← Back to opportunities

Local Electric Vehicle Infrastructure (LEVI)

Kent County Council

Buyer Contact Info

Buyer Name: Kent County Council

Buyer Address: County Hall, Maidstone, UKJ4, ME141XQ, United Kingdom

Contact Email: molly.roast@kent.gov.uk

Status
complete
Procedure
selective
Value
n/a
Published
13 Mar 2026, 12:17
Deadline
n/a
Contract Start
n/a
Contract End
n/a
Category
services
CPV
31158000 - Chargers
Region
n/a
Awarded To
Urban Fox Networks (Kent) Limited
Official Source
Open Find a Tender

Description

The Kent County Council (KCC) has awarded a contract for Local Electric Vehicle Infrastructure (LEVI). In line with Government plans to decarbonise transport and end the sale of petrol and diesel cars, Kent County Council is preparing the network for zero emission vehicles and in doing so supporting the ambition to reach net zero by 2050.

Linked Documents

No linked documents found for this notice.

Opportunity Context

Lots

Lot Description: The Kent County Council (KCC) has awarded a contract for Local Electric Vehicle Infrastructure (LEVI). In line with Government plans to decarbonise transport and end the sale of petrol and diesel cars, Kent County Council is preparing the network for zero emission vehicles and in doing so supporting the ambition to reach net zero by 2050. In March 2022 the Government published Taking charge: the electric vehicle infrastructure strategy which outlined their intention that Local Authorities should play a leading role in ensuring equitable access to Electric Vehicle Charge Points (EVCP) in their localities. This was followed up in 2023 when the Government launched the Local Electric Vehicle Infrastructure (LEVI) fund, which was designed to help deliver a step change in the deployment of local, primarily low power, on-street charging infrastructure to accelerate the commercialisation of, and investment in, the local charging infrastructure sector. The LEVI fund is administered by the Office of Zero Emissions Vehicles (OZEV), who want to see Tier 1 Authorities enabling charging for those in most need. In the current landscape of electric vehicle (EV) charging, OZEV have made it clear that the primary focus should be on existing residential properties without the ability to charge their vehicles at home. The Council will work with the supplier to develop a reliable and high-quality public on-street charge point network. This will enable equal levelling up across the county by providing the infrastructure needed for the residents of Kent to make the switch to EVs, particularly for those without the ability to charge at home. The Individual Contract is a Concession Contract with a contractual term of 20 years. The Supplier will work with the Customer to plan and deliver a network of primarily 7 kWh < 22 kWh charge points. However, other charge point types and speeds may be considered if needed and subject to agreement by The Customer. The installation period of the charge points will take place during the first 10 years of the contract term. Based on the data provided by CENEX and the project dependencies, assumptions, constraints and risks, KCC have set the below indicative targets for installations: • Infrastructure for 4,000 Sockets by 2030 • Infrastructure for 10,000 Sockets by 2035 The Council has successfully secured LEVI capital funding.

