GNI and GNI (UK) are seeking experienced EPCS contractors to deliver a series of critical infrastructure upgrades as part of the SWSOS Decarbonisation Programme, a cornerstone of our commitment to achieving Net Zero by 2050. This tender covers multiple work packages, including the design, procurement, construction, and integration of new electric drive compressor halls across operational sites in Scotland. The successful contractor will manage complex interfaces between new and existing assets, ensuring seamless integration of mechanical, electrical, and control systems, while adhering to stringent cybersecurity and safety standards. This initiative represents a strategic investment in sustainable energy infrastructure and offers an opportunity to collaborate on projects of significant scale and impact within a multinational framework. SCOPE OF REQUIREMENTS: The scope of this tender encompasses overall project management and delivery across multiple work packages, including but not limited to the following: • Detailed Design Procurement o Procurement of detailed design for new compressor halls, based on the GNI suite of functional specifications. • Materials Procurement o Mechanical materials: high-pressure pipework, valves, and fittings. o Electrical materials: interconnecting cabling and junction boxes. o Instrumentation materials: transmitters and data cabling. Note: The second-stage tender process (CFC) will confirm the final requirements and clarify the full scope boundaries for the electric motor drive (EMD) package and the contractor's scope. • Construction Activities o Construction of new compressor halls. o Completion of all civil works, including excavations, foundations, structural steel, compressor foundations, and ancillary electrical buildings. o Installation of interconnecting pipework, electrical and control cabling, and junction boxes. • Integration and System Tie-ins o Integration of new electric drive compressors into the existing fleet of gas turbines. o Mechanical, electrical, and control system tie-ins at operational compressor stations across GNI UK sites in Scotland. • Security and Cybersecurity o Installation of security systems and implementation of cybersecurity controls in line with GNI specifications. • Testing and Commissioning o Full responsibility for FAT and SAT activities. o Commissioning and start-up of all new systems. Additional Scope Notes: • GNI may procure electric motor drive (EMD) packages separately. • GNI will manage all permitting and planning permissions. • GNI will separately upgrade incoming site electrical supply to power the new EMD packages. Indicative EPCS Scope Boundary: The EPCS scope is envisaged to cover all elements required for the delivery of an electric drive compressor station as outlined above. A more detailed scope is provided within the Appendices of the Qualification System Questionnaire documents.
No linked documents found for this notice.
Lot Description: GNI and GNI (UK) are seeking experienced EPCS contractors to deliver a series of critical infrastructure upgrades as part of the SWSOS Decarbonisation Programme, a cornerstone of our commitment to achieving Net Zero by 2050. This tender covers multiple work packages, including the design, procurement, construction, and integration of new electric drive compressor halls across operational sites in Scotland. The successful contractor will manage complex interfaces between new and existing assets, ensuring seamless integration of mechanical, electrical, and control systems, while adhering to stringent cybersecurity and safety standards. This initiative represents a strategic investment in sustainable energy infrastructure and offers an opportunity to collaborate on projects of significant scale and impact within a multinational framework. SCOPE OF REQUIREMENTS: The scope of this tender encompasses overall project management and delivery across multiple work packages, including but not limited to the following: • Detailed Design Procurement o Procurement of detailed design for new compressor halls, based on the GNI suite of functional specifications. • Materials Procurement o Mechanical materials: high-pressure pipework, valves, and fittings. o Electrical materials: interconnecting cabling and junction boxes. o Instrumentation materials: transmitters and data cabling. Note: The second-stage tender process (CFC) will confirm the final requirements and clarify the full scope boundaries for the electric motor drive (EMD) package and the contractor's scope. • Construction Activities o Construction of new compressor halls. o Completion of all civil works, including excavations, foundations, structural steel, compressor foundations, and ancillary electrical buildings. o Installation of interconnecting pipework, electrical and control cabling, and junction boxes. • Integration and System Tie-ins o Integration of new electric drive compressors into the existing fleet of gas turbines. o Mechanical, electrical, and control system tie-ins at operational compressor stations across GNI UK sites in Scotland. • Security and Cybersecurity o Installation of security systems and implementation of cybersecurity controls in line with GNI specifications. • Testing and Commissioning o Full responsibility for FAT and SAT activities. o Commissioning and start-up of all new systems. Additional Scope Notes: • GNI may procure electric motor drive (EMD) packages separately. • GNI will manage all permitting and planning permissions. • GNI will separately upgrade incoming site electrical supply to power the new EMD packages. Indicative EPCS Scope Boundary: The EPCS scope is envisaged to cover all elements required for the delivery of an electric drive compressor station as outlined above. A more detailed scope is provided within the Appendices of the Qualification System Questionnaire documents.
