← Back to opportunities

Building Decarbonisation Projects at Williamson Park, The Storey and City Lab

Lancaster City Council

Buyer Contact Info

Buyer Name: Lancaster City Council

Buyer Address: Town Hall, Dalton Square, Lancaster, UK, LA1 1PJ, United Kingdom

Contact Name: Mr Justin Shaw

Contact Email: jshaw@lancaster.gov.uk

Contact Telephone: +44 1524582375

Status
complete
Procedure
open
Value
2937317.0 GBP
Published
07 Jul 2025, 10:30
Deadline
n/a
Contract Start
n/a
Contract End
n/a
Category
works
CPV
45000000 - Construction work
Region
n/a
Awarded To
Alternative Heat Ltd
Official Source
Open Find a Tender

Description

Phase 1 – Pre-Construction Services (RIBA Stage 4) The initial appointment will be for the pre-construction services, which encompass the completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for providing detailed input on the buildability of the design, collaborating with the design team to ensure constructability, and contributing to cost estimation, planning, and risk identification during this phase. Key Responsibilities for RIBA Stage 4: • Provide buildability input to ensure the design can be practically constructed and meets the required performance specifications. • Assist with detailed cost estimation, including providing open book pricing. • Contribute to risk management by identifying potential risks and proposing mitigation strategies. • Review and validate the design to confirm that it aligns with project requirements and is feasible for construction. Page 4 to 10 Phase 2 – Construction Works (RIBA Stage 5 and 6) The ITT also includes the potential for the appointed Contractor to undertake the construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover and Close Out). However, the appointment for these stages is not guaranteed at this point. Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the Contractor’s performance and the project’s requirements. The Council reserves the right to proceed with the contractor for the construction works, subject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall project alignment. A break clause will be in place, allowing the Council to either proceed with the appointed Contractor or re-tender for the construction works. The Council retains Intellectual Property over full design work specific to the sites of this project for use with another contractor if required. Key Points for RIBA Stage 5 and 6: • The ITT outlines the requirements for both pre-construction services and potential construction works, but the contractor is only guaranteed the work for RIBA Stage 4. • Following the completion of RIBA Stage 4, the Council will review whether to appoint the contractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations. The main contract is subject to obtaining all necessary planning consents. The responsibility for securing these consents will primarily rest with the Council. However, the appointed contractor will be expected to provide technical support and relevant information as required during the planning process. The contractor must be aware that no construction works, particularly any equipment ordering or significant on-site activities, can commence until all planning permissions are secured. The timeline for the project may be extended if planning approvals are delayed. Coordination with external parties, may also impact the timing of planning approvals and should be factored into the project delivery plan. The project is partially funded through the Public Sector Decarbonisation Scheme (PSDS), and the key funding condition is that the project must be fully delivered, reach Practical Completion (PC), and be signed off by the end of January 2026. This is the final deadline for the project, and all works must be completed, tested, commissioned, and handed over before this date to ensure compliance with funding requirements. While an initial target of December 2025 has been identified for completion, this is flexible to avoid unnecessary risk. The Council prefers to extend the timeline if required to ensure quality and performance, rather than rush delivery.

Linked Documents

No linked documents found for this notice.

Opportunity Context

Lots

Lot Description: Phase 1 – Pre-Construction Services (RIBA Stage 4) The initial appointment will be for the pre-construction services, which encompass the completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for providing detailed input on the buildability of the design, collaborating with the design team to ensure constructability, and contributing to cost estimation, planning, and risk identification during this phase. Key Responsibilities for RIBA Stage 4: • Provide buildability input to ensure the design can be practically constructed and meets the required performance specifications. • Assist with detailed cost estimation, including providing open book pricing. • Contribute to risk management by identifying potential risks and proposing mitigation strategies. • Review and validate the design to confirm that it aligns with project requirements and is feasible for construction. Page 4 to 10 Phase 2 – Construction Works (RIBA Stage 5 and 6) The ITT also includes the potential for the appointed Contractor to undertake the construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover and Close Out). However, the appointment for these stages is not guaranteed at this point. Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the Contractor’s performance and the project’s requirements. The Council reserves the right to proceed with the contractor for the construction works, subject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall project alignment. A break clause will be in place, allowing the Council to either proceed with the appointed Contractor or re-tender for the construction works. The Council retains Intellectual Property over full design work specific to the sites of this project for use with another contractor if required. Key Points for RIBA Stage 5 and 6: • The ITT outlines the requirements for both pre-construction services and potential construction works, but the contractor is only guaranteed the work for RIBA Stage 4. • Following the completion of RIBA Stage 4, the Council will review whether to appoint the contractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations. The main contract is subject to obtaining all necessary planning consents. The responsibility for securing these consents will primarily rest with the Council. However, the appointed contractor will be expected to provide technical support and relevant information as required during the planning process. The contractor must be aware that no construction works, particularly any equipment ordering or significant on-site activities, can commence until all planning permissions are secured. The timeline for the project may be extended if planning approvals are delayed. Coordination with external parties, may also impact the timing of planning approvals and should be factored into the project delivery plan. The project is partially funded through the Public Sector Decarbonisation Scheme (PSDS), and the key funding condition is that the project must be fully delivered, reach Practical Completion (PC), and be signed off by the end of January 2026. This is the final deadline for the project, and all works must be completed, tested, commissioned, and handed over before this date to ensure compliance with funding requirements. While an initial target of December 2025 has been identified for completion, this is flexible to avoid unnecessary risk. The Council prefers to extend the timeline if required to ensure quality and performance, rather than rush delivery.

