Buyer Name: Northern Ireland Electricity Networks
Buyer Address: 120 Malone Road,, Belfast,, UKN, BT9 5HT, United Kingdom
Contact Email: Anna.McWhirter@nienetworks.co.uk
Buyer Name: Northern Ireland Electricity Networks
Buyer Address: 120 Malone Road,, Belfast,, UKN, BT9 5HT, United Kingdom
Contact Email: Anna.McWhirter@nienetworks.co.uk
• The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works • The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated – NIE Networks will seek alternative car parking arrangements for some of its staff cars
No linked documents found for this notice.
Lot Description: NIE Networks is currently undertaking a programme of refurbishment/upgrades on a number of its key office bases, with the most significant being the replacement of the current office at Craigavon with a new build circa 38,000 square foot office (over 2 floors), which is to be located on the existing site. The primary works for this project will include the following: • The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works • The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated – NIE Networks will seek alternative car parking arrangements for some of its staff cars • The existing mast and associated communications cabling are also to remain in place and operational throughout the duration of the works as this forms a critical part of NIE Networks distribution network • Upon completion and occupation of the new building, the existing building is to be demolished, and the new car parking layout and associated landscaping completed. The secondary works will include the following: • Main contractor to fulfil the role of Principal Contractor under the CDM Regulations for the duration of the work. • Any damage to hard standing areas required for equipment or materials storage or delivery, site cabins, offices etc as required by the main contractor within the site boundary, will be made good at the completion of the project. • Any surface water removal during the construction stage will be the responsibility of the main contractor and should be factored into the costs. • The design of any temporary works will be the main contractor’s responsibility. • The main contractor will assume full responsibility for: - Materials and equipment once they have been delivered to site. Any damage or theft will be the contractor’s sole responsibility. - Co-ordination of all deliveries associated with the works including traffic management, flag men etc. - The provision, maintenance and repair of all necessary tools, plant, equipment and skips necessary to carry out the required works. - The provision, maintenance, repair and removal on completion of all necessary temporary electrics, potable water supply, lighting, edge protection or other temporary works as necessary to carry out the required works. • The main contractor must ensure that all completed works are properly protected until handover of the site. • Before the commencement of the works the main contractor shall inspect the conditions on site and notify the NIE Networks Client representative/Principal Designer of any conditions which may adversely or otherwise affect the scope of works. • It is the responsibility of the main contractor to ensure that all plant, tools and equipment are used safely and that workers, other contractors, visitors to site and the general public are properly protected.
Lot 1 Status: cancelled
Lot 1 Has Options: Yes
Lot 1 Options: Contract Duration is from April 2025 to October 2026
Lot 1 Award Criterion (quality): Quality
Lot 1 Award Criterion (cost): Commercial
{
"awards": [
{
"id": "030274-2025-B978 (2022)-1",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-FTS-150358",
"name": "MSM Contracts Limited"
}
]
}
],
"bids": {
"statistics": [
{
"id": "1",
"measure": "bids",
"relatedLot": "1",
"value": 5
},
{
"id": "2",
"measure": "smeBids",
"relatedLot": "1",
"value": 5
},
{
"id": "3",
"measure": "foreignBidsFromNonEU",
"relatedLot": "1",
"value": 5
},
{
"id": "4",
"measure": "electronicBids",
"relatedLot": "1",
"value": 5
}
]
},
"buyer": {
"id": "GB-FTS-14678",
"name": "Northern Ireland Electricity Networks"
},
"contracts": [
{
"awardID": "030274-2025-B978 (2022)-1",
"dateSigned": "2025-04-14T00:00:00+01:00",
"id": "030274-2025-B978 (2022)-1",
"status": "active",
"value": {
"amount": 11000000.0,
"currency": "GBP"
}
}
],
"date": "2025-06-05T14:15:26+01:00",
"id": "030274-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-02edc7",
"parties": [
{
"address": {
"countryName": "United Kingdom",
"locality": "Belfast,",
"postalCode": "BT9 5HT",
"region": "UKN",
"streetAddress": "120 Malone Road,"
},
"contactPoint": {
"email": "Anna.McWhirter@nienetworks.co.uk"
},
"details": {
"classifications": [
{
"description": "Electricity",
"id": "ELECTRICITY",
"scheme": "TED_CE_ACTIVITY"
}
],
"url": "http://www.nienetworks.co.uk"
},
"id": "GB-FTS-14678",
"identifier": {
"legalName": "Northern Ireland Electricity Networks"
},
"name": "Northern Ireland Electricity Networks",
"roles": [
"buyer"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Portadown",
"postalCode": "BT63 5QE",
"region": "UKN",
"streetAddress": "Unit 45a Seagoe Industrial Estate"
},
"details": {
"scale": "sme"
},
"id": "GB-FTS-150358",
"identifier": {
"legalName": "MSM Contracts Limited"
},
"name": "MSM Contracts Limited",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Belfast",
"streetAddress": "120 Malone Road"
},
"details": {
"url": "http://www.nienetworks.co.uk"
},
"id": "GB-FTS-32031",
"identifier": {
"legalName": "Northern Ireland Electricity Networks Limited"
},
