Buyer Name: Wiltshire Council
Buyer Address: County Hall, Trowbridge, UKK15, BA14 8JN, United Kingdom
Contact Name: Rachel Candy
Contact Email: rachel.candy@wiltshire.gov.uk
Buyer Name: Wiltshire Council
Buyer Address: County Hall, Trowbridge, UKK15, BA14 8JN, United Kingdom
Contact Name: Rachel Candy
Contact Email: rachel.candy@wiltshire.gov.uk
Wiltshire Council intend to appoint a main Contractor via a two-stage procurement opportunity to deliver an important project on a full design and build basis across three primary schools in Wiltshire. Stage 1 of the procurement process is to seek expressions of interest from prospective Contractors with a view to shortlisting a maximum of four Contractors to be invited to submit a tender for the project. Stage 2 of the procurement process will be the Invitation to Tender (ITT) itself. The Requirement: The following schools have been identified by the Council as having temporary classrooms which are in a dilapidate state and are in need of replacement by way of either new build developments (Hullavington and Minety), and internal alterations and refurbishment of existing school buildings (Frogwell Primary School): 1. Frogwell Primary School, Chippenham, 2. Hullavington Primary School, Hullavington, Chippenham, 3. Minety Primary School, Malmesbury The purpose of this procurement opportunity is to appoint a contractor on a full design and build basis, in the first instance operating under a Pre-Construction Services Agreement and working closely with the Schools and the Council through RIBA Work Stages 1 to 4. This Stage 1 appointment will include the following outputs: 1. Operating under a single PCSA to deliver the RIBA Work Stages 1 to 4 inclusive for each of the three schools including. 2. The appointment of a Design Team to work with the School and the Employers Representative to fully design each of the three projects to the end of RIBA Stage 4 (technical/construction design) and to present the design for approval at the end of each RIBA work stage including cost plans for Employer approval, 3. To develop a detailed programme for RIBA Stages 1 to 7 for acceptance by the Employer for each of the three projects, 4. To obtain Building Regulations approval and Planning Permission for each of the three projects, 5. To work collaboratively with the Employers Representative to produce a Fixed Price Lump Sum to deliver the construction works for each of the three projects for approval by the Employer. On acceptance by the Council of the fixed price lump sum costs to deliver the construction works for each of the three projects, individual construction contracts will be entered into (JCT Intermediate form of contract with Contractor Design) for each school site. These will be the Stage 2 works, and each school project will be delivered as a standalone project through RIBA Work Stages 5, 6 and 7 (Construction, Handover and in Use). The indicative forecast cost estimate for the Stage 1 pre-construction works is £450k + VAT and the indicative forecast cost estimate of the Stage 2 post contract works is: Frogwell Primary School £2.0m + VAT = £2.4m Hullavington Primary School £2.0m + VAT = £2.4m Minety Primary School £0.75m + VAT = £0.9m --------------------------- Total Estimated Construction Cost incl VAT £5.7m Key Programme Dates as follows: RIBA Stages 1 to 4 End August 25 to End March 26 Package Pricing Stage End March 26 to End June 26 Final Design & Fixed Price Lump Sum Approvals End June 26 to Mid July 26 RIBA Stage 5 Construction Start August 26 Handover To be agreed for each of the school sites during the pre-construction stage of the project
No linked documents found for this notice.
Lot 1 Status: complete
Document Description: Not published
Contract Title: WO2151 Replacement of Temporary Classrooms at Frogwell, Hullavington and Minety Primary Schools
{
"awards": [
{
"id": "1",
"items": [
{
"additionalClassifications": [
{
"description": "Construction work for buildings relating to education and research",
"id": "45214000",
"scheme": "CPV"
},
{
"description": "Architectural, construction, engineering and inspection services",
"id": "71000000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKK15"
}
],
"id": "1",
"relatedLot": "1"
}
],
"mainProcurementCategory": "works",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-PPON-PNCJ-9415-ZYJM",
"name": "STEPNELL LIMITED"
}
]
}
],
"buyer": {
"id": "GB-PPON-PDZR-9968-RYYY",
"name": "Wiltshire Council"
},
"contracts": [
{
"aboveThreshold": true,
"agreedMetrics": [
{
"id": "1",
"title": "Programme Adherence"
},
{
"id": "2",
"title": "Budget Adherence"
},
{
"id": "3",
"title": "Stakeholder Engagement \u0026 Communication"
}
],
"awardID": "1",
"dateSigned": "2025-11-10T00:00:00+00:00",
"documents": [
{
"datePublished": "2025-11-20T10:04:11Z",
"description": "Contract details notice on Find a Tender",
"documentType": "contractNotice",
"format": "text/html",
"id": "075506-2025",
"noticeType": "UK7",
"url": "https://www.find-tender.service.gov.uk/Notice/075506-2025"
}
],
"id": "1",
"period": {
"endDate": "2027-10-31T23:59:59+00:00",
"startDate": "2025-11-12T00:00:00+00:00"
},
"status": "active",
