Rail Package 2 Camp Hill Line New Stations

West Midlands Combined Authority

Buyer Contact Info

Buyer Name: West Midlands Combined Authority

Buyer Address: 16 Summer Lane, Birmingham, UKG, B19 3SD, United Kingdom

Contact Email: procurement.team@wmca.org.uk

Contact Telephone: +44 3453036760

Status
complete
Procedure
limited
Value
27000000.0 GBP
Published
25 Mar 2025, 10:22
Deadline
n/a
Contract Start
n/a
Contract End
n/a
Category
works
CPV
45213321 - Railway station construction work
Region
n/a
Awarded To
Volkerfitzpatrick Ltd
Official Source
Open Find a Tender

Description

The Project will consist of the design and construction of (3) three new stations at Moseley, Kings Heath and Hazelwell and supporting rail infrastructure works, on the Camp Hill Line between Birmingham New Street and Kings Norton to support access for new train services that increase connectivity in the Greater Birmingham area." * The above is a description of the original procurement *

Linked Documents

No linked documents found for this notice.

Opportunity Context

Lots

Lot Description: Project Overview: We are seeking to appoint a Principal Contractor on a design and build basis under a NEC 4 ECC Target Cost Contract to construct 3 new stations at Moseley, Kings Heath and Hazelwell including supporting rail infrastructure works. The timeline for completion is 31/03/2024, although an earlier completion date is desired. Further to holding an extensive market briefing and engagement event, we have listened to market concerns and have refined the approach and content of the procurement and requirements in a number of areas to address potential issues where possible. WMCA propose to incorporate Clause X1 into the building contract to alleviate Contractors risk on material price fluctuations. This will cover primary materials such as timber, concrete and steel and the codes from BCIS will be provided at ITT. Further Information: The new stations are on the route between Birmingham New Street and Kings Norton to support access for new train services that increase connectivity in the Greater Birmingham area. To meet this objective the project shall deliver: Moseley • Two 6-car platforms (operational length 150m) • Pedestrian access to the station comprising 2no. raised walkways, stairs and lifts • Geotechnical works including piling and soil nailing • Platform waiting canopies, lighting, CCTV, Ticket Vending Machines, Passenger Help Points, PA, CIS Incoming DNO, LV Power Supply/Distribution System. • Permanent Way slew through platforms and associated lineside drainage • Passenger drop-off area with connecting highway access from the adjacent B4217 St Mary’s Row. • Upgrading current highway network to signalized junction to support the above drop off point. Kings Heath • Two 6-car platforms (operational length 150m); • Pedestrian access to the station including a footbridge, lifts and stairs • Platform waiting canopies, lighting, CCTV, Ticket Vending Machines, Passenger Help Points, PA, CIS, Incoming DNO, LV Power Supply/Distribution System. • Permanent Way slew through platforms and associated lineside drainage • A435 High Street highway upgrade Hazelwell • Two 6-car platforms (operational length 150m); • Pedestrian access to the station inc. stairs and lifts • Platform waiting canopies, lighting, CCTV, Ticket Vending Machines, Passenger Help Points, PA, CIS, Incoming DNO, LV Power Supply/Distribution System. • Permanent Way slew through platforms and associated lineside drainage • Passenger drop-off area with connecting highway access from the adjacent Cartland Road. Tenderers are directed to the Project Summary, Scope and the design information for a detailed description of the proposed stations. * The above is a description of the original procurement *

