Buyer Name: Tai Tarian Ltd
Buyer Address: Ty Gwyn, Neath, UKL17, SA11 2FP, United Kingdom
Contact Name: Lisa Jones
Contact Email: lisa.jones@taitarian.co.uk
Buyer Name: Tai Tarian Ltd
Buyer Address: Ty Gwyn, Neath, UKL17, SA11 2FP, United Kingdom
Contact Name: Lisa Jones
Contact Email: lisa.jones@taitarian.co.uk
Tai Tarian is seeking to appoint contractors (Providers) to a Framework Agreement for property related repairs and maintenance works. The Framework Agreement will be split into the following eight Lots: Lot 1 – Plumbing Lot 2 – Electrical Lot 3 – Carpentry Lot 4 - Plastering Lot 5 – Communal Aerials Lot 6 - Flooring Lot 7 – External works – Paths, Fencing and Walls Lot 8 – Fabrication of Railings and Gates Lots will be awarded on an individual basis, and a Tenderer can bid for a maximum of four lots. Tenderers must ensure that their submission clearly shows that they’re able to meet the requirements of each Lot, and (if bidding for multiple Lots) not to make any statement or assumption that their bid is conditional on being awarded multiple Lots.
External Link: https://www.find-tender.service.gov.uk/Notice/005080-2026
Link Description: Tender notice on Find a Tender
Lot Title: Plumbing
Lot Description: The scope of this Lot comprises repair and maintenance of plumbing (excluding heating and hot water) as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL1, and in accordance with Specification (Appendix 2AL1). We are seeking to appoint Providers to complete 1-day and 7-day repairs including out of hours, on a fixed term 1 year Call-off Contract. We estimate work to be in the region of 600 – 700 works orders per quarter to address leaks, blockages and faulty plumbing e.g., taps, siphons, fill valves etc. The profile of work allocated is estimated at: • 45% of jobs needing to be completed in 1 day, including out-of-hour emergencies. • 55% of jobs requiring completion in 7 days.
Lot 1 Status: active
Lot 1 Value: GBP 200,000
Lot 1 Value (Gross): GBP 240,000
Lot 1 Contract Start: 2026-04-01T00:00:00+01:00
Lot 1 Contract End: 2027-03-31T23:59:59+01:00
Lot 1 SME Suitable: Yes
Lot 1 Award Criterion (price): Price (60%)
Lot 1 Award Criterion (quality): Quality (40%)
Lot Title: Electrical
Lot Description: The scope of this Lot comprises repair and maintenance of electrical installations and accessories as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL2, and in accordance with Specification (Appendix 2AL2). We are seeking to appoint a Provider to support our in-house maintenance team with: • Emergency repairs Out of Hours – We estimate 120 jobs per quarter needing to be completed on an emergency basis, reinstating power, dealing with unsafe electrical installations. • Periods of high demand and cover for absence e.g. leave, sickness etc – We estimate issuing up to 60 orders per quarter, all of which will be issued with 28-day priorities for various electrical maintenance and testing. • Work to maintain PV systems and batteries, including enabling work for our roofers – We have a planned installation programme currently providing PV to many of our homes. With over 2,000 homes due to have PV installed, we will require assistance of an MCS accredited Provider to undertake maintenance. Our initial requirement is to assist removal of some panels where properties require repairs to roofs. We estimate issuing up to 6 orders per quarter, all of which will have 7-day targets. Over the four-year period, this work is likely to extend repairing or replacing panels and other PV accessories. • Ad-hoc work in relation to extractor fan replacements – We estimate there to be approximately 100 extractor fans to be replaced annually on a planned 28-day target. We expect the successful Provider to attend and reinstate / repair within the allocated timescale. Disruption and damage associated with this to be kept to a minimum. Any work required following completion of repairs will be handed over to Tai Tarian’s Property Services team. Work Orders will be issued as individual Call-off Contracts from two main sources: 1. Directly from our contact centre colleagues (in house during working hours, externally outside of office hours) on receipt of repairs being reported by tenants. These will aim to capture details of the repair being reported before forwarding details with the work order via email to the Provider. 2. Directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties (Table 1). Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot for both the in and out of hours work It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot.
