Buyer Name: BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Buyer Address: 5 Churchill Pl, London, E145HU, England
Contact Email: A66ExpressionOfInterest@balfourbeatty.com
Buyer Name: BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Buyer Address: 5 Churchill Pl, London, E145HU, England
Contact Email: A66ExpressionOfInterest@balfourbeatty.com
The M3 and Junction 9 (located in Winchester) connects South Hampshire with London, the Midlands and the North. Traffic levels are heavy at junction 9 between the M3 and A34, resulting in lengthy queues on the northbound off-slip of the M3 and A272 Spitfire Link, affecting journey times and road safety. The proposal is to make changes to Junction 9 so it has free flowing links between the M3 and A34 in both directions. The construction would include for the junction to be widened and build two new gyratory bridges allowing the M3 to increase from 3 lanes to 4 lanes. Also, the works would improve NMU facilities in and around the junction for both pedestrians and cyclists. Other construction works include but not limited to the following: -2no. underpasses for the M3 mainline and A34 Northbound -1no. pedestrian subway -9no. MS4s, 1no. long span and 1no. portal gantries -Footbridge over the River Itchen -6no. locations for sheet piling locations and 1no. for blockwork retaining wall -Site wide motorway communications installation -Site wide vehicle restraint barrier installation The scope of the works required are for the delivery, Installation, material provision and testing of the Sprayed Concrete for the underpasses on the M3J9 Improvement Scheme.
No linked documents found for this notice.
External Link: https://www.contractsfinder.service.gov.uk/Notice/86714978-5642-49a6-93f0-42f48b882da1
Link Description: Opportunity notice on Contracts Finder
Document Description: Opportunity notice on Contracts Finder
{
"buyer": {
"id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/UfZq8heB",
"name": "BALFOUR BEATTY CIVIL ENGINEERING LIMITED"
},
"date": "2025-09-09T10:47:11+01:00",
"id": "86714978-5642-49a6-93f0-42f48b882da1-862699",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-b5fd17-82f7eac0-100b-4928-9f57-556d0ff5b2d7",
"parties": [
{
"address": {
"countryName": "England",
"locality": "London",
"postalCode": "E145HU",
"streetAddress": "5 Churchill Pl"
},
"contactPoint": {
"email": "A66ExpressionOfInterest@balfourbeatty.com"
},
"id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/UfZq8heB",
"identifier": {
"id": "supplierregistration.cabinetoffice.gov.uk/UfZq8heB",
"legalName": "BALFOUR BEATTY CIVIL ENGINEERING LIMITED",
"scheme": "GB-SRS"
},
"name": "BALFOUR BEATTY CIVIL ENGINEERING LIMITED",
"roles": [
"buyer"
]
}
],
"tag": [
"tender"
],
"tender": {
"classification": {
"description": "Construction structures and materials; auxiliary products to construction (except electric apparatus)",
"id": "44000000",
"scheme": "CPV"
},
"contractPeriod": {
"endDate": "2027-03-02T23:59:59Z",
"startDate": "2026-09-16T00:00:00+01:00"
},
"datePublished": "2025-09-09T10:47:11+01:00",
"description": "The M3 and Junction 9 (located in Winchester) connects South Hampshire with London, the Midlands and the North. \r\n\r\nTraffic levels are heavy at junction 9 between the M3 and A34, resulting in lengthy queues on the northbound off-slip of the M3 and A272 Spitfire Link, affecting journey times and road safety. \r\n\r\nThe proposal is to make changes to Junction 9 so it has free flowing links between the M3 and A34 in both directions. \r\n\r\nThe construction would include for the junction to be widened and build two new gyratory bridges allowing the M3 to increase from 3 lanes to 4 lanes. Also, the works would improve NMU facilities in and \r\naround the junction for both pedestrians and cyclists.\r\n\r\nOther construction works include but not limited to \r\nthe following: \r\n-2no. underpasses for the M3 mainline and A34 Northbound \r\n-1no. pedestrian subway \r\n-9no. MS4s, 1no. long span and 1no. portal gantries \r\n-Footbridge over the River Itchen \r\n-6no. locations for sheet piling locations and 1no. for blockwork retaining wall \r\n-Site wide motorway communications installation \r\n-Site wide vehicle restraint barrier installation\r\n\r\nThe scope of the works required are for the delivery, Installation, material provision and testing of the Sprayed Concrete for the underpasses on the M3J9 Improvement Scheme.",
"documents": [
{
"datePublished": "2025-09-09T10:47:11+01:00",
"description": "Opportunity notice on Contracts Finder",
"documentType": "tenderNotice",
"format": "text/html",
"id": "1",
"language": "en",
"url": "https://www.contractsfinder.service.gov.uk/Notice/86714978-5642-49a6-93f0-42f48b882da1"
}
],
"id": "M3J9 Sprayed Concrete",
"items": [
{
"deliveryAddresses": [
{
"countryName": "United Kingdom",
"region": "South East"
},
{
"countryName": "United Kingdom",
"region": "South West"
}
],
"id": "1"
}
],
"mainProcurementCategory": "works",
"procurementMethod": "selective",
"procurementMethodDetails": "Competitive procedure with negotiation (above threshold)",
"status": "active",
"suitability": {
"sme": true,
"vcse": false
},
"tenderPeriod": {
"endDate": "2025-09-19T12:00:00+01:00"
},
"title": "M3J9 Sprayed Concrete",
"value": {
"amount": 850000,
"currency": "GBP"
}
}
}