Lot 1 Has Options: No

Contracts

Contract Title: Rail Package 2 Camp Hill Line New Stations

Awards

Award Title: Rail Package 2 Camp Hill Line New Stations

Raw Notice JSON

Expand raw payload
{
  "awards": [
    {
      "hasSubcontracting": true,
      "id": "011048-2025-1",
      "relatedLots": [
        "1"
      ],
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-12602",
          "name": "Volkerfitzpatrick Ltd"
        }
      ],
      "title": "Rail Package 2 Camp Hill Line New Stations"
    }
  ],
  "buyer": {
    "id": "GB-FTS-2655",
    "name": "West Midlands Combined Authority"
  },
  "contracts": [
    {
      "awardID": "011048-2025-1",
      "dateSigned": "2022-04-20T00:00:00+01:00",
      "id": "011048-2025-1",
      "status": "active",
      "title": "Rail Package 2 Camp Hill Line New Stations",
      "value": {
        "amount": 27000000.0,
        "currency": "GBP"
      }
    }
  ],
  "date": "2025-03-25T10:22:12Z",
  "description": "The description provided in section II 2.4 of this notice covers the original competitive procurement that was awarded in June 2022.  The additional works to which this VEAT notice provides for have come about as a result of unforeseen circumstances that the WMCA could not possibly have known about, and therefore were not factored into the original contract value.",
  "id": "011048-2025",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-h6vhtk-04f841",
  "parties": [
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "Birmingham",
        "postalCode": "B19 3SD",
        "region": "UKG",
        "streetAddress": "16 Summer Lane"
      },
      "contactPoint": {
        "email": "procurement.team@wmca.org.uk",
        "telephone": "+44 3453036760"
      },
      "details": {
        "classifications": [
          {
            "description": "Regional or local authority",
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE"
          },
          {
            "description": "General public services",
            "id": "01",
            "scheme": "COFOG"
          }
        ],
        "url": "http://www.wmca.org.uk"
      },
      "id": "GB-FTS-2655",
      "identifier": {
        "legalName": "West Midlands Combined Authority"
      },
      "name": "West Midlands Combined Authority",
      "roles": [
        "buyer"
      ]
    },
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "Hoddesdon",
        "region": "UKH23"
      },
      "details": {
        "scale": "large"
      },
      "id": "GB-FTS-12602",
      "identifier": {
        "legalName": "Volkerfitzpatrick Ltd"
      },
      "name": "Volkerfitzpatrick Ltd",
      "roles": [
        "supplier"
      ]
    },
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "Birmingham"
      },
      "id": "GB-FTS-2656",
      "identifier": {
        "legalName": "WMCA"
      },
      "name": "WMCA",
      "roles": [
        "reviewBody"
      ]
    }
  ],
  "tag": [
    "award",
    "contract"
  ],
  "tender": {
    "classification": {
      "description": "Railway station construction work",
      "id": "45213321",
      "scheme": "CPV"
    },
    "coveredBy": [
      "GPA"
    ],
    "description": "The Project will consist of the design and construction of (3) three new stations at Moseley, Kings Heath and Hazelwell and supporting rail infrastructure works, on the Camp Hill Line between Birmingham New Street and Kings Norton to support access for new train services that increase connectivity in the Greater Birmingham area.\"\n* The above is a description of the original procurement *",
    "id": "03313-2021",
    "items": [
      {
        "deliveryAddresses": [
          {
            "region": "UKG"
          }
        ],
        "id": "1",
        "relatedLot": "1"
      }
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "lots": [
      {
        "description": "Project Overview:\nWe are seeking to appoint a Principal Contractor on a design and build basis under a NEC 4 ECC Target Cost Contract to construct 3 new stations at Moseley, Kings Heath and Hazelwell including supporting rail infrastructure works.\nThe timeline for completion is 31/03/2024, although an earlier completion date is desired.\nFurther to holding an extensive market briefing and engagement event, we have listened to market concerns and have refined the approach and content of the procurement and requirements in a number of areas to address potential issues where possible.\nWMCA propose to incorporate Clause X1 into the building contract to alleviate Contractors risk on material price fluctuations. This will cover primary materials such as timber, concrete and steel and the codes from BCIS will be provided at ITT.\nFurther Information:\nThe new stations are on the route between Birmingham New Street and Kings Norton to support access for new train services that increase connectivity in the Greater Birmingham area. To meet this objective the project shall deliver:\nMoseley\n\u2022 Two 6-car platforms (operational length 150m)\n\u2022 Pedestrian access to the station comprising 2no. raised walkways, stairs and lifts\n\u2022 Geotechnical works including piling and soil nailing\n\u2022 Platform waiting canopies, lighting, CCTV, Ticket Vending Machines, Passenger Help Points, PA, CIS Incoming DNO, LV Power Supply/Distribution System.\n\u2022 Permanent Way slew through platforms and associated lineside drainage\n\u2022 Passenger drop-off area with connecting highway access from the adjacent B4217 St Mary\u2019s Row.\n\u2022 Upgrading current highway network to signalized junction to support the above drop off point.\nKings Heath\n\u2022 Two 6-car platforms (operational length 150m);\n\u2022 Pedestrian access to the station including a footbridge, lifts and stairs\n\u2022 Platform waiting canopies, lighting, CCTV, Ticket Vending Machines, Passenger Help Points, PA, CIS, Incoming DNO, LV Power Supply/Distribution System.\n\u2022 Permanent Way slew through platforms and associated lineside drainage\n\u2022 A435 High Street highway upgrade\nHazelwell\n\u2022 Two 6-car platforms (operational length 150m);\n\u2022 Pedestrian access to the station inc. stairs and lifts\n\u2022 Platform waiting canopies, lighting, CCTV, Ticket Vending Machines, Passenger Help Points, PA, CIS, Incoming DNO, LV Power Supply/Distribution System.\n\u2022 Permanent Way slew through platforms and associated lineside drainage\n\u2022 Passenger drop-off area with connecting highway access from the adjacent Cartland Road.\nTenderers are directed to the Project Summary, Scope and the design information for a detailed description of the proposed stations.\n* The above is a description of the original procurement *",
        "hasOptions": false,
        "id": "1"
      }
    ],
    "mainProcurementCategory": "works",
    "procurementMethod": "limited",
    "procurementMethodDetails": "Negotiated without publication of a contract notice",
    "procurementMethodRationale": "A contract award notice was published in relation to the Package Two  on 22 June 2022 (under FTS reference 2022/S 000-016720), and described the contract as follows:\n\"We are seeking to appoint a Principal Contractor on a design and build basis under a NEC 4 ECC Target Cost Contract to construct 3 new stations at Moseley, Kings Heath and Hazelwell including supporting rail infrastructure works.\nThe Project will consist of the design and construction of (3) three new stations at Moseley, Kings Heath and Hazelwell and supporting rail infrastructure works, on the Camp Hill Line between Birmingham New Street and Kings Norton to support access for new train services that increase connectivity in the Greater Birmingham area.\"\n\n            \nIt has become necessary to modify the contract and increase the Target Price  due to unforeseen circumstances The amendments do not alter the overall nature of the contract that was originally procured, however, it would not be possible to compete this work on the open market due to timescales and work carried out to date by the awarded provider. To ensure service continuity the WMCA has taken the decision to award the contract to their current provider under Regulation 32(2)b (ii) of the Procurement Regulations 2015, based on the grounds that competition is absent for technical reasons. \nThe West Midlands Combined Authority will now enter a 30 day standstill period before formally awarding the contract.",
    "procurementMethodRationaleClassifications": [
      {
        "description": "The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons",
        "id": "D_TECHNICAL",
        "scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL"
      },
      {
        "description": "Extreme urgency brought about by events unforeseeable for the contracting authority/entity and in accordance with the strict conditions stated in the directive",
        "id": "D_EXTREME_URGENCY",
        "scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL"
      }
    ],
    "status": "complete",
    "title": "Rail Package 2 Camp Hill Line New Stations"
  }
}