Lot 2 Status: active
Lot 2 Value: GBP 400,000
Lot 2 Value (Gross): GBP 480,000
Lot 2 Contract Start: 2026-04-01T00:00:00+01:00
Lot 2 Contract End: 2030-03-31T23:59:59+01:00
Lot 2 SME Suitable: Yes
Lot 2 Award Criterion (price): Price (60%)
Lot 2 Award Criterion (quality): Quality (40%)
Lot Title: Carpentry
Lot Description: The scope of this Lot comprises installation and maintenance of fire doors as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL3, and in accordance with Specification (Appendix 2AL3) We are seeking to appoint a Provider to complete 7 day and 28-day repairs. We estimate work to be in the region of 35 and 45 orders per quarter to fire doors, namely the installation or replacement of communal doors (not including flat entrance doors) and when necessary, some maintenance to existing doors e.g. closures, adjustments etc. The profile of work allocated is estimated at: • 65% of jobs need to be completed in 7 days. • 35% of jobs requiring completion in 28 days. Providers must have suitable accreditation or equivalent to BM Trada to participate in this work. Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties including those for flats and common areas (Table 2 Breakdown of Blocks and Flats by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot. It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot.
Lot 3 Status: active
Lot 3 Value: GBP 180,000
Lot 3 Value (Gross): GBP 216,000
Lot 3 Contract Start: 2026-04-01T00:00:00+01:00
Lot 3 Contract End: 2030-03-31T23:59:59+01:00
Lot 3 SME Suitable: Yes
Lot 3 Award Criterion (price): Price (60%)
Lot 3 Award Criterion (quality): Quality (40%)
Lot Title: Plastering
Lot Description: The scope of this Lot comprises plastering as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL4, and in accordance with Specification (Appendix 2AL4). We are seeking to appoint a Provider to support our in-house maintenance team with periods of high demand and cover for absence e.g. leave sickness etc. We estimate work to be in the region of 30 orders per quarter to complete orders with 28-day targets. Works Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all of Tai Tarian’s properties (Table 1 Properties by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot. It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot
Lot 4 Status: active
Lot 4 Value: GBP 240,000
Lot 4 Value (Gross): GBP 288,000
Lot 4 Contract Start: 2026-04-01T00:00:00+01:00
Lot 4 Contract End: 2030-03-31T23:59:59+01:00
Lot 4 SME Suitable: Yes
Lot 4 Award Criterion (price): Price (60%)
Lot 4 Award Criterion (quality): Quality (40%)
Lot Title: Communal Aerials
Lot Description: The scope of this Lot comprises work to communal aerials as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL5, and in accordance with Specification (Appendix 2AL5). We are seeking to appoint a Provider to undertake 7-day and 28-day orders. We estimate work to be in the region of 30 orders per quarter to install, maintain or replace communal aerials. The profile of work allocated is estimated at: • 35% of jobs need to be completed in 7 days. • 65% of jobs requiring completion in 28 days. Works Orders will be issued as individual Call-off Contracts directly from our contact centre colleagues (in house during working hours, externally outside of office hours) on receipt of repairs being reported by tenants. These will aim to capture details of the repair being reported before forwarding details with the work order via email to the Provider. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties with communal aerials (Table 2 Breakdown of Blocks and Flats by Ward) Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot. It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot
Lot 5 Status: active
Lot 5 Value: GBP 80,000
Lot 5 Value (Gross): GBP 96,000
Lot 5 Contract Start: 2026-04-01T00:00:00+01:00
Lot 5 Contract End: 2030-03-31T23:59:59+01:00
Lot 5 SME Suitable: Yes
Lot 5 Award Criterion (price): Price (60%)
Lot 5 Award Criterion (quality): Quality (40%)
Lot Title: Flooring
Lot Description: The scope of this Lot comprises replacement of kitchen and bathroom flooring as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1DL6, and in accordance with Specification (Appendix 2BL6) We are seeking to appoint a Provider to undertake 28-day orders. The successful provider will be responsible for undertaking all associated works with the flooring replacement which will include, but not be limited to: • Removal and reinstatement of sanitaryware • Remedial works to flooring e.g. renewal of floorboards and applying self-level materials • Any associated plumbing works • Note – no disruption to gas appliances We estimate work to be in the region of 75 and 100 works orders per quarter to install / replace kitchen or bathroom flooring Renewal of bathroom and WC flooring to be fitted after removal of sanitaryware and same sanitaryware to be refitted on completion of flooring. Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties (Table 1 Properties by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot. It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot
Lot 6 Status: active
Lot 6 Value: GBP 1,100,000
Lot 6 Value (Gross): GBP 1,320,000
Lot 6 Contract Start: 2026-04-01T00:00:00+01:00
Lot 6 Contract End: 2030-03-31T23:59:59+01:00
Lot 6 SME Suitable: Yes
Lot 6 Award Criterion (price): Price (60%)
Lot 6 Award Criterion (quality): Quality (40%)
Lot Title: External Works - Paths, Fencing and Walls
Lot Description: The scope of this Lot comprises repairs and maintenance of paths, fencing and walls as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL7 and the NHF Schedule of Rates for Planned Maintenance (Version 8) included in Appendix 1DL7, and in accordance with Specifications (Appendix 2AL7 and 2BL7 respectively) We are seeking to appoint a Provider to undertake 60 day and 365 day orders. We estimate responsive work (60 day) to be in the region of 30 and 40 orders per quarter to replace fencing, re-build steps and walls, re-lay paths. Planned work (365 day) is estimated to be in the region of 20 orders per quarter. Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all of Tai Tarian’s properties (Table 1 Properties by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 2 Providers as Primary Providers, within this Lot, with one focussing on responsive works and the other planned works. It is anticipated that a maximum of 2 Providers will be appointed as Reserve Providers within this Lot.
