Forest Road, Lydney Geotechnical Stabilisation

Gloucestershire County Council

Buyer Contact Info

Buyer Name: Gloucestershire County Council

Buyer Address: Shire Hall, Westgate Street, Gloucester, UKK13, GL1 2TG, United Kingdom

Contact Email: cdpactivitylog@gloucestershire.gov.uk

Status
complete
Procedure
open
Value
929703.77 GBP
Published
04 Mar 2026, 14:57
Deadline
n/a
Contract Start
09 Feb 2026, 00:00
Contract End
07 Aug 2026, 22:59
Category
n/a
CPV
45000000 - Construction work
Region
n/a
Awarded To
MONTEL CIVIL ENGINEERING LIMITED
Official Source
Open Find a Tender

Description

The site is located on the B4234 approximately 1.8km Northwest of the town of Lydney, Gloucestershire. The B4234 carriageway is constructed on sidelong ground and runs parallel to the River Lyd. The River Lyd runs approximately 8m below the road level. The site was identified to have defects in 2023 and has been subject to regular monitoring. The defects noted consisted of carriageway cracking, subsidence, leaning trees associated with lower slope instability and blocked gullies. A landslip occurred over a 20m length of earthwork adjacent to New Road in late 2023. The carriageway is showing signs of instability with cracking evident, and a steep face is now present at the edge of the westbound running lane. The client is looking for a Principal Contractor to deliver the construction phase of this scheme. Summary of Construction Phase key deliverables are as follows: - Provision of suitable traffic management during construction works, including full road closure and signposted diversions. - Installation of sheet piled retaining wall along an extent of 43 m - 1.6 m from carriageway edge. - Pile lengths will vary with rockhead depth, typically reaching 8.0 m. Piles will be driven to the designed toe level and cut flush with adjacent ground. - Construction of new drainage system including installation of a concrete bag headwall outfall within the embankment. - Highways reconstruction including plaining and overlay. - Installation of a VRS barrier system and wooden fencing over an extent of 131 m. - Traffic signs, kerbing, and road markings. - Coordination with BT utility diversions and protection works. A summary of the outline programme is shown below: Anticipated Works Start Date: Monday 9th February 2026 Completion: Friday 7th August 2026 Overall Duration: 26 Weeks The proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.

Linked Documents

No linked documents found for this notice.