Lot 1 Status: cancelled

Lot 1 Has Options: No

Lot 1 Award Criterion (quality): Quality

Lot 1 Award Criterion (cost): Cost

Raw Notice JSON

Expand raw payload
{
  "awards": [
    {
      "id": "022937-2026-SC250082-1",
      "relatedLots": [
        "1"
      ],
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-16991096",
          "name": "Urban Fox Networks (Kent) Limited"
        }
      ]
    }
  ],
  "bids": {
    "statistics": [
      {
        "id": "5",
        "measure": "bids",
        "relatedLot": "1",
        "value": 3
      },
      {
        "currency": "GBP",
        "id": "3",
        "measure": "lowestValidBidValue",
        "relatedLot": "1",
        "value": 215000000
      },
      {
        "currency": "GBP",
        "id": "4",
        "measure": "highestValidBidValue",
        "relatedLot": "1",
        "value": 290000000
      },
      {
        "currency": "GBP",
        "id": "1",
        "measure": "lowestValidBidValue",
        "value": 215000000
      },
      {
        "currency": "GBP",
        "id": "2",
        "measure": "highestValidBidValue",
        "value": 290000000
      }
    ]
  },
  "buyer": {
    "id": "GB-FTS-30181",
    "name": "Kent County Council"
  },
  "contracts": [
    {
      "awardID": "022937-2026-SC250082-1",
      "dateSigned": "2026-02-11T00:00:00Z",
      "id": "022937-2026-SC250082-1",
      "status": "active"
    }
  ],
  "date": "2026-03-13T12:17:39Z",
  "description": "The total value of this concession contract is an estimate based on a range of forecasted variables associated with the delivery and operation of electric vehicle charging infrastructure. These variables include the anticipated number of charging sockets to be installed over the contract term, projected utilisation levels of the charging assets, and expected revenue streams accruing both to the Provider and the Authority. The estimate also incorporates expected electricity consumption and associated costs required to operate the charging network. As these factors are subject to change over time in line with demand and energy market conditions, the stated contract value represents a forecast rather than a fixed commitment.",
  "id": "022937-2026",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-h6vhtk-04be5c",
  "parties": [
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "Maidstone",
        "postalCode": "ME141XQ",
        "region": "UKJ4",
        "streetAddress": "County Hall"
      },
      "contactPoint": {
        "email": "molly.roast@kent.gov.uk"
      },
      "details": {
        "classifications": [
          {
            "description": "Regional or local authority",
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE"
          },
          {
            "description": "General public services",
            "id": "01",
            "scheme": "COFOG"
          }
        ],
        "url": "http://www.kent.gov.uk"
      },
      "id": "GB-FTS-30181",
      "identifier": {
        "legalName": "Kent County Council",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "name": "Kent County Council",
      "roles": [
        "buyer"
      ]
    },
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "Newcastle Upon Tyne",
        "postalCode": "NE12 8BU",
        "region": "UK",
        "streetAddress": "Q14 Quorum Business Park, Benton Lane"
      },
      "details": {
        "scale": "sme"
      },
      "id": "GB-COH-16991096",
      "identifier": {
        "id": "16991096",
        "legalName": "Urban Fox Networks (Kent) Limited",
        "scheme": "GB-COH"
      },
      "name": "Urban Fox Networks (Kent) Limited",
      "roles": [
        "supplier"
      ]
    },
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "London",
        "postalCode": "WC2A 2LL",
        "streetAddress": "Strand"
      },
      "id": "GB-FTS-1819",
      "identifier": {
        "legalName": "Royal Court of Justice"
      },
      "name": "Royal Court of Justice",
      "roles": [
        "reviewBody"
      ]
    }
  ],
  "tag": [
    "award",
    "contract"
  ],
  "tender": {
    "classification": {
      "description": "Installation services of electrical and mechanical equipment",
      "id": "51100000",
      "scheme": "CPV"
    },
    "coveredBy": [
      "GPA"
    ],
    "description": "The Kent County Council (KCC) has awarded a contract for Local Electric Vehicle Infrastructure (LEVI). In line with Government plans to decarbonise transport and end the sale of petrol and diesel cars, Kent County Council is preparing the network for zero emission vehicles and in doing so supporting the ambition to reach net zero by 2050.",
    "id": "SC250082",
    "items": [
      {
        "additionalClassifications": [
          {
            "description": "Chargers",
            "id": "31158000",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "region": "UKJ4"
          }
        ],
        "id": "1",
        "relatedLot": "1"
      }
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "lots": [
      {
        "awardCriteria": {
          "criteria": [
            {
              "description": "75",
              "name": "Quality",
              "type": "quality"
            },
            {
              "description": "25",
              "name": "Cost",
              "type": "cost"
            }
          ]
        },
        "description": "The Kent County Council (KCC) has awarded a contract for Local Electric Vehicle Infrastructure (LEVI). In line with Government plans to decarbonise transport and end the sale of petrol and diesel cars, Kent County Council is preparing the network for zero emission vehicles and in doing so supporting the ambition to reach net zero by 2050.\nIn March 2022 the Government published Taking charge: the electric vehicle infrastructure strategy which outlined their intention that Local Authorities should play a leading role in ensuring equitable access to Electric Vehicle Charge Points (EVCP) in their localities.\nThis was followed up in 2023 when the Government launched the Local Electric Vehicle Infrastructure (LEVI) fund, which was designed to help deliver a step change in the deployment of local, primarily low power, on-street charging infrastructure to accelerate the commercialisation of, and investment in, the local charging infrastructure sector.\nThe LEVI fund is administered by the Office of Zero Emissions Vehicles (OZEV), who want to see Tier 1 Authorities enabling charging for those in most need. In the current landscape of electric vehicle (EV) charging, OZEV have made it clear that the primary focus should be on existing residential properties without the ability to charge their vehicles at home.\nThe Council will work with the supplier to develop a reliable and high-quality public on-street charge point network. This will enable equal levelling up across the county by providing the infrastructure needed for the residents of Kent to make the switch to EVs, particularly for those without the ability to charge at home.\nThe Individual Contract is a Concession Contract with a contractual term of 20 years. The Supplier will work with the Customer to plan and deliver a network of primarily 7 kWh \u003c 22 kWh charge points. However, other charge point types and speeds may be considered if needed and subject to agreement by The Customer. The installation period of the charge points will take place during the first 10 years of the contract term. Based on the data provided by CENEX and the project dependencies, assumptions, constraints and risks, KCC have set the below indicative targets for installations:\n\u2022 Infrastructure for 4,000 Sockets by 2030\n\u2022 Infrastructure for 10,000 Sockets by 2035\nThe Council has successfully secured LEVI capital funding.",
        "hasOptions": false,
        "id": "1",
        "status": "cancelled"
      }
    ],
    "mainProcurementCategory": "services",
    "procurementMethod": "selective",
    "procurementMethodDetails": "Competitive procedure with negotiation",
    "status": "complete",
    "title": "Local Electric Vehicle Infrastructure (LEVI)"
  }
}