Lot 7 Status: active
Lot 7 Value: GBP 1,400,000
Lot 7 Value (Gross): GBP 1,680,000
Lot 7 Contract Start: 2026-04-01T00:00:00+01:00
Lot 7 Contract End: 2030-03-31T23:59:59+01:00
Lot 7 Award Criterion (price): Price (60%)
Lot 7 Award Criterion (quality): Quality (40%)
Lot Title: Fabrication of Railings and Gates
Lot Description: The scope of this Lot comprises repairs and maintenance of paths, fencing and walls as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL8, and the NHF Schedule of Rates for Planned Maintenance (Version 8) included in Appendix 1DL8, and in accordance with Specifications (Appendix 2AL8 and 2BL8 respectively) We are seeking to appoint a Provider to undertake 60-day orders. We estimate work to be in the region of 25 and 30 orders per quarter to manufacture and fit metal gates, fencing and railings. Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties (Table 1 Properties by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 2 Providers as Primary Providers, within this Lot. There is not out of hours service provision included in this Lot.
Lot 8 Status: active
Lot 8 Value: GBP 340,000
Lot 8 Value (Gross): GBP 408,000
Lot 8 Contract Start: 2026-04-01T00:00:00+01:00
Lot 8 Contract End: 2030-03-31T23:59:59+01:00
Lot 8 SME Suitable: Yes
Lot 8 Award Criterion (price): Price (60%)
Lot 8 Award Criterion (quality): Quality (40%)
Document Description: ITT - Responsive Maintenance Framework Agreement - Ref 01003
Document Description: (LOT 1) 1AL1 - NHF Form of Contract 2023 Price Framework Rules
Document Description: (LOT 1) 1BL1 - NHF Form of Contract 2023 Price Framework
Document Description: (LOT 1) 1CL1 - NHF Form of Contract 2023 Schedule of Rates Long.
Document Description: (LOT 2) 1AL2 - NHF Form of Contract 2023 Price Framework Rules.
Document Description: (LOT 2) 1BL2 - NHF Form of Contract 2023 Price Framework
Document Description: (LOT 2) 1CL2 - NHF Form of Contract 2023 Schedule of Rates Long
Document Description: (LOT 3) 1AL3 - NHF Form of Contract 2023 Price Framework Rules
Document Description: (LOT 3) 1BL3 - NHF Form of Contract 2023 Price Framework
Document Description: (LOT 3) 1CL3 - NHF Form of Contract 2023 Schedule of Rates Long.
Document Description: (LOT 4) 1AL4 - NHF Form of Contract 2023 Price Framework Rules.
Document Description: (LOT 4) 1BL4 - NHF Form of Contract 2023 Price Framework
Document Description: (LOT 4) 1CL4 - NHF Form of Contract 2023 Schedule of Rates Long.
Document Description: (LOT 5) 1AL5 - NHF Form of Contract 2023 Price Framework Rules.
Document Description: (LOT 5) 1BL5 - NHF Form of Contract 2023 Price Framework
Document Description: (LOT 5) 1CL5 - NHF Form of Contract 2023 Schedule of Rates Long
Document Description: (LOT 6) 1AL6 - NHF Form of Contract 2023 Price Framework Rules.
