Buyer Name: SP TRANSMISSION PLC
Buyer Address: 320 St. Vincent Street, Glasgow, UKM82, G25AD, United Kingdom
Contact Name: SPT Strategic Projects
Contact Email: SubstationsStrategicAgreement@scottishpower.com
Buyer Name: SP TRANSMISSION PLC
Buyer Address: 320 St. Vincent Street, Glasgow, UKM82, G25AD, United Kingdom
Contact Name: SPT Strategic Projects
Contact Email: SubstationsStrategicAgreement@scottishpower.com
SPT has appointed partners with the capacity and capability to deliver its strategic infrastructure priorities through a strategic collaborative delivery model. The agreement comprises five (5) Lots:- • Lot 1 is for Substation Civil Enabling Works • Lot 2 is for Substation Construction Works • Lot 3 is for Substation Enabling Works (Disaggregated Model) • Lot 4 is for Substation Civil Works (Disaggregated Model) • Lot 5 is for Substation Electrical Works (Disaggregated Model) The partners appointed to the agreement may be allocated projects and they will provide engineering and design, procure any materials and equipment, and carry out the construction works as per the agreed design with SPT. The contractual arrangements comprise a main Framework Agreement regulating the rights and obligations of SPT and the partners, with call-off contracts for individual packages using the NEC4 family of contracts. There is no guarantee, express or implied, that the appointed partners under the Framework Agreement will receive any, or a particular volume or value of work.
No linked documents found for this notice.
Lot Title: Substation Civil Enabling Works
Lot Description: Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037751 (the Contract Notice).
Lot 1 Status: cancelled
Lot 1 Has Options: Yes
Lot 1 Options: The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement.
Lot 1 Award Criterion (quality): Non-Commercial
Lot 1 Award Criterion (cost): Commercial
Lot Title: Substation Construction Works
Lot Description: Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037751 (the Contract Notice)
Lot 2 Status: cancelled
Lot 2 Has Options: Yes
Lot 2 Options: The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement.
Lot 2 Award Criterion (quality): Non-Commercial
Lot 2 Award Criterion (cost): Commercial
Lot Title: Substation Enabling Works (Disaggregated Model)
Lot 3 Status: cancelled
Lot 3 Has Options: Yes
Lot 3 Options: The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement.
Lot 3 Award Criterion (quality): Non-Commercial
Lot 3 Award Criterion (cost): Commercial
Lot Title: Substation Civil Works (Disaggregated Model)
Lot 4 Status: cancelled
Lot 4 Has Options: Yes
Lot 4 Options: The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement.
Lot 4 Award Criterion (quality): Non-Commercial
Lot 4 Award Criterion (cost): Commercial
Lot Title: Substation Electrical Works (Disaggregated Model)
Lot 5 Status: cancelled
Lot 5 Has Options: Yes
Lot 5 Options: The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement.
Lot 5 Award Criterion (quality): Non-Commercial
Lot 5 Award Criterion (cost): Commercial
Contract Title: Substation Civil Enabling Works
Contract Title: Substation Construction Works
Contract Title: Substation Enabling Works (Disaggregated Model)
Contract Title: Substation Civil Works (Disaggregated Model)
Contract Title: Substation Electrical Works (Disaggregated Model)
Award Title: Substation Civil Enabling Works
Award Title: Substation Construction Works
Award Title: Substation Enabling Works (Disaggregated Model)
Award Title: Substation Civil Works (Disaggregated Model)
Award Title: Substation Electrical Works (Disaggregated Model)
{
"awards": [
{
"id": "050888-2025-1",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-NI064545",
"name": "Adman Civil Projects Limited"
},
{
"id": "GB-COH-SC251886",
"name": "George Leslie Limited"
},
{
"id": "GB-COH-SC040891",
"name": "I. \u0026 H. Brown Limited"
},
{
"id": "GB-COH-SC057943",
"name": "Luddon Construction Limited"
},
{
"id": "GB-COH-04273754",
"name": "Morgan Sindall Construction \u0026 Infrastructure Ltd"
},
{
"id": "GB-COH-NI004078",
"name": "Northstone (NI) Limited"
},
{
"id": "GB-COH-SC028565",
"name": "R.J. McLeod (Contractors) Limited"
}
],
"title": "Substation Civil Enabling Works"
},
{
"id": "050888-2025-2",
"relatedLots": [
"2"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-12930461",
"name": "Aureos Energy Limited"
},
{
"id": "GB-COH-06224703",