Lot 1 Status: active
Lot 1 Has Options: No
Lot 1 Contract Start: 2025-11-20T00:00:00Z
Lot 1 Contract End: 2035-11-20T23:59:59Z
{
"buyer": {
"id": "GB-FTS-130435",
"name": "Gas Networks Ireland"
},
"date": "2025-11-19T11:31:09Z",
"id": "075148-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-05e433",
"parties": [
{
"address": {
"countryName": "Ireland",
"locality": "Cork",
"region": "IE",
"streetAddress": "Gasworks Road"
},
"contactPoint": {
"email": "tenders@gasnetworks.ie",
"name": "Tender Admin",
"url": "https://www.etenders.gov.ie/epps/home.do"
},
"details": {
"classifications": [
{
"description": "Production, transport and distribution of gas and heat",
"id": "PRODUCTION_TRANSPORT_DISTRIBUTION_GAS_HEAT",
"scheme": "TED_CE_ACTIVITY"
}
],
"url": "https://www.gasnetworks.ie"
},
"id": "GB-FTS-130435",
"identifier": {
"legalName": "Gas Networks Ireland",
"noIdentifierRationale": "notOnAnyRegister"
},
"name": "Gas Networks Ireland",
"roles": [
"buyer"
]
},
{
"address": {
"countryName": "Ireland",
"locality": "Dublin",
"streetAddress": "High Court Central Office, Four Courts, Inns Quay"
},
"contactPoint": {
"email": "highcourtcentraloffice@courts.ie"
},
"details": {
"url": "http://www.courts.ie"
},
"id": "GB-FTS-23994",
"identifier": {
"legalName": "The High Court"
},
"name": "The High Court",
"roles": [
"reviewBody"
]
}
],
"tag": [
"tender"
],
"tender": {
"classification": {
"description": "Construction work for gas pipelines",
"id": "45231220",
"scheme": "CPV"
},
"coveredBy": [
"GPA"
],
"description": "GNI and GNI (UK) are seeking experienced EPCS contractors to deliver a series of critical infrastructure upgrades as part of the SWSOS Decarbonisation Programme, a cornerstone of our commitment to achieving Net Zero by 2050. This tender covers multiple work packages, including the design, procurement, construction, and integration of new electric drive compressor halls across operational sites in Scotland. The successful contractor will manage complex interfaces between new and existing assets, ensuring seamless integration of mechanical, electrical, and control systems, while adhering to stringent cybersecurity and safety standards. This initiative represents a strategic investment in sustainable energy infrastructure and offers an opportunity to collaborate on projects of significant scale and impact within a multinational framework. \nSCOPE OF REQUIREMENTS: \nThe scope of this tender encompasses overall project management and delivery across multiple work packages, including but not limited to the following: \n\u2022\tDetailed Design Procurement \no\tProcurement of detailed design for new compressor halls, based on the GNI suite of functional specifications. \n\u2022\tMaterials Procurement \no\tMechanical materials: high-pressure pipework, valves, and fittings. \no\tElectrical materials: interconnecting cabling and junction boxes. \no\tInstrumentation materials: transmitters and data cabling. \nNote: The second-stage tender process (CFC) will confirm the final requirements and clarify the full scope boundaries for the electric motor drive (EMD) package and the contractor\u0027s scope.\n\u2022\tConstruction Activities \no\tConstruction of new compressor halls. \no\tCompletion of all civil works, including excavations, foundations, structural steel, compressor foundations, and ancillary electrical buildings. \no\tInstallation of interconnecting pipework, electrical and control cabling, and junction boxes. \n\u2022\tIntegration and System Tie-ins \no\tIntegration of new electric drive compressors into the existing fleet of gas turbines. \no\tMechanical, electrical, and control system tie-ins at operational compressor stations across GNI UK sites in Scotland. \n\u2022\tSecurity and Cybersecurity \no\tInstallation of security systems and implementation of cybersecurity controls in line with GNI specifications. \n\u2022\tTesting and Commissioning \no\tFull responsibility for FAT and SAT activities. \no\tCommissioning and start-up of all new systems. \nAdditional Scope Notes: \n\u2022\tGNI may procure electric motor drive (EMD) packages separately. \n\u2022\tGNI will manage all permitting and planning permissions. \n\u2022\tGNI will separately upgrade incoming site electrical supply to power the new EMD packages. \nIndicative EPCS Scope Boundary: The EPCS scope is envisaged to cover all elements required for the delivery of an electric drive compressor station as outlined above. \nA more detailed scope is provided within the Appendices of the Qualification System Questionnaire documents.",
"hasRecurrence": false,
"id": "24/033",
"items": [
{
"additionalClassifications": [
{
"description": "Electric motors, generators and transformers",
"id": "31100000",
"scheme": "CPV"
},
{
"description": "Construction materials and associated items",
"id": "44100000",
"scheme": "CPV"
},
{