Document Description: (LOT 6) 1BL6 - NHF Form of Contract 2023 Price Framework
Document Description: (LOT 6) 1DL6 - NHF Form of Contract 2023 Schedule of Rates Long.
Document Description: (LOT 7) 1AL7 - NHF Form of Contract 2023 Price Framework Rules.
Document Description: (LOT 7) 1BL7 - NHF Form of Contract 2023 Price Framework
Document Description: (LOT 7) 1CL7 - NHF Form of Contract 2023 Schedule of Rates Long (RESPONSIVE MAINTENANCE)
Document Description: (LOT 7) 1DL7 - NHF Form of Contract 2023 Schedule of Rates Long (PLANNED MAINTENANCE)
Document Description: (LOT 8) 1AL8 - NHF Form of Contract 2023 Price Framework Rules
Document Description: (LOT 8) 1BL8 - NHF Form of Contract 2023 Price Framework
Document Description: (LOT 8) 1CL8 - NHF Form of Contract 2023 Schedule of Rates Long (RESPONSIVE MAINTENANCE)
Document Description: (LOT 8) 1DL8 - NHF Form of Contract 2023 Schedule of Rates Long (PLANNED MAINTENANCE).
Document Description: (LOT 1) 2AL1 - NHF Form of Contract 2023 Responsive v8 Specification.
Document Description: (LOT 2) 2AL2 - NHF Form of Contract 2023 Responsive v8 Specification
Document Description: (LOT 3) 2AL3 - NHF Form of Contract 2023 Responsive v8 Specification
Document Description: (LOT 4) 2AL4 - NHF Form of Contract 2023 Responsive v8 Specification
Document Description: (LOT 5) 2AL5 - NHF Form of Contract 2023 Responsive v8 Specification
Document Description: (LOT 6) 2BL6 - NHF Form of Contract 2023 Planned Maint v8 Specification
Document Description: (LOT 7) 2AL7 - NHF Form of Contract 2023 Responsive v8 Specification
Document Description: (LOT 7) 2BL7 - NHF Form of Contract 2023 Planned Maint v8 Specification.
Document Description: (LOT 8) 2AL8 - NHF Form of Contract 2023 Responsive v8 Specification
Document Description: (LOT 8) 2BL8 - NHF Form of Contract 2023 Planned Maint v8 Specification
Document Description: Pre Construction Information
Document Description: 4 - NHF Form of Contract 2023 Preliminaries
Document Description: 5 - NHF Form of Contract 2023 Contract Conditions
Document Description: 6 -NHF Form of Contract 2023 Volume 1 (a2) Articles & Contract Details
Document Description: 7L1 KPIs - Plumbing
Document Description: 7L2 KPIs - Electrical
Document Description: 7L3 KPIs - Carpentry
Document Description: 7L4 KPIs - Plastering
Document Description: 7L5 KPIs - Communal Aerials
Document Description: 7L6 KPIs - Flooring
Document Description: 7L7 KPIs - Externals
Document Description: 7L8 KPIs - Fabrication
Document Description: 8 - Framework Agreement - Responsive Maintenance Framework Agreement - Ref 01003
Document Description: Tender notice on Find a Tender
{
"buyer": {
"id": "GB-PPON-PRRR-2818-QQVJ",
"name": "Tai Tarian Ltd"
},
"date": "2026-01-21T08:48:25Z",
"id": "005080-2026",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-0502fa",
"parties": [
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Neath",
"postalCode": "SA11 2FP",
"region": "UKL17",
"streetAddress": "Ty Gwyn"
},
"contactPoint": {
"email": "lisa.jones@taitarian.co.uk",
"name": "Lisa Jones"
},
"details": {
"classifications": [
{
"description": "Public authority - sub-central government",
"id": "publicAuthoritySubCentralGovernment",
"scheme": "UK_CA_TYPE"
},
{
"description": "Welsh devolved regulations apply",
"id": "GB-WLS",
"scheme": "UK_CA_DEVOLVED_REGULATIONS"
}
],
"url": "http://www.taitarian.co.uk"
},
"id": "GB-PPON-PRRR-2818-QQVJ",
"identifier": {
"id": "PRRR-2818-QQVJ",
"scheme": "GB-PPON"
},
"name": "Tai Tarian Ltd",
"roles": [
"buyer"
]
}
],
"tag": [
"tender"
],
"tender": {
"aboveThreshold": false,
"description": "Tai Tarian is seeking to appoint contractors (Providers) to a Framework Agreement for property related repairs and maintenance works.\nThe Framework Agreement will be split into the following eight Lots:\nLot 1 \u2013 Plumbing\nLot 2 \u2013 Electrical\nLot 3 \u2013 Carpentry\nLot 4 - Plastering\nLot 5 \u2013 Communal Aerials\nLot 6 - Flooring\nLot 7 \u2013 External works \u2013 Paths, Fencing and Walls\nLot 8 \u2013 Fabrication of Railings and Gates\nLots will be awarded on an individual basis, and a Tenderer can bid for a maximum of four lots.\nTenderers must ensure that their submission clearly shows that they\u2019re able to meet the requirements of each Lot, and (if bidding for multiple Lots) not to make any statement or assumption that their bid is conditional on being awarded multiple Lots.",