Lot 1 Status: cancelled

Lot 1 Has Options: No

Lot 1 Award Criterion (quality): Quality

Lot 1 Award Criterion (quality): Social Value

Raw Notice JSON

Expand raw payload
{
  "awards": [
    {
      "id": "037694-2025-1",
      "relatedLots": [
        "1"
      ],
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-114021",
          "name": "Alternative Heat Ltd"
        }
      ]
    }
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "measure": "bids",
        "relatedLot": "1",
        "value": 10
      }
    ]
  },
  "buyer": {
    "id": "GB-FTS-4273",
    "name": "Lancaster City Council"
  },
  "contracts": [
    {
      "awardID": "037694-2025-1",
      "dateSigned": "2025-07-07T00:00:00+01:00",
      "id": "037694-2025-1",
      "status": "active",
      "value": {
        "amount": 2937317,
        "currency": "GBP"
      }
    }
  ],
  "date": "2025-07-07T11:30:28+01:00",
  "id": "037694-2025",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-h6vhtk-04e7c4",
  "parties": [
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "Lancaster",
        "postalCode": "LA1 1PJ",
        "region": "UK",
        "streetAddress": "Town Hall, Dalton Square"
      },
      "contactPoint": {
        "email": "jshaw@lancaster.gov.uk",
        "name": "Mr Justin Shaw",
        "telephone": "+44 1524582375"
      },
      "details": {
        "buyerProfile": "http://www.lancaster.gov.uk/",
        "classifications": [
          {
            "description": "Regional or local authority",
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE"
          },
          {
            "description": "General public services",
            "id": "01",
            "scheme": "COFOG"
          }
        ],
        "url": "http://www.lancaster.gov.uk/"
      },
      "id": "GB-FTS-4273",
      "identifier": {
        "legalName": "Lancaster City Council"
      },
      "name": "Lancaster City Council",
      "roles": [
        "buyer"
      ]
    },
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "Banbridge",
        "region": "UK"
      },
      "details": {
        "scale": "large"
      },
      "id": "GB-FTS-114021",
      "identifier": {
        "legalName": "Alternative Heat Ltd"
      },
      "name": "Alternative Heat Ltd",
      "roles": [
        "supplier"
      ]
    },
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "Lancaster"
      },
      "id": "GB-FTS-10477",
      "identifier": {
        "legalName": "Lancaster City Council"
      },
      "name": "Lancaster City Council",
      "roles": [
        "reviewBody"
      ]
    }
  ],
  "tag": [
    "award",
    "contract"
  ],
  "tender": {
    "classification": {
      "description": "Construction work",
      "id": "45000000",
      "scheme": "CPV"
    },
    "description": "Phase 1 \u2013 Pre-Construction Services (RIBA Stage 4)\nThe initial appointment will be for the pre-construction services, which encompass the\ncompletion of RIBA Stage 4 (Technical Design). The contractor will be responsible for\nproviding detailed input on the buildability of the design, collaborating with the design team\nto ensure constructability, and contributing to cost estimation, planning, and risk\nidentification during this phase.\nKey Responsibilities for RIBA Stage 4:\n\u2022 Provide buildability input to ensure the design can be practically constructed and meets the\nrequired performance specifications.\n\u2022 Assist with detailed cost estimation, including providing open book pricing.\n\u2022 Contribute to risk management by identifying potential risks and proposing mitigation\nstrategies.\n\u2022 Review and validate the design to confirm that it aligns with project requirements and is\nfeasible for construction.\nPage 4 to 10\nPhase 2 \u2013 Construction Works (RIBA Stage 5 and 6)\nThe ITT also includes the potential for the appointed Contractor to undertake the\nconstruction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover\nand Close Out). However, the appointment for these stages is not guaranteed at this point.\nUpon the completion of RIBA Stage 4, a formal review will be conducted to assess the\nContractor\u2019s performance and the project\u2019s requirements.\nThe Council reserves the right to proceed with the contractor for the construction works,\nsubject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall\nproject alignment. A break clause will be in place, allowing the Council to either proceed with\nthe appointed Contractor or re-tender for the construction works.\nThe Council retains Intellectual Property over full design work specific to the sites of this\nproject for use with another contractor if required.\nKey Points for RIBA Stage 5 and 6:\n\u2022 The ITT outlines the requirements for both pre-construction services and potential\nconstruction works, but the contractor is only guaranteed the work for RIBA Stage 4.\n\u2022 Following the completion of RIBA Stage 4, the Council will review whether to appoint the\ncontractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations.\nThe main contract is subject to obtaining all necessary planning consents. The responsibility\nfor securing these consents will primarily rest with the Council. However, the appointed\ncontractor will be expected to provide technical support and relevant information as\nrequired during the planning process.\nThe contractor must be aware that no construction works, particularly any equipment\nordering or significant on-site activities, can commence until all planning permissions are\nsecured. The timeline for the project may be extended if planning approvals are delayed.