"name": "Kirby Group Engineering (UK) Limited"
},
{
"id": "GB-COH-11365765",
"name": "Linxon UK Ltd"
},
{
"id": "GB-COH-04273754",
"name": "Morgan Sindall Construction \u0026 Infrastructure Ltd"
},
{
"id": "GB-COH-00631825",
"name": "Siemens Energy Limited"
},
{
"id": "GB-COH-04955841",
"name": "UK Grid Solutions Limited"
}
],
"title": "Substation Construction Works"
},
{
"id": "050888-2025-3",
"relatedLots": [
"3"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-NI064545",
"name": "Adman Civil Projects Limited"
},
{
"id": "GB-COH-00995892",
"name": "Amalgamated Construction Ltd"
},
{
"id": "GB-COH-SC251886",
"name": "George Leslie Limited"
},
{
"id": "GB-COH-SC040891",
"name": "I. \u0026 H. Brown Limited"
},
{
"id": "GB-COH-SC057943",
"name": "Luddon Construction Limited"
},
{
"id": "GB-COH-04273754",
"name": "Morgan Sindall Construction \u0026 Infrastructure Ltd"
},
{
"id": "GB-COH-SC028565",
"name": "R.J. McLeod (Contractors) Limited"
}
],
"title": "Substation Enabling Works (Disaggregated Model)"
},
{
"id": "050888-2025-4",
"relatedLots": [
"4"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-NI064545",
"name": "Adman Civil Projects Limited"
},
{
"id": "GB-COH-00995892",
"name": "Amalgamated Construction Ltd"
},
{
"id": "GB-COH-SC251886",
"name": "George Leslie Limited"
},
{
"id": "GB-COH-SC040891",
"name": "I. \u0026 H. Brown Limited"
},
{
"id": "GB-COH-SC057943",
"name": "Luddon Construction Limited"
},
{
"id": "GB-COH-04273754",
"name": "Morgan Sindall Construction \u0026 Infrastructure Ltd"
},
{
"id": "GB-COH-SC028565",
"name": "R.J. McLeod (Contractors) Limited"
}
],
"title": "Substation Civil Works (Disaggregated Model)"
},
{
"id": "050888-2025-5",
"relatedLots": [
"5"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-12930461",
"name": "Aureos Energy Limited"
},
{
"id": "GB-COH-06224703",
"name": "Kirby Group Engineering (UK) Limited"
},
{
"id": "GB-COH-11365765",
"name": "Linxon UK Ltd"
},
{
"id": "GB-COH-00245626",
"name": "M Group Energy (Network Infrastructure) Limited"
},
{
"id": "GB-FTS-158716",
"name": "Painhas S.A."
}
],
"title": "Substation Electrical Works (Disaggregated Model)"
}
],
"bids": {
"statistics": [
{
"id": "1",
"measure": "bids",
"relatedLot": "1",
"value": 7
},
{
"id": "3",
"measure": "bids",
"relatedLot": "2",
"value": 6
},
{
"id": "2",
"measure": "electronicBids",
"relatedLot": "1",
"value": 7
},
{
"id": "4",
"measure": "electronicBids",
"relatedLot": "2",
"value": 6
}
]
},
"buyer": {
"id": "GB-COH-SC189126",
"name": "SP TRANSMISSION PLC"
},
"contracts": [
{
"awardID": "050888-2025-1",
"dateSigned": "2024-12-02T00:00:00Z",
"id": "050888-2025-1",
"status": "active",
"title": "Substation Civil Enabling Works",
"value": {
"amount": 700000000,
"currency": "GBP"
}
},
{
"awardID": "050888-2025-2",
"dateSigned": "2024-12-02T00:00:00Z",
"id": "050888-2025-2",
"status": "active",
"title": "Substation Construction Works",
"value": {
"amount": 750000000,
"currency": "GBP"
}
},
{
"awardID": "050888-2025-3",
"dateSigned": "2024-12-02T00:00:00Z",
"id": "050888-2025-3",
"status": "active",
"title": "Substation Enabling Works (Disaggregated Model)",
"value": {
"amount": 385000000,
"currency": "GBP"
}
},
{
"awardID": "050888-2025-4",
"dateSigned": "2024-12-02T00:00:00Z",
"id": "050888-2025-4",
"status": "active",
"title": "Substation Civil Works (Disaggregated Model)",
"value": {
"amount": 330000000,
"currency": "GBP"
}
},
{
"awardID": "050888-2025-5",
"dateSigned": "2024-12-02T00:00:00Z",
"id": "050888-2025-5",
"status": "active",
"title": "Substation Electrical Works (Disaggregated Model)",
"value": {
"amount": 235000000,
"currency": "GBP"
}
}
],
"date": "2025-08-22T13:35:33+01:00",
"description": "All financial values stated in this notice are calculated using current prices plus assumed inflation based on RPI forecast rates to 2034. All values are estimates only and the final outturn values will depend on the precise works and services required to be delivered, the means of delivery, the way in which programme and project risks materialise, the actual rates of inflation up to completion of the programme, and other factors.