"documents": [
{
"description": "ITT - Responsive Maintenance Framework Agreement - Ref 01003",
"documentType": "biddingDocuments",
"id": "L-1",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357550"
},
{
"description": "(LOT 1) 1AL1 - NHF Form of Contract 2023 Price Framework Rules",
"documentType": "biddingDocuments",
"id": "L-2",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357551"
},
{
"description": "(LOT 1) 1BL1 - NHF Form of Contract 2023 Price Framework",
"documentType": "biddingDocuments",
"id": "L-3",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357552"
},
{
"description": "(LOT 1) 1CL1 - NHF Form of Contract 2023 Schedule of Rates Long.",
"documentType": "biddingDocuments",
"id": "L-4",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357553"
},
{
"description": "(LOT 2) 1AL2 - NHF Form of Contract 2023 Price Framework Rules.",
"documentType": "biddingDocuments",
"id": "L-5",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357554"
},
{
"description": "(LOT 2) 1BL2 - NHF Form of Contract 2023 Price Framework",
"documentType": "biddingDocuments",
"id": "L-6",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357555"
},
{
"description": "(LOT 2) 1CL2 - NHF Form of Contract 2023 Schedule of Rates Long",
"documentType": "biddingDocuments",
"id": "L-7",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357556"
},
{
"description": "(LOT 3) 1AL3 - NHF Form of Contract 2023 Price Framework Rules",
"documentType": "biddingDocuments",
"id": "L-8",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357557"
},
{
"description": "(LOT 3) 1BL3 - NHF Form of Contract 2023 Price Framework",
"documentType": "biddingDocuments",
"id": "L-9",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357558"
},
{
"description": "(LOT 3) 1CL3 - NHF Form of Contract 2023 Schedule of Rates Long.",
"documentType": "biddingDocuments",
"id": "L-10",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357559"
},
{
"description": "(LOT 4) 1AL4 - NHF Form of Contract 2023 Price Framework Rules.",
"documentType": "biddingDocuments",
"id": "L-11",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357560"
},
{
"description": "(LOT 4) 1BL4 - NHF Form of Contract 2023 Price Framework",
"documentType": "biddingDocuments",
"id": "L-12",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357562"
},
{
"description": "(LOT 4) 1CL4 - NHF Form of Contract 2023 Schedule of Rates Long.",
"documentType": "biddingDocuments",
"id": "L-13",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357563"
},
{
"description": "(LOT 5) 1AL5 - NHF Form of Contract 2023 Price Framework Rules.",
"documentType": "biddingDocuments",
"id": "L-14",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357564"
},
{
"description": "(LOT 5) 1BL5 - NHF Form of Contract 2023 Price Framework",
"documentType": "biddingDocuments",
"id": "L-15",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357565"
},
{
"description": "(LOT 5) 1CL5 - NHF Form of Contract 2023 Schedule of Rates Long",
"documentType": "biddingDocuments",
"id": "L-16",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357566"
},
{
"description": "(LOT 6) 1AL6 - NHF Form of Contract 2023 Price Framework Rules.",
"documentType": "biddingDocuments",
"id": "L-18",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357567"
},
{
"description": "(LOT 6) 1BL6 - NHF Form of Contract 2023 Price Framework",
"documentType": "biddingDocuments",
"id": "L-19",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357568"
},
{
"description": "(LOT 6) 1DL6 - NHF Form of Contract 2023 Schedule of Rates Long.",
"documentType": "biddingDocuments",
"id": "L-20",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357569"
},
{
"description": "(LOT 7) 1AL7 - NHF Form of Contract 2023 Price Framework Rules.",
"documentType": "biddingDocuments",
"id": "L-21",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357570"
},
{
"description": "(LOT 7) 1BL7 - NHF Form of Contract 2023 Price Framework",
"documentType": "biddingDocuments",
"id": "L-22",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357571"
},
{
"description": "(LOT 7) 1CL7 - NHF Form of Contract 2023 Schedule of Rates Long (RESPONSIVE MAINTENANCE)",
