Subcontractor to fabricate, manufacture, and install fibre cement cladding, internal glazing and smoke downstands, and all internal structural steelwork to support the internal cladding and glazing scope to front of house and station concourse areas. The scope also to include overclad doors, skirtings trims and architectural finished louvres. Note the HS2 station internal artwork cladding panels provided by others. 1.1.1.2 The Contractor will issue a detailed design for pricing as part of the Invitation to Tender. The Subcontractor will develop the design and coordinate the interfaces of the works, ensuring it is compliant and accepted by the Project Manager prior to commencement of works. 1.1.1.3 It's anticipated the site works will commence in mid 2027 and are likely to finish end of 2030. Key materials for the Subcontractor to fabricate, manufacture and install: 1.1.1.4 Bespoke designed steel frame curtain walling system with fixed units, steel frame curtain walling system with single glazed fixed panels - 172m2. 1.1.1.5 Bespoke fabricated single glazed stick façade system, steel frame curtain walling system with clear faced single glazed units; glazed framed doors and opaque bulkhead infill panels - 577m2. 1.1.1.6 overall size 2000 x 2500mm high; double leaf doors - 10No. 1.1.1.7 Fire stops to the ceiling level - Approximately 720m. 1.1.1.8 Bespoke designed internal steel frame system, with fire rating and acoustic requirements incorporating a combination of clear and back painted fixed single-glazed units - 466m2. 1.1.1.9 Bespoke fabricated double-glazed system with insulated panels steel frame system with glazed facade system; double glazed fixed panels - 171m2. 1.1.1.10 Bespoke fabricated double-glazed system, steel frame system with glazed facade system; double glazed fixed panels - 97m2. 1.1.1.11 Fibre cement cladding lining with stainless steel trims and stainless-steel portal frame, supported by bracketry and rails which shall be fixed back to the vertical posts - 424m2. 1.1.1.12 Metal Cladding Lining, steel panels to form a rainscreen system shall be supported by bracketry and rails, including supply and install of vertical posts - 1353m2. 1.1.1.13 Installation of approximately 760m of ceiling firestopping. 1.1.1.14 Installation of 35No double leaf doors, fixings, door jambs and headers. 1.1.1.15 Installation of louvers, glazing manifestations, skirting, roller blinds, concertina smoke screen and down stands. NOTE: LIN-271 is the vitreous enamel art cladding panels, this does not form part of this scope. Further details can be found on the attached document

Linked Documents

No linked documents found for this notice.

Opportunity Context

More Information Links

External Link: https://www.contractsfinder.service.gov.uk/Notice/86b23a2a-e291-4791-aba5-3e7ff942bcfd

Link Description: Opportunity notice on Contracts Finder

External Link: https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=90178633

Link Description: Please follow this link to view the notice.

Documents

Document Description: Opportunity notice on Contracts Finder

Document Description: Please follow this link to view the notice.