"description": "Engineering works and construction works",
"id": "45220000",
"scheme": "CPV"
},
{
"description": "Construction work for oil and gas pipelines",
"id": "45231200",
"scheme": "CPV"
},
{
"description": "Gas supply mains construction work",
"id": "45231221",
"scheme": "CPV"
},
{
"description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry",
"id": "45250000",
"scheme": "CPV"
},
{
"description": "Engineering services",
"id": "71300000",
"scheme": "CPV"
},
{
"description": "Construction consultancy services",
"id": "71530000",
"scheme": "CPV"
},
{
"description": "Construction management services",
"id": "71540000",
"scheme": "CPV"
},
{
"description": "Project-design services other than for construction work",
"id": "79421200",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKM"
},
{
"region": "UKN"
},
{
"region": "IE"
}
],
"deliveryLocation": {
"description": "Ireland ROI/Ireland NI/Scotland"
},
"id": "1",
"relatedLot": "1"
}
],
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"lots": [
{
"contractPeriod": {
"endDate": "2035-11-20T23:59:59Z",
"startDate": "2025-11-20T00:00:00Z"
},
"description": "GNI and GNI (UK) are seeking experienced EPCS contractors to deliver a series of critical infrastructure upgrades as part of the SWSOS Decarbonisation Programme, a cornerstone of our commitment to achieving Net Zero by 2050. This tender covers multiple work packages, including the design, procurement, construction, and integration of new electric drive compressor halls across operational sites in Scotland. The successful contractor will manage complex interfaces between new and existing assets, ensuring seamless integration of mechanical, electrical, and control systems, while adhering to stringent cybersecurity and safety standards. This initiative represents a strategic investment in sustainable energy infrastructure and offers an opportunity to collaborate on projects of significant scale and impact within a multinational framework. \nSCOPE OF REQUIREMENTS: \nThe scope of this tender encompasses overall project management and delivery across multiple work packages, including but not limited to the following: \n\u2022\tDetailed Design Procurement \no\tProcurement of detailed design for new compressor halls, based on the GNI suite of functional specifications. \n\u2022\tMaterials Procurement \no\tMechanical materials: high-pressure pipework, valves, and fittings. \no\tElectrical materials: interconnecting cabling and junction boxes. \no\tInstrumentation materials: transmitters and data cabling. \nNote: The second-stage tender process (CFC) will confirm the final requirements and clarify the full scope boundaries for the electric motor drive (EMD) package and the contractor\u0027s scope.\n\u2022\tConstruction Activities \no\tConstruction of new compressor halls. \no\tCompletion of all civil works, including excavations, foundations, structural steel, compressor foundations, and ancillary electrical buildings. \no\tInstallation of interconnecting pipework, electrical and control cabling, and junction boxes. \n\u2022\tIntegration and System Tie-ins \no\tIntegration of new electric drive compressors into the existing fleet of gas turbines. \no\tMechanical, electrical, and control system tie-ins at operational compressor stations across GNI UK sites in Scotland. \n\u2022\tSecurity and Cybersecurity \no\tInstallation of security systems and implementation of cybersecurity controls in line with GNI specifications. \n\u2022\tTesting and Commissioning \no\tFull responsibility for FAT and SAT activities. \no\tCommissioning and start-up of all new systems. \nAdditional Scope Notes: \n\u2022\tGNI may procure electric motor drive (EMD) packages separately. \n\u2022\tGNI will manage all permitting and planning permissions. \n\u2022\tGNI will separately upgrade incoming site electrical supply to power the new EMD packages. \nIndicative EPCS Scope Boundary: The EPCS scope is envisaged to cover all elements required for the delivery of an electric drive compressor station as outlined above. \nA more detailed scope is provided within the Appendices of the Qualification System Questionnaire documents.",
"hasOptions": false,
"hasRenewal": false,
"id": "1",
"status": "active",
"submissionTerms": {
"variantPolicy": "notAllowed"
}
}
],
"mainProcurementCategory": "works",
"procurementMethod": "selective",
"procurementMethodDetails": "Negotiated procedure with prior call for competition",
"status": "active",
"submissionMethod": [
"electronicSubmission"
],
"submissionMethodDetails": "https://www.etenders.gov.ie/epps/home.do",
"submissionTerms": {
"languages": [
"en"
]
},
"tenderPeriod": {
"endDate": "2035-11-20T12:00:00Z"
},
"title": "24/033 - Qualification System for the provision of Engineering, Procurement and Construction Services for South West Scotland Onshore System (SWSOS)"
}
}