\nThe precise details of each identified project, including specific location, route, form of electricity network infrastructure, construction methodology, and any associated mitigation or enhancement schemes are indicative and remain to be confirmed. The final project details are subject to all necessary consents being obtained (such as any required DCO, Electricity Act 1989 consent or planning permission), the requirements of those consents, and the terms of any necessary land rights to be secured to enable project delivery. SPT gives no commitment as to the basis on which any necessary consents or land rights will be applied for, or obtained.\nThis Framework Agreement, along with other framework agreements that SPT may procure through separate procurement processes, will contribute to SPT\u0027s delivery of its strategic projects under the Holistic Network Design (HND) model (which are funded by the Accelerated Strategic Transmission Investment, Large Onshore Transmission Investment and Medium Sized Investment Project frameworks) as well as any baseline projects forming part of SPT\u0027s RIIO-T2 and RIIO-T/3 price control settlements and any customer connection projects that SPT considers appropriate to be delivered under this model. For the avoidance of doubt, SPT may have separate arrangements for the delivery of similar works to the works which SPT intends to procure under the Framework Agreement but such arrangements may be based on a different delivery model.\nIt is currently anticipated that SPT\u0027s HND programme will be delivered by the partners through these Framework Agreements and the call-off contracts awarded under them, and the full scope of that is included in the scope advertised by this notice.\nHowever, and without limiting that, the works and services awarded to the partners through this Framework Agreement, and the other framework agreements, may extend beyond work required for the HND programme to involve additional works and services, through the award of further contracts in reliance on the procedure in Regulation 48(4)(e) of the Utilities Contracts (Scotland) Regulations 2016 concerning direct awards for new works, services or both, consisting of the repetition of similar works or services. Any contracts for new works or services consisting of the repetition of similar works or services will (as relevant in the circumstances) conform to the requirements of SPT\u0027s HND programme and / or for a particular project for which contracts are called-off under these Framework Agreements",
"id": "050888-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-04295a",
"parties": [
{
"address": {
"countryName": "United Kingdom",
"locality": "Glasgow",
"postalCode": "G25AD",
"region": "UKM82",
"streetAddress": "320 St. Vincent Street"
},
"contactPoint": {
"email": "SubstationsStrategicAgreement@scottishpower.com",
"name": "SPT Strategic Projects"
},
"details": {
"classifications": [
{
"description": "Electricity",
"id": "ELECTRICITY",
"scheme": "TED_CE_ACTIVITY"
}
],
"url": "https://www.spenergynetworks.co.uk/"
},
"id": "GB-COH-SC189126",
"identifier": {
"id": "SC189126",
"legalName": "SP TRANSMISSION PLC",
"scheme": "GB-COH"
},
"name": "SP TRANSMISSION PLC",
"roles": [
"buyer"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Co.Tyrone",
"region": "UKN"
},
"details": {
"scale": "sme"
},
"id": "GB-COH-NI064545",
"identifier": {
"id": "NI064545",
"legalName": "Adman Civil Projects Limited",
"scheme": "GB-COH"
},
"name": "Adman Civil Projects Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "London",
"region": "UK"
},
"details": {
"scale": "large"
},
"id": "GB-COH-12930461",
"identifier": {
"id": "12930461",
"legalName": "Aureos Energy Limited",
"scheme": "GB-COH"
},
"name": "Aureos Energy Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Glasgow",
"region": "UKM"
},
"details": {
"scale": "large"
},
"id": "GB-COH-SC251886",
"identifier": {
"id": "SC251886",
"legalName": "George Leslie Limited",
"scheme": "GB-COH"
},
"name": "George Leslie Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Perth",
"region": "UKM"
},
"details": {
"scale": "large"
},
"id": "GB-COH-SC040891",
"identifier": {
"id": "SC040891",
"legalName": "I. \u0026 H. Brown Limited",
"scheme": "GB-COH"
},
"name": "I. \u0026 H. Brown Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Glasgow",
"region": "UKM"
},
"details": {
"scale": "large"
},
"id": "GB-COH-SC057943",
"identifier": {
"id": "SC057943",
"legalName": "Luddon Construction Limited",
"scheme": "GB-COH"
},
"name": "Luddon Construction Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "London",
"region": "UK"
},
"details": {
"scale": "large"
},
"id": "GB-COH-04273754",