"title": "WO2151 Replacement of Temporary Classrooms at Frogwell, Hullavington and Minety Primary Schools",
"value": {
"amount": 6054891.93,
"amountGross": 7265870.32,
"currency": "GBP"
}
}
],
"date": "2025-11-20T10:04:11Z",
"id": "075506-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-04f8e8",
"parties": [
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Trowbridge",
"postalCode": "BA14 8JN",
"region": "UKK15",
"streetAddress": "County Hall"
},
"contactPoint": {
"email": "rachel.candy@wiltshire.gov.uk",
"name": "Rachel Candy"
},
"details": {
"classifications": [
{
"description": "Public authority - sub-central government",
"id": "publicAuthoritySubCentralGovernment",
"scheme": "UK_CA_TYPE"
}
],
"url": "http://www.wiltshire.gov.uk/"
},
"id": "GB-PPON-PDZR-9968-RYYY",
"identifier": {
"id": "PDZR-9968-RYYY",
"scheme": "GB-PPON"
},
"name": "Wiltshire Council",
"roles": [
"buyer"
]
},
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Rugby",
"postalCode": "CV21 2UU",
"region": "UKG13",
"streetAddress": "Lawford Road"
},
"contactPoint": {
"email": "matthew.james@stepnell.co.uk"
},
"details": {
"publicServiceMissionOrganization": false,
"scale": "large",
"shelteredWorkshop": false,
"vcse": false
},
"id": "GB-PPON-PNCJ-9415-ZYJM",
"identifier": {
"id": "PNCJ-9415-ZYJM",
"scheme": "GB-PPON"
},
"name": "STEPNELL LIMITED",
"roles": [
"supplier"
]
}
],
"tag": [
"award",
"contract"
],
"tender": {
"description": "Wiltshire Council intend to appoint a main Contractor via a two-stage procurement opportunity to deliver an important project on a full design and build basis across three primary schools in Wiltshire.\nStage 1 of the procurement process is to seek expressions of interest from prospective Contractors with a view to shortlisting a maximum of four Contractors to be invited to submit a tender for the project.\nStage 2 of the procurement process will be the Invitation to Tender (ITT) itself.\nThe Requirement:\nThe following schools have been identified by the Council as having temporary classrooms which are in a dilapidate state and are in need of replacement by way of either new build developments (Hullavington and Minety), and internal alterations and refurbishment of existing school buildings (Frogwell Primary School):\n1. Frogwell Primary School, Chippenham,\n2. Hullavington Primary School, Hullavington, Chippenham,\n3. Minety Primary School, Malmesbury\nThe purpose of this procurement opportunity is to appoint a contractor on a full design and build basis, in the first instance operating under a Pre-Construction Services Agreement and working closely with the Schools and the Council through RIBA Work Stages 1 to 4. This Stage 1 appointment will include the following outputs:\n1. Operating under a single PCSA to deliver the RIBA Work Stages 1 to 4 inclusive for each of the three schools including.\n2. The appointment of a Design Team to work with the School and the Employers Representative to fully design each of the three projects to the end of RIBA Stage 4 (technical/construction design) and to present the design for approval at the end of each RIBA work stage including cost plans for Employer approval,\n3. To develop a detailed programme for RIBA Stages 1 to 7 for acceptance by the Employer for each of the three projects,\n4. To obtain Building Regulations approval and Planning Permission for each of the three projects,\n5. To work collaboratively with the Employers Representative to produce a Fixed Price Lump Sum to deliver the construction works for each of the three projects for approval by the Employer.\nOn acceptance by the Council of the fixed price lump sum costs to deliver the construction works for each of the three projects, individual construction contracts will be entered into (JCT Intermediate form of contract with Contractor Design) for each school site. These will be the Stage 2 works, and each school project will be delivered as a standalone project through RIBA Work Stages 5, 6 and 7 (Construction, Handover and in Use).\nThe indicative forecast cost estimate for the Stage 1 pre-construction works is \u00a3450k + VAT and the indicative forecast cost estimate of the Stage 2 post contract works is:\nFrogwell Primary School \u00a32.0m + VAT = \u00a32.4m\nHullavington Primary School \u00a32.0m + VAT = \u00a32.4m\nMinety Primary School \u00a30.75m + VAT = \u00a30.9m\n---------------------------\nTotal Estimated Construction Cost incl VAT \u00a35.7m\nKey Programme Dates as follows:\nRIBA Stages 1 to 4 End August 25 to End March 26\nPackage Pricing Stage End March 26 to End June 26\nFinal Design \u0026 Fixed Price Lump Sum Approvals End June 26 to Mid July 26\nRIBA Stage 5 Construction Start August 26\nHandover To be agreed for each of the school sites during the pre-construction stage of the project",
"documents": [
{
"description": "Not published",
"documentType": "conflictOfInterest",
"id": "conflictOfInterest"
}
],
"id": "WO2151",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"id": "1",
"status": "complete"
}
],
"procurementMethod": "selective",
"procurementMethodDetails": "Competitive flexible procedure",
"status": "complete",
"title": "WO2151 Replacement of Temporary Classrooms at Frogwell, Hullavington and Minety Primary Schools"
}
}