Buyer Name: Natural England
Buyer Address: Seacole Building, 2 Marsham Street, London, UKI32, SW1P 4DF, United Kingdom
Contact Name: Rob Carver
Contact Email: rob.carver@naturalengland.org.uk
Buyer Name: Natural England
Buyer Address: Seacole Building, 2 Marsham Street, London, UKI32, SW1P 4DF, United Kingdom
Contact Name: Rob Carver
Contact Email: rob.carver@naturalengland.org.uk
The access tracks running through Ham Street Woods National Nature Reserve / SSSI to the south of Ashford in Kent (managed by Natural England) become very wet and muddy in winter due to the clay substrate. The main aim of this project is to surface 300m of track that link to a 1km surfaced bridleway (the main public right of way bisecting the reserve) to create year-round circular routes for visitors, thereby enhancing their enjoyment of the site and reducing disturbance to the wider woodland. The works also include a top dressing to 425m of bridleway to bring it up to standard. The works are likely to take up to three weeks and will need to be completed by the end of August while ground conditions remain favourable.
No linked documents found for this notice.
Lot 1 Status: complete
{
"awards": [
{
"id": "1",
"items": [
{
"additionalClassifications": [
{
"description": "Drainage and surface works",
"id": "45232451",
"scheme": "CPV"
},
{
"description": "Resurfacing works",
"id": "45233251",
"scheme": "CPV"
},
{
"description": "Surface work for footpaths",
"id": "45233253",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKJ"
}
],
"id": "1",
"relatedLot": "1"
}
],
"mainProcurementCategory": "works",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-FTS-155583",
"name": "MRF CONTRACTING LIMITED"
}
]
}
],
"buyer": {
"id": "GB-PPON-PJDG-6588-XDMM",
"name": "Natural England"
},
"contracts": [
{
"aboveThreshold": false,
"awardID": "1",
"dateSigned": "2025-07-24T00:00:00+01:00",
"documents": [
{
"datePublished": "2025-07-25T08:31:56+01:00",
"description": "Contract details notice on Find a Tender",
"documentType": "contractNotice",
"format": "text/html",
"id": "042987-2025",
"noticeType": "UK7",
"url": "https://www.find-tender.service.gov.uk/Notice/042987-2025"
}
],
"id": "1",
"period": {
"endDate": "2025-08-29T23:59:59+01:00",
"startDate": "2025-08-18T00:00:00+01:00"
},
"status": "active",
"value": {
"amount": 36069.33,
"amountGross": 43283.2,
"currency": "GBP"
}
}
],
"date": "2025-07-25T08:31:56+01:00",
"id": "042987-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-05572e",
"parties": [
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "London",
"postalCode": "SW1P 4DF",
"region": "UKI32",
"streetAddress": "Seacole Building, 2 Marsham Street"
},
"contactPoint": {
"email": "rob.carver@naturalengland.org.uk",
"name": "Rob Carver"
},
"details": {
"classifications": [
{
"description": "Public authority - central government",
"id": "publicAuthorityCentralGovernment",
"scheme": "UK_CA_TYPE"
}
]
},
"id": "GB-PPON-PJDG-6588-XDMM",
"identifier": {
"id": "PJDG-6588-XDMM",
"scheme": "GB-PPON"
},
"name": "Natural England",
"roles": [
"buyer"
]
},
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Birchington",
"postalCode": "CT7 0JL",
"region": "UKJ44",
"streetAddress": "Monkton Road Farm Seamark Road, Brooksend"
},
"contactPoint": {
"email": "hannah@mrfcontracting.com"
},
"details": {
"scale": "sme",
"vcse": false
},
"id": "GB-FTS-155583",
"name": "MRF CONTRACTING LIMITED",
"roles": [
"supplier"
]
}
],
"tag": [
"award",
"contract"
],
"tender": {
"description": "The access tracks running through Ham Street Woods National Nature Reserve / SSSI to the south of Ashford in Kent (managed by Natural England) become very wet and muddy in winter due to the clay substrate. The main aim of this project is to surface 300m of track that link to a 1km surfaced bridleway (the main public right of way bisecting the reserve) to create year-round circular routes for visitors, thereby enhancing their enjoyment of the site and reducing disturbance to the wider woodland. The works also include a top dressing to 425m of bridleway to bring it up to standard. The works are likely to take up to three weeks and will need to be completed by the end of August while ground conditions remain favourable.",
"id": "NE02072025HSW",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"id": "1",
"status": "complete"
}
],
"procurementMethod": "open",
"procurementMethodDetails": "Below threshold - open competition",
"status": "complete",
"title": "Ham Street Woods NNR Track Surfacing 2025"
}
}