The Water and Abandoned Metal Mines Programme (WAMM) is the primary delivery mechanism to achieve the statutory Environment Act target to halve the length of rivers polluted by harmful metals from abandoned metal mines by 2038. WAMM is being delivered by a partnership between the Mining Remediation Authority, the Environment Agency and Defra. The former Sharnberry mines are located in County Durham at the far eastern edge of the North Pennines Orefield, in the Pennines Moors. The mines pollute rivers in the Wear catchment, specifically the Euden Beck and downstream Bedburn Beck. The Environment Agency carried out a detailed monitoring programme to measure the metal concentrations and river flows at various points across the catchment. This monitoring indicated that the Sharnberry adit is the most significant source of zinc and cadmium pollution and also contributes to lead pollution. The Environment Agency have advised that a Mine Water Treatment Scheme (MWTS) is required that will require a permanent power connection. In February 2025, it was agreed to progress with Phase 1 of the grid connection, which is from Eggleston Crest to the boundary of the Eggleston Estate access track. This contract is for non-contestable works of the phase 2 grid extension, which is for Northern Powergrid to: - Upgrade the existing two-conductor system to Three-Phase, which involves rebuilding the line. - Carrying out 1x HV closing joint - Undertaking all Senior Authorised Person work associated with all connections to the Distribution System
No linked documents found for this notice.
Lot 1 Status: complete
Document Description: Not published
Award Title: Sharnberry MWTS - Power Connection - Phase 2 Non-Contestable Works
{
"awards": [
{
"aboveThreshold": true,
"contractPeriod": {
"endDate": "2026-12-31T23:59:59Z",
"maxExtentDate": "2027-12-31T23:59:59Z",
"startDate": "2026-02-20T00:00:00Z"
},
"documents": [
{
"datePublished": "2026-02-03T16:44:30Z",
"description": "Transparency notice on Find a Tender",
"documentType": "awardNotice",
"format": "text/html",
"id": "009635-2026",
"noticeType": "UK5",
"url": "https://www.find-tender.service.gov.uk/Notice/009635-2026"
}
],
"hasRenewal": true,
"id": "1",
"items": [
{
"additionalClassifications": [
{
"description": "Installation services of electrical equipment",
"id": "51110000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKC"
}
],
"id": "1",
"relatedLot": "1"
}
],
"mainProcurementCategory": "services",
"milestones": [
{
"dueDate": "2026-02-20T23:59:59Z",
"id": "1",
"status": "scheduled",
"type": "futureSignatureDate"
}
],
"relatedLots": [
"1"
],
"renewal": {
"description": "Extensions will only be required if operational site conditions, weather and other factors delay delivery of services"
},
"status": "pending",
"suppliers": [
{
"id": "GB-COH-02906593",
"name": "NORTHERN POWERGRID (NORTHEAST) PLC"
}
],
"title": "Sharnberry MWTS - Power Connection - Phase 2 Non-Contestable Works",
"value": {
"amount": 435072.02,
"amountGross": 522086.42,
"currency": "GBP"
}
}
],
"buyer": {
"id": "GB-PPON-PRPD-5825-QDVY",
"name": "Mining Remediation Authority"
},
"date": "2026-02-03T16:44:30Z",
"id": "009635-2026",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-0615cf",
"parties": [
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Nottinghamshire",
"postalCode": "NG18 4RG",
"region": "UKF15",
"streetAddress": "200 Lichfield Lane"
},
"contactPoint": {
"email": "peter.kobryn@miningremediation.gov.uk",
"name": "Peter Kobryn"
},
"details": {
"classifications": [
{
"description": "Public authority - central government",
"id": "publicAuthorityCentralGovernment",
"scheme": "UK_CA_TYPE"
}
]
},
"id": "GB-PPON-PRPD-5825-QDVY",
"identifier": {
"id": "PRPD-5825-QDVY",
"scheme": "GB-PPON"
},
"name": "Mining Remediation Authority",
"roles": [
"buyer"
]
},
{
"additionalIdentifiers": [
{
"id": "PDXB-1394-ZPXN",
"scheme": "GB-PPON"
}
],
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Newcastle Upon Tyne",
"postalCode": "NE1 6AF",
"region": "UKC22",
"streetAddress": "Lloyds Court"
},
"contactPoint": {
"email": "purchasing@northernpowergrid.com"
},
"details": {
"scale": "large",
"vcse": false
},
"id": "GB-COH-02906593",
"identifier": {
"id": "02906593",
"scheme": "GB-COH"
},
"name": "NORTHERN POWERGRID (NORTHEAST) PLC",
"roles": [
"supplier"
]
}
],
"tag": [
"award",
"contract"
],
"tender": {
"description": "The Water and Abandoned Metal Mines Programme (WAMM) is the primary delivery mechanism to achieve the statutory Environment Act target to halve the length of rivers polluted by harmful metals from abandoned metal mines by 2038. \nWAMM is being delivered by a partnership between the Mining Remediation Authority, the Environment Agency and Defra. \nThe former Sharnberry mines are located in County Durham at the far eastern edge of the North Pennines Orefield, in the Pennines Moors. \nThe mines pollute rivers in the Wear catchment, specifically the Euden Beck and downstream Bedburn Beck. \nThe Environment Agency carried out a detailed monitoring programme to measure the metal concentrations and river flows at various points across the catchment. This monitoring indicated that the Sharnberry adit is the most significant source of zinc and cadmium pollution and also contributes to lead pollution.\nThe Environment Agency have advised that a Mine Water Treatment Scheme (MWTS) is required that will require a permanent power connection.\nIn February 2025, it was agreed to progress with Phase 1 of the grid connection, which is from Eggleston Crest to the boundary of the Eggleston Estate access track.\nThis contract is for non-contestable works of the phase 2 grid extension, which is for Northern Powergrid to:\n-\tUpgrade the existing two-conductor system to Three-Phase, which involves rebuilding the line. \n-\tCarrying out 1x HV closing joint\n-\tUndertaking all Senior Authorised Person work associated with all connections to the Distribution System",
"documents": [
{
"description": "Not published",
"documentType": "conflictOfInterest",
"id": "conflictOfInterest"
}
],
"id": "CA18/2/1/137",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"id": "1",
"status": "complete"
}
],
"procurementMethod": "direct",
"procurementMethodDetails": "Direct award",
"procurementMethodRationale": "These services fall under the definition of non-contestable works under the auspices of the Electricity Act of 1989\nWhen applying for a new electricity connection to the national grid, non contestable works refer to those elements of the connection process that only the Distribution Network Operator (DNO) can legally carry out. They contrast with contestable works, which independent providers (ICPs or IDNOs) may execute under suitable accreditation.\nIn this instance the DNO is Northern Powergrid",
"procurementMethodRationaleClassifications": [
{
"id": "singleSuppliersTechnicalReasons"
}
],
"status": "complete",
"title": "Sharnberry MWTS - Power Connection - Phase 2 Non-Contestable Works"
}
}