Raw Notice JSON

Expand raw payload
{
  "buyer": {
    "id": "GB-CFS-130527",
    "name": "Balfour Beatty VINCI Systra JV"
  },
  "date": "2025-02-07T10:15:03Z",
  "id": "86b23a2a-e291-4791-aba5-3e7ff942bcfd-824263",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-b5fd17-10501913-9ae5-4ce6-9094-0b80c99c1ae8",
  "parties": [
    {
      "address": {
        "countryName": "UK",
        "locality": "Watford",
        "postalCode": "WD244WW",
        "streetAddress": "Astral House Imperial Way"
      },
      "contactPoint": {
        "email": "supplychain@bbvsjv.com",
        "name": "Manish Tailor",
        "telephone": "07738982498"
      },
      "id": "GB-CFS-130527",
      "identifier": {
        "legalName": "Balfour Beatty VINCI Systra JV"
      },
      "name": "Balfour Beatty VINCI Systra JV",
      "roles": [
        "buyer"
      ]
    }
  ],
  "tag": [
    "tender"
  ],
  "tender": {
    "additionalClassifications": [
      {
        "description": "Glazing work",
        "id": "45441000",
        "scheme": "CPV"
      },
      {
        "description": "Building construction work",
        "id": "45210000",
        "scheme": "CPV"
      },
      {
        "description": "Assembly of metal structures",
        "id": "45223100",
        "scheme": "CPV"
      },
      {
        "description": "Safety glass",
        "id": "39299200",
        "scheme": "CPV"
      },
      {
        "description": "Installation of metal structures",
        "id": "45223110",
        "scheme": "CPV"
      }
    ],
    "classification": {
      "description": "Metalworking",
      "id": "45262670",
      "scheme": "CPV"
    },
    "contractPeriod": {
      "endDate": "2030-12-09T23:59:59Z",
      "startDate": "2027-07-01T00:00:00+01:00"
    },
    "datePublished": "2025-02-07T10:15:03Z",
    "description": "WP12.4.1 - Installation of primary steel framework, installation of steel sub frames, cladding tracking systems, firestops, insulation, retail doors and glazing panels for retail units within the station SAB areas.\r\n      \r\n      1.1.1.1\tScope: For a Subcontractor to fabricate, manufacture, and install fibre cement cladding, internal glazing and smoke downstands, and all internal structural steelwork to support the internal cladding and glazing scope to front of house and station concourse areas. The scope also to include overclad doors, skirtings trims and architectural finished louvres. Note the HS2 station internal artwork cladding panels provided by others. \r\n      1.1.1.2\tThe Contractor will issue a detailed design for pricing as part of the Invitation to Tender. The Subcontractor will develop the design and coordinate the interfaces of the works, ensuring it is compliant and accepted by the Project Manager prior to commencement of works. \r\n      1.1.1.3\tIt\u0027s anticipated the site works will commence in mid 2027 and are likely to finish end of 2030. \r\n      Key materials for the Subcontractor to fabricate, manufacture and install: \r\n      1.1.1.4\tBespoke designed steel frame curtain walling system with fixed units, steel frame curtain walling system with single glazed fixed panels - 172m2.  \r\n      1.1.1.5\tBespoke fabricated single glazed stick fa\u00e7ade system, steel frame curtain walling system with clear faced single glazed units; glazed framed doors and opaque bulkhead infill panels - 577m2. \r\n      1.1.1.6\toverall size 2000 x 2500mm high; double leaf doors - 10No. \r\n      1.1.1.7\tFire stops to the ceiling level - Approximately 720m. \r\n      1.1.1.8\tBespoke designed internal steel frame system, with fire rating and acoustic requirements incorporating a combination of clear and back painted fixed single-glazed units - 466m2. \r\n      1.1.1.9\tBespoke fabricated double-glazed system with insulated panels steel frame system with glazed facade system; double glazed fixed panels - 171m2. \r\n      1.1.1.10\tBespoke fabricated double-glazed system, steel frame system with glazed facade system; double glazed fixed panels - 97m2. \r\n      1.1.1.11\tFibre cement cladding lining with stainless steel trims and stainless-steel portal frame, supported by bracketry and rails which shall be fixed back to the vertical posts - 424m2. \r\n      1.1.1.12\tMetal Cladding Lining, steel panels to form a rainscreen system shall be supported by bracketry and rails, including supply and install of vertical posts - 1353m2. \r\n      1.1.1.13\tInstallation of approximately 760m of ceiling firestopping. \r\n      1.1.1.14\tInstallation of 35No double leaf doors, fixings, door jambs and headers. \r\n      1.1.1.15\tInstallation of louvers, glazing manifestations, skirting, roller blinds, concertina smoke screen and down stands. \r\n      NOTE: LIN-271 is the vitreous enamel art cladding panels, this does not form part of this scope.\r\n      \r\n      Further details can be found on the attached document",
    "documents": [
      {
        "datePublished": "2025-02-07T10:15:03Z",
        "description": "Opportunity notice on Contracts Finder",
        "documentType": "tenderNotice",
        "format": "text/html",
        "id": "1",
        "language": "en",
        "url": "https://www.contractsfinder.service.gov.uk/Notice/86b23a2a-e291-4791-aba5-3e7ff942bcfd"
      },
      {
        "description": "Please follow this link to view the notice.",
        "documentType": "tenderNotice",
        "id": "2",
        "url": "https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=90178633"
      }
    ],
    "id": "C4N90178587",
    "items": [
      {
        "deliveryAddresses": [
          {
            "countryName": "United Kingdom",
            "region": "London"
          }
        ],
        "id": "1"
      }
    ],
    "mainProcurementCategory": "works",
    "minValue": {
      "amount": 5000000,
      "currency": "GBP"
    },
    "procurementMethodDetails": "",
    "status": "active",
    "suitability": {
      "sme": true,
      "vcse": false
    },
    "tenderPeriod": {
      "endDate": "2025-02-21T12:00:00Z"
    },
    "title": "Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station",
    "value": {
      "amount": 10000000,
      "currency": "GBP"
    }
  }
}