"identifier": {
"id": "04273754",
"legalName": "Morgan Sindall Construction \u0026 Infrastructure Ltd",
"scheme": "GB-COH"
},
"name": "Morgan Sindall Construction \u0026 Infrastructure Ltd",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Belfast",
"region": "UKN"
},
"details": {
"scale": "large"
},
"id": "GB-COH-NI004078",
"identifier": {
"id": "NI004078",
"legalName": "Northstone (NI) Limited",
"scheme": "GB-COH"
},
"name": "Northstone (NI) Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Glasgow",
"region": "UKM"
},
"details": {
"scale": "large"
},
"id": "GB-COH-SC028565",
"identifier": {
"id": "SC028565",
"legalName": "R.J. McLeod (Contractors) Limited",
"scheme": "GB-COH"
},
"name": "R.J. McLeod (Contractors) Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Middlesex",
"region": "UK"
},
"details": {
"scale": "large"
},
"id": "GB-COH-06224703",
"identifier": {
"id": "06224703",
"legalName": "Kirby Group Engineering (UK) Limited",
"scheme": "GB-COH"
},
"name": "Kirby Group Engineering (UK) Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Surrey",
"region": "UK"
},
"details": {
"scale": "large"
},
"id": "GB-COH-11365765",
"identifier": {
"id": "11365765",
"legalName": "Linxon UK Ltd",
"scheme": "GB-COH"
},
"name": "Linxon UK Ltd",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Newcastle Upon Tyne",
"region": "UK"
},
"details": {
"scale": "large"
},
"id": "GB-COH-00631825",
"identifier": {
"id": "00631825",
"legalName": "Siemens Energy Limited",
"scheme": "GB-COH"
},
"name": "Siemens Energy Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Stafford",
"region": "UK"
},
"details": {
"scale": "large"
},
"id": "GB-COH-04955841",
"identifier": {
"id": "04955841",
"legalName": "UK Grid Solutions Limited",
"scheme": "GB-COH"
},
"name": "UK Grid Solutions Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Leeds",
"region": "UK"
},
"details": {
"scale": "large"
},
"id": "GB-COH-00995892",
"identifier": {
"id": "00995892",
"legalName": "Amalgamated Construction Ltd",
"scheme": "GB-COH"
},
"name": "Amalgamated Construction Ltd",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Stevenage",
"region": "UK"
},
"details": {
"scale": "large"
},
"id": "GB-COH-00245626",
"identifier": {
"id": "00245626",
"legalName": "M Group Energy (Network Infrastructure) Limited",
"scheme": "GB-COH"
},
"name": "M Group Energy (Network Infrastructure) Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "Portugal",
"locality": "Viana do Castelo",
"region": "PT"
},
"details": {
"scale": "large"
},
"id": "GB-FTS-158716",
"identifier": {
"legalName": "Painhas S.A.",
"noIdentifierRationale": "notOnAnyRegister"
},
"name": "Painhas S.A.",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Glasgow",
"postalCode": "G5 9DA",
"streetAddress": "1 Carlton Place"
},
"id": "GB-FTS-2553",
"identifier": {
"legalName": "Glasgow Sheriff Court"
},
"name": "Glasgow Sheriff Court",
"roles": [
"reviewBody"
]
}
],
"tag": [
"award",
"contract"
],
"tender": {
"classification": {
"description": "Substation construction work",
"id": "45232220",
"scheme": "CPV"
},
"description": "SPT has appointed partners with the capacity and capability to deliver its strategic infrastructure priorities through a strategic collaborative delivery model.\nThe agreement comprises five (5) Lots:-\n\u2022 Lot 1 is for Substation Civil Enabling Works\n\u2022 Lot 2 is for Substation Construction Works\n\u2022 Lot 3 is for Substation Enabling Works (Disaggregated Model)\n\u2022 Lot 4 is for Substation Civil Works (Disaggregated Model)\n\u2022 Lot 5 is for Substation Electrical Works (Disaggregated Model)\nThe partners appointed to the agreement may be allocated projects and they will provide engineering and design, procure any materials and equipment, and carry out the construction works as per the agreed design with SPT.\nThe contractual arrangements comprise a main Framework Agreement regulating the rights and obligations of SPT and the partners, with call-off contracts for individual packages using the NEC4 family of contracts.\nThere is no guarantee, express or implied, that the appointed partners under the Framework Agreement will receive any, or a particular volume or value of work.",
"id": "SPT-SS-SA",
"items": [
{
"additionalClassifications": [
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKM"
}
],
"id": "1",
"relatedLot": "1"
},
{
"additionalClassifications": [
{