\nCoordination with external parties, may also impact the timing of planning approvals and\nshould be factored into the project delivery plan.\nThe project is partially funded through the Public Sector Decarbonisation Scheme (PSDS),\nand the key funding condition is that the project must be fully delivered, reach Practical\nCompletion (PC), and be signed off by the end of January 2026. This is the final deadline for\nthe project, and all works must be completed, tested, commissioned, and handed over\nbefore this date to ensure compliance with funding requirements.\nWhile an initial target of December 2025 has been identified for completion, this is flexible to\navoid unnecessary risk. The Council prefers to extend the timeline if required to ensure\nquality and performance, rather than rush delivery.",
    "id": "DN752184",
    "items": [
      {
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "id": "1",
        "relatedLot": "1"
      }
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "lots": [
      {
        "awardCriteria": {
          "criteria": [
            {
              "description": "60",
              "name": "Quality",
              "type": "quality"
            },
            {
              "description": "10",
              "name": "Social Value",
              "type": "quality"
            },
            {
              "description": "30",
              "type": "price"
            }
          ]
        },
        "description": "Phase 1 \u2013 Pre-Construction Services (RIBA Stage 4)\nThe initial appointment will be for the pre-construction services, which encompass the\ncompletion of RIBA Stage 4 (Technical Design). The contractor will be responsible for\nproviding detailed input on the buildability of the design, collaborating with the design team\nto ensure constructability, and contributing to cost estimation, planning, and risk\nidentification during this phase.\nKey Responsibilities for RIBA Stage 4:\n\u2022 Provide buildability input to ensure the design can be practically constructed and meets the\nrequired performance specifications.\n\u2022 Assist with detailed cost estimation, including providing open book pricing.\n\u2022 Contribute to risk management by identifying potential risks and proposing mitigation\nstrategies.\n\u2022 Review and validate the design to confirm that it aligns with project requirements and is\nfeasible for construction.\nPage 4 to 10\nPhase 2 \u2013 Construction Works (RIBA Stage 5 and 6)\nThe ITT also includes the potential for the appointed Contractor to undertake the\nconstruction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover\nand Close Out). However, the appointment for these stages is not guaranteed at this point.\nUpon the completion of RIBA Stage 4, a formal review will be conducted to assess the\nContractor\u2019s performance and the project\u2019s requirements.\nThe Council reserves the right to proceed with the contractor for the construction works,\nsubject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall\nproject alignment. A break clause will be in place, allowing the Council to either proceed with\nthe appointed Contractor or re-tender for the construction works.\nThe Council retains Intellectual Property over full design work specific to the sites of this\nproject for use with another contractor if required.\nKey Points for RIBA Stage 5 and 6:\n\u2022 The ITT outlines the requirements for both pre-construction services and potential\nconstruction works, but the contractor is only guaranteed the work for RIBA Stage 4.\n\u2022 Following the completion of RIBA Stage 4, the Council will review whether to appoint the\ncontractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations.\nThe main contract is subject to obtaining all necessary planning consents. The responsibility\nfor securing these consents will primarily rest with the Council. However, the appointed\ncontractor will be expected to provide technical support and relevant information as\nrequired during the planning process.\nThe contractor must be aware that no construction works, particularly any equipment\nordering or significant on-site activities, can commence until all planning permissions are\nsecured. The timeline for the project may be extended if planning approvals are delayed.\nCoordination with external parties, may also impact the timing of planning approvals and\nshould be factored into the project delivery plan.\nThe project is partially funded through the Public Sector Decarbonisation Scheme (PSDS),\nand the key funding condition is that the project must be fully delivered, reach Practical\nCompletion (PC), and be signed off by the end of January 2026. This is the final deadline for\nthe project, and all works must be completed, tested, commissioned, and handed over\nbefore this date to ensure compliance with funding requirements.\nWhile an initial target of December 2025 has been identified for completion, this is flexible to\navoid unnecessary risk. The Council prefers to extend the timeline if required to ensure\nquality and performance, rather than rush delivery.",
        "hasOptions": false,
        "id": "1",
        "status": "cancelled"
      }
    ],
    "mainProcurementCategory": "works",
    "procurementMethod": "open",
    "procurementMethodDetails": "Open procedure",
    "status": "complete",
    "title": "Building Decarbonisation Projects at Williamson Park, The Storey and City Lab"
  }
}