Stoke-on-Trent City Council has allocated some funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and accommodates 6 adults along with a variety of kitchen appliances. \r An extension is required due to the large increase in the school's pupil population. In 2011 the kitchen provided around 150 meals however due to the vast increase in pupil numbers, the school is now providing upwards of 400 meals per day for pupils from Nursery to Year 6. The extension design is expected to comply with BB103.\r The Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council is now looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage.\r The contractor will need to provide services in a number of fields including architectural design, mechanical, electrical, structural and civil engineering, building surveying, quantity surveying, and project management. Cost management and quantity surveying services will be required to ensure that the design that is being developed can be delivered for the allocated budget. These services can be provided either in-house or through sub-contracted specialists. The successful contractor will have and be able to demonstrate expert knowledge and recent experience of working with educational buildings.\r The consultant will need to attend an inception meeting on site, and meetings to present the work to date at the end of each RIBA stage, with progress meetings throughout the work period arranged as necessary. These may be able to take the form of virtual meetings if appropriate.\r The City Council has allocated a total budget of £450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out.\r The deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period. The contractor will be required to provide a construction programme and logistics plan for the construction period as part of the PCSA process.\r At the end of the PCSA period, the contractor will provide their Contractors Proposals and the contract sum for the construction.
No linked documents found for this notice.
{
"awards": [
{
"contractPeriod": {
"endDate": "2025-08-31T23:59:59+01:00",
"startDate": "2025-01-01T00:00:00Z"
},
"date": "2024-12-23T00:00:00Z",
"datePublished": "2025-05-02T11:58:42+01:00",
"documents": [
{
"datePublished": "2025-05-02T11:58:42+01:00",
"description": "Awarded contract notice on Contracts Finder",
"documentType": "awardNotice",
"format": "text/html",
"id": "1",
"language": "en",
"url": "https://www.contractsfinder.service.gov.uk/Notice/3a6108e5-273f-42fa-9e24-fae0e834d4de"
}
],
"id": "ocds-b5fd17-dc521243-a085-48f6-88c0-e6d323ec8224-1",
"status": "active",
"suppliers": [
{
"id": "GB-CFS-274336",
"name": "Seddon Construction Ltd"
}
],
"value": {
"amount": 450000,
"currency": "GBP"
}
}
],
"buyer": {
"id": "GB-CFS-77988",
"name": "Stoke-on-Trent City Council"
},
"date": "2025-05-02T11:58:42+01:00",
"id": "3a6108e5-273f-42fa-9e24-fae0e834d4de-843581",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-b5fd17-dc521243-a085-48f6-88c0-e6d323ec8224",
"parties": [
{
"address": {
"countryName": "England",
"locality": "Stoke-on-Trent",
"postalCode": "ST4 1HH",
"streetAddress": "Civic Centre, Glebe Street"
},
"contactPoint": {
"email": "william.stuart@stoke.gov.uk",
"name": "William Stuart",
"telephone": "+44 1782232957"
},
"details": {
"url": "https://www.stoke.gov.uk"
},
"id": "GB-CFS-77988",
"identifier": {
"legalName": "Stoke-on-Trent City Council"
},
"name": "Stoke-on-Trent City Council",
"roles": [
"buyer"
]
},
{
"address": {
"streetAddress": "Plodder Lane, Edge Fold, Bolton, Greater Manchester, BL4 0NN, United Kingdom"
},
"details": {
"scale": "large",
"vcse": false
},
"id": "GB-CFS-274336",
"identifier": {
"legalName": "Seddon Construction Ltd"
},
"name": "Seddon Construction Ltd",
"roles": [
"supplier"
]
}
],
"tag": [
"award"
],
"tender": {
"additionalClassifications": [
{
"description": "Engineering services",
"id": "71300000",
"scheme": "CPV"
},
{
"description": "Construction-related services",
"id": "71500000",
"scheme": "CPV"
},
{
"description": "Architectural and related services",
"id": "71200000",
"scheme": "CPV"
}
],
"classification": {
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
},
"contractPeriod": {
"endDate": "2025-08-31T23:59:59+01:00",
"startDate": "2024-12-02T00:00:00Z"
},
"datePublished": "2024-10-04T18:17:31+01:00",
"description": "Stoke-on-Trent City Council has allocated some funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and accommodates 6 adults along with a variety of kitchen appliances. \\r\r\nAn extension is required due to the large increase in the school\u0027s pupil population. In 2011 the kitchen provided around 150 meals however due to the vast increase in pupil numbers, the school is now providing upwards of 400 meals per day for pupils from Nursery to Year 6. The extension design is expected to comply with BB103.\\r\r\nThe Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council is now looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage.\\r\r\nThe contractor will need to provide services in a number of fields including architectural design, mechanical, electrical, structural and civil engineering, building surveying, quantity surveying, and project management. Cost management and quantity surveying services will be required to ensure that the design that is being developed can be delivered for the allocated budget. These services can be provided either in-house or through sub-contracted specialists. The successful contractor will have and be able to demonstrate expert knowledge and recent experience of working with educational buildings.\\r\r\nThe consultant will need to attend an inception meeting on site, and meetings to present the work to date at the end of each RIBA stage, with progress meetings throughout the work period arranged as necessary. These may be able to take the form of virtual meetings if appropriate.\\r\r\nThe City Council has allocated a total budget of \u00a3450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out.\\r\r\nThe deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school\u0027s operation and meal provision during the term-time period. The contractor will be required to provide a construction programme and logistics plan for the construction period as part of the PCSA process.\\r\r\nAt the end of the PCSA period, the contractor will provide their Contractors Proposals and the contract sum for the construction.",
"id": "SOT001-DN743762-04614612",
"items": [
{
"deliveryAddresses": [
{
"countryName": "United Kingdom"
}
],
"id": "1"
}
],
"mainProcurementCategory": "works",
"procurementMethod": "open",
"procurementMethodDetails": "Open procedure",
"status": "complete",
"suitability": {
"sme": true,
"vcse": false
},
"tenderPeriod": {
"endDate": "2024-11-06T17:00:00Z"
},
"title": "Burnwood Community School Kitchen Extension Project",
"value": {
"amount": 450000,
"currency": "GBP"
}
}
}