"description": "Substation construction work",
"id": "45232220",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKM"
}
],
"id": "2",
"relatedLot": "2"
},
{
"additionalClassifications": [
{
"description": "Site preparation work",
"id": "45100000",
"scheme": "CPV"
},
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKM"
}
],
"id": "3",
"relatedLot": "3"
},
{
"additionalClassifications": [
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Building installation work",
"id": "45300000",
"scheme": "CPV"
},
{
"description": "Building completion work",
"id": "45400000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKM"
}
],
"id": "4",
"relatedLot": "4"
},
{
"additionalClassifications": [
{
"description": "Construction work",
"id": "45000000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKM"
}
],
"id": "5",
"relatedLot": "5"
}
],
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"lots": [
{
"awardCriteria": {
"criteria": [
{
"description": "50%",
"name": "Non-Commercial",
"type": "quality"
},
{
"description": "50%",
"name": "Commercial",
"type": "cost"
}
]
},
"description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037751 (the Contract Notice).",
"hasOptions": true,
"id": "1",
"options": {
"description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT\u0027s option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
},
"status": "cancelled",
"title": "Substation Civil Enabling Works"
},
{
"awardCriteria": {
"criteria": [
{
"description": "50%",
"name": "Non-Commercial",
"type": "quality"
},
{
"description": "50%",
"name": "Commercial",
"type": "cost"
}
]
},
"description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037751 (the Contract Notice)",
"hasOptions": true,
"id": "2",
"options": {
"description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT\u0027s option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
},
"status": "cancelled",
"title": "Substation Construction Works"
},
{
"awardCriteria": {
"criteria": [
{
"description": "50%",
"name": "Non-Commercial",
"type": "quality"
},
{
"description": "50%",
"name": "Commercial",
"type": "cost"
}
]
},
"description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037751 (the Contract Notice).",
"hasOptions": true,
"id": "3",
"options": {
"description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT\u0027s option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
},
"status": "cancelled",
"title": "Substation Enabling Works (Disaggregated Model)"
},
{
"awardCriteria": {
"criteria": [
{
"description": "50%",
"name": "Non-Commercial",
"type": "quality"
},
{
"description": "50%",
"name": "Commercial",
"type": "cost"
}
]
},
"description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037751 (the Contract Notice).",
"hasOptions": true,
"id": "4",
"options": {
"description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT\u0027s option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
},
"status": "cancelled",
"title": "Substation Civil Works (Disaggregated Model)"
},
{
"awardCriteria": {
"criteria": [
{
"description": "50%",
"name": "Non-Commercial",
"type": "quality"
},
{
"description": "50%",
"name": "Commercial",
"type": "cost"
}
]
},
"description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037751 (the Contract Notice).",
"hasOptions": true,
"id": "5",
"options": {
"description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT\u0027s option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
},
"status": "cancelled",
"title": "Substation Electrical Works (Disaggregated Model)"
}
],
"mainProcurementCategory": "works",
"procurementMethod": "selective",
"procurementMethodDetails": "Negotiated procedure with prior call for competition",
"reviewDetails": "Any proceedings relating to a breach of a duty owed by SPT to an economic operator under the Utilities Contracts (Scotland) Regulations 2016 in relation to this procurement must be started within 30 days beginning with the date when the economic operator first knew or ought to have known that grounds for starting the proceedings had arisen unless the court considers that there is a good reason for extending the period within which proceedings may be brought, in which case the court may extend that period up to a maximum of 3 months from that date.",
"status": "complete",
"techniques": {
"hasFrameworkAgreement": true
},
"title": "SPT - Strategic Agreement for Substation Works"
}
}