"name": "Northern Ireland Electricity Networks Limited",
"roles": [
"reviewBody"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Belfast",
"streetAddress": "Royal Courts of Justice, Chichester Street"
},
"id": "GB-FTS-150359",
"identifier": {
"legalName": "High Court of Justice In Northern Ireland"
},
"name": "High Court of Justice In Northern Ireland",
"roles": [
"mediationBody"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Belfast",
"streetAddress": "Royal Courts of Justice, Chichester Street"
},
"id": "GB-FTS-14680",
"identifier": {
"legalName": "High Court of Justice in Northern Ireland"
},
"name": "High Court of Justice in Northern Ireland",
"roles": [
"reviewContactPoint"
]
}
],
"tag": [
"award",
"contract"
],
"tender": {
"classification": {
"description": "Building construction work",
"id": "45210000",
"scheme": "CPV"
},
"coveredBy": [
"GPA"
],
"description": "\u2022 The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works\n\u2022 The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated \u2013 NIE Networks will seek alternative car parking arrangements for some of its staff cars",
"id": "B978 (2022)",
"items": [
{
"additionalClassifications": [
{
"description": "Works for complete or part construction and civil engineering work",
"id": "45200000",
"scheme": "CPV"
},
{
"description": "Building construction work",
"id": "45210000",
"scheme": "CPV"
},
{
"description": "Office block construction work",
"id": "45213150",
"scheme": "CPV"
},
{
"description": "Construction work for warehouses",
"id": "45213220",
"scheme": "CPV"
},
{
"description": "Warehouse stores construction work",
"id": "45213221",
"scheme": "CPV"
},
{
"description": "Construction work for industrial buildings",
"id": "45213250",
"scheme": "CPV"
},
{
"description": "Stores depot construction work",
"id": "45213260",
"scheme": "CPV"
},
{
"description": "Engineering works and construction works",
"id": "45220000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKN"
}
],
"deliveryLocation": {
"description": "Craigavon, Northern Ireland"
},
"id": "1",
"relatedLot": "1"
}
],
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"lots": [
{
"awardCriteria": {
"criteria": [
{
"description": "30",
"name": "Quality",
"type": "quality"
},
{
"description": "70",
"name": "Commercial",
"type": "cost"
}
]
},
"description": "NIE Networks is currently undertaking a programme of refurbishment/upgrades on a number of its key office bases, with the most significant being the replacement of the current office at Craigavon with a new build circa 38,000 square foot office (over 2 floors), which is to be located on the existing site.\nThe primary works for this project will include the following:\n\u2022 The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works\n\u2022 The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated \u2013 NIE Networks will seek alternative car parking arrangements for some of its staff cars\n\u2022 The existing mast and associated communications cabling are also to remain in place and operational throughout the duration of the works as this forms a critical part of NIE Networks distribution network\n\u2022 Upon completion and occupation of the new building, the existing building is to be\ndemolished, and the new car parking layout and associated landscaping completed.\nThe secondary works will include the following:\n\u2022 Main contractor to fulfil the role of Principal Contractor under the CDM Regulations for the duration of the work. \n\u2022 Any damage to hard standing areas required for equipment or materials storage or delivery, site cabins, offices etc as required by the main contractor within the site boundary, will be made good at the completion of the project.\n\u2022 Any surface water removal during the construction stage will be the responsibility of the main contractor and should be factored into the costs.\n\u2022 The design of any temporary works will be the main contractor\u2019s responsibility.\n\u2022 The main contractor will assume full responsibility for:\n- Materials and equipment once they have been delivered to site. Any damage or theft will be the contractor\u2019s sole responsibility.\n- Co-ordination of all deliveries associated with the works including traffic management, flag men etc.\n- The provision, maintenance and repair of all necessary tools, plant, equipment and skips necessary to carry out the required works. \n- The provision, maintenance, repair and removal on completion of all necessary temporary electrics, potable water supply, lighting, edge protection or other temporary works as necessary to carry out the required works.\n\u2022 The main contractor must ensure that all completed works are properly protected until handover of the site.\n\u2022 Before the commencement of the works the main contractor shall inspect the conditions on site and notify the NIE Networks Client representative/Principal Designer of any conditions which may adversely or otherwise affect the scope of works.\n\u2022 It is the responsibility of the main contractor to ensure that all plant, tools and equipment are used safely and that workers, other contractors, visitors to site and the general public are properly protected.",
"hasOptions": true,
"id": "1",
"options": {
"description": "Contract Duration is from April 2025 to October 2026"
},
"status": "cancelled"
}
],
"mainProcurementCategory": "works",
"procurementMethod": "selective",
"procurementMethodDetails": "Negotiated procedure with prior call for competition",
"status": "complete",
"title": "B978 (2022) Building Contractor Craigavon Office"
}
}