Buyer Name: Mining Remediation Authority
Buyer Address: 200 Lichfield Lane, Nottinghamshire, UKF15, NG184RG, United Kingdom
Contact Name: Peter Kobryn
Contact Email: peter.kobryn@miningremediation.gov.uk
Buyer Name: Mining Remediation Authority
Buyer Address: 200 Lichfield Lane, Nottinghamshire, UKF15, NG184RG, United Kingdom
Contact Name: Peter Kobryn
Contact Email: peter.kobryn@miningremediation.gov.uk
Extension and upgrade the current electrical network from Egglestone Middle end along the B6278 highway boundary, to the boundary of the Egglestone Estate access track, where it is proposed to terminate in readiness for the second phase of the power connection works.
No linked documents found for this notice.
Lot Description: Extension and upgrade the current electrical network from Egglestone Middle end along the B6278 highway boundary, to the boundary of the Egglestone Estate access track, where it is proposed to terminate in readiness for the second phase of the power connection works.
Lot 1 Has Options: No
Contract Title: Sharnberry MWTS - Power Connection Upgrade
Award Title: Sharnberry MWTS - Power Connection Upgrade
{
"awards": [
{
"id": "012049-2025-CA18/05668-1",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-02906593",
"name": "Northern Powergrid"
}
],
"title": "Sharnberry MWTS - Power Connection Upgrade"
}
],
"buyer": {
"id": "GB-FTS-141424",
"name": "Mining Remediation Authority"
},
"contracts": [
{
"awardID": "012049-2025-CA18/05668-1",
"dateSigned": "2025-03-24T00:00:00Z",
"id": "012049-2025-CA18/05668-1",
"status": "active",
"title": "Sharnberry MWTS - Power Connection Upgrade",
"value": {
"amount": 579239.63,
"currency": "GBP"
}
}
],
"date": "2025-03-31T15:20:26+01:00",
"id": "012049-2025",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-04fac2",
"parties": [
{
"address": {
"countryName": "United Kingdom",
"locality": "Nottinghamshire",
"postalCode": "NG184RG",
"region": "UKF15",
"streetAddress": "200 Lichfield Lane"
},
"contactPoint": {
"email": "peter.kobryn@miningremediation.gov.uk",
"name": "Peter Kobryn"
},
"details": {
"classifications": [
{
"description": "Body governed by public law",
"id": "BODY_PUBLIC",
"scheme": "TED_CA_TYPE"
},
{
"description": "Environmental protection",
"id": "05",
"scheme": "COFOG"
}
],
"url": "https://www.gov.uk/government/organisations/mining-remediation-authority"
},
"id": "GB-FTS-141424",
"identifier": {
"legalName": "Mining Remediation Authority",
"noIdentifierRationale": "notOnAnyRegister"
},
"name": "Mining Remediation Authority",
"roles": [
"buyer"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Newcastle Upon Tyne,",
"postalCode": "NE1 6AF",
"region": "UKC",
"streetAddress": "Lloyds Court, 78 Grey Street,"
},
"details": {
"scale": "large"
},
"id": "GB-COH-02906593",
"identifier": {
"id": "02906593",
"legalName": "Northern Powergrid",
"scheme": "GB-COH"
},
"name": "Northern Powergrid",
"roles": [
"supplier"
]
},
{
"address": {
"countryName": "United Kingdom",
"locality": "Mansfield"
},
"id": "GB-FTS-141425",
"identifier": {
"legalName": "Mining Remediation Authority"
},
"name": "Mining Remediation Authority",
"roles": [
"reviewBody"
]
}
],
"tag": [
"award",
"contract"
],
"tender": {
"classification": {
"description": "Other electrical installation work",
"id": "45317000",
"scheme": "CPV"
},
"description": "Extension and upgrade the current electrical network from Egglestone Middle end along the B6278 highway boundary, to the boundary of the Egglestone Estate access track, where it is proposed to terminate in readiness for the second phase of the power connection works.",
"id": "CA18/2/1/118",
"items": [
{
"deliveryAddresses": [
{
"region": "UKC"
}
],
"id": "1",
"relatedLot": "1"
}
],
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"lots": [
{
"awardCriteria": {
"criteria": [
{
"type": "price"
}
]
},
"description": "Extension and upgrade the current electrical network from Egglestone Middle end along the B6278 highway boundary, to the boundary of the Egglestone Estate access track, where it is proposed to terminate in readiness for the second phase of the power connection works.",
"hasOptions": false,
"id": "1"
}
],
"mainProcurementCategory": "works",
"procurementMethod": "limited",
"procurementMethodDetails": "Award procedure without prior publication of a call for competition",
"procurementMethodRationale": "This requirement includes a mixture of works some of which cannot be procured from sources other than Northern Powergrid owing to the nature and structure of the power market in the UK and others which may be available on the open market albeit with additional costs of supervision and governance .\nTo separate the two requirements would make it highly likely that significant delay to the programme for this project would be experienced as well as additional whole life costs related to the supervision and assurance of compliance for this work and additional requirements for managing the safety and standards of the work.",
"procurementMethodRationaleClassifications": [
{
"description": "The procurement falls outside the scope of application of the directive",
"id": "D_OUTSIDE_SCOPE",
"scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL"
}
],
"status": "complete",
"title": "Sharnberry Mine Water Treatment Scheme - Power Connection Upgrade"
}
}