Opportunity Context

Lots

Lot 1 Status: complete

Contracts

Contract Title: Forest Road, Lydney Geotechnical Stabilisation

Raw Notice JSON

Expand raw payload
{
  "awards": [
    {
      "id": "1",
      "items": [
        {
          "additionalClassifications": [
            {
              "description": "Construction work",
              "id": "45000000",
              "scheme": "CPV"
            }
          ],
          "deliveryAddresses": [
            {
              "country": "GB",
              "countryName": "United Kingdom",
              "region": "UKK13"
            }
          ],
          "id": "1",
          "relatedLot": "1"
        }
      ],
      "mainProcurementCategory": "works",
      "relatedLots": [
        "1"
      ],
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-08949189",
          "name": "MONTEL CIVIL ENGINEERING LIMITED"
        }
      ]
    }
  ],
  "buyer": {
    "id": "GB-PPON-PZHT-7473-ZVPN",
    "name": "Gloucestershire County Council"
  },
  "contracts": [
    {
      "aboveThreshold": false,
      "awardID": "1",
      "dateSigned": "2026-01-15T00:00:00Z",
      "documents": [
        {
          "datePublished": "2026-03-04T14:57:56Z",
          "description": "Contract details notice on Find a Tender",
          "documentType": "contractNotice",
          "format": "text/html",
          "id": "019562-2026",
          "noticeType": "UK7",
          "url": "https://www.find-tender.service.gov.uk/Notice/019562-2026"
        }
      ],
      "id": "1",
      "period": {
        "endDate": "2026-08-07T23:59:59+01:00",
        "startDate": "2026-02-09T00:00:00Z"
      },
      "status": "active",
      "title": "Forest Road, Lydney Geotechnical Stabilisation",
      "value": {
        "amount": 929703.77,
        "amountGross": 1115644.52,
        "currency": "GBP"
      }
    }
  ],
  "date": "2026-03-04T14:57:56Z",
  "id": "019562-2026",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-h6vhtk-05ac25",
  "parties": [
    {
      "address": {
        "country": "GB",
        "countryName": "United Kingdom",
        "locality": "Gloucester",
        "postalCode": "GL1 2TG",
        "region": "UKK13",
        "streetAddress": "Shire Hall, Westgate Street"
      },
      "contactPoint": {
        "email": "cdpactivitylog@gloucestershire.gov.uk"
      },
      "details": {
        "classifications": [
          {
            "description": "Public authority - sub-central government",
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE"
          }
        ]
      },
      "id": "GB-PPON-PZHT-7473-ZVPN",
      "identifier": {
        "id": "PZHT-7473-ZVPN",
        "scheme": "GB-PPON"
      },
      "name": "Gloucestershire County Council",
      "roles": [
        "buyer"
      ]
    },
    {
      "additionalIdentifiers": [
        {
          "id": "PTLV-6345-TDRT",
          "scheme": "GB-PPON"
        }
      ],
      "address": {
        "country": "GB",
        "countryName": "United Kingdom",
        "locality": "Worcester",
        "postalCode": "WR4 9FA",
        "region": "UKG12",
        "streetAddress": "Suite A \u0026 B, Unit 1 Wainwright Road"
      },
      "contactPoint": {
        "email": "contact@montel-group.com"
      },
      "details": {
        "scale": "sme",
        "url": "https://montelcivilengineering.co.uk",
        "vcse": false
      },
      "id": "GB-COH-08949189",
      "identifier": {
        "id": "08949189",
        "scheme": "GB-COH"
      },
      "name": "MONTEL CIVIL ENGINEERING LIMITED",
      "roles": [
        "supplier"
      ]
    }
  ],
  "tag": [
    "award",
    "contract"
  ],
  "tender": {
    "description": "The site is located on the B4234 approximately 1.8km Northwest of the town of Lydney, Gloucestershire. The B4234 carriageway is constructed on sidelong ground and runs parallel to the River Lyd. The River Lyd runs approximately 8m below the road level. The site was identified to have defects in 2023 and has been subject to regular monitoring.\nThe defects noted consisted of carriageway cracking, subsidence, leaning trees associated with lower slope instability and blocked gullies. A landslip occurred over a 20m length of earthwork adjacent to New Road in late 2023. The carriageway is showing signs of instability with cracking evident, and a steep face is now present at the edge of the westbound running lane.\nThe client is looking for a Principal Contractor to deliver the construction phase of this scheme.\nSummary of Construction Phase key deliverables are as follows:\n- Provision of suitable traffic management during construction works, including full road closure and signposted diversions.\n- Installation of sheet piled retaining wall along an extent of 43 m - 1.6 m from carriageway edge.\n- Pile lengths will vary with rockhead depth, typically reaching 8.0 m. Piles will be driven to the designed toe level and cut flush with adjacent ground.\n- Construction of new drainage system including installation of a concrete bag headwall outfall within the embankment.\n- Highways reconstruction including plaining and overlay.\n- Installation of a VRS barrier system and wooden fencing over an extent of 131 m.\n- Traffic signs, kerbing, and road markings.\n- Coordination with BT utility diversions and protection works.\nA summary of the outline programme is shown below:\nAnticipated Works Start Date: Monday 9th February 2026\nCompletion: Friday 7th August 2026\nOverall Duration: 26 Weeks\nThe proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.",
    "id": "DN790546",
    "legalBasis": {
      "id": "2023/54",
      "scheme": "UKPGA",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
    },
    "lots": [
      {
        "id": "1",
        "status": "complete"
      }
    ],
    "procurementMethod": "open",
    "procurementMethodDetails": "Below threshold - open competition",
    "status": "complete",
    "title": "Forest Road, Lydney Geotechnical Stabilisation"
  }
}