"documentType": "biddingDocuments",
"id": "L-23",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357572"
},
{
"description": "(LOT 7) 1DL7 - NHF Form of Contract 2023 Schedule of Rates Long (PLANNED MAINTENANCE)",
"documentType": "biddingDocuments",
"id": "L-24",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357573"
},
{
"description": "(LOT 8) 1AL8 - NHF Form of Contract 2023 Price Framework Rules",
"documentType": "biddingDocuments",
"id": "L-25",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357574"
},
{
"description": "(LOT 8) 1BL8 - NHF Form of Contract 2023 Price Framework",
"documentType": "biddingDocuments",
"id": "L-26",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357575"
},
{
"description": "(LOT 8) 1CL8 - NHF Form of Contract 2023 Schedule of Rates Long (RESPONSIVE MAINTENANCE)",
"documentType": "biddingDocuments",
"id": "L-27",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357576"
},
{
"description": "(LOT 8) 1DL8 - NHF Form of Contract 2023 Schedule of Rates Long (PLANNED MAINTENANCE).",
"documentType": "biddingDocuments",
"id": "L-28",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357577"
},
{
"description": "(LOT 1) 2AL1 - NHF Form of Contract 2023 Responsive v8 Specification.",
"documentType": "biddingDocuments",
"id": "L-29",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357578"
},
{
"description": "(LOT 2) 2AL2 - NHF Form of Contract 2023 Responsive v8 Specification",
"documentType": "biddingDocuments",
"id": "L-30",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357579"
},
{
"description": "(LOT 3) 2AL3 - NHF Form of Contract 2023 Responsive v8 Specification",
"documentType": "biddingDocuments",
"id": "L-31",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357580"
},
{
"description": "(LOT 4) 2AL4 - NHF Form of Contract 2023 Responsive v8 Specification",
"documentType": "biddingDocuments",
"id": "L-32",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357581"
},
{
"description": "(LOT 5) 2AL5 - NHF Form of Contract 2023 Responsive v8 Specification",
"documentType": "biddingDocuments",
"id": "L-33",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357582"
},
{
"description": "(LOT 6) 2BL6 - NHF Form of Contract 2023 Planned Maint v8 Specification",
"documentType": "biddingDocuments",
"id": "L-34",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357583"
},
{
"description": "(LOT 7) 2AL7 - NHF Form of Contract 2023 Responsive v8 Specification",
"documentType": "biddingDocuments",
"id": "L-35",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357584"
},
{
"description": "(LOT 7) 2BL7 - NHF Form of Contract 2023 Planned Maint v8 Specification.",
"documentType": "biddingDocuments",
"id": "L-36",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357585"
},
{
"description": "(LOT 8) 2AL8 - NHF Form of Contract 2023 Responsive v8 Specification",
"documentType": "biddingDocuments",
"id": "L-37",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357586"
},
{
"description": "(LOT 8) 2BL8 - NHF Form of Contract 2023 Planned Maint v8 Specification",
"documentType": "biddingDocuments",
"id": "L-38",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357588"
},
{
"description": "Pre Construction Information",
"documentType": "biddingDocuments",
"id": "L-39",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357589"
},
{
"description": "4 - NHF Form of Contract 2023 Preliminaries",
"documentType": "biddingDocuments",
"id": "L-40",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357590"
},
{
"description": "5 - NHF Form of Contract 2023 Contract Conditions",
"documentType": "biddingDocuments",
"id": "L-41",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357591"
},
{
"description": "6 -NHF Form of Contract 2023 Volume 1 (a2) Articles \u0026 Contract Details",
"documentType": "biddingDocuments",
"id": "L-42",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357592"
},
{
"description": "7L1 KPIs - Plumbing",
"documentType": "biddingDocuments",
"id": "L-43",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357593"
},
{
"description": "7L2 KPIs - Electrical",
"documentType": "biddingDocuments",
"id": "L-44",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357594"
},
{
"description": "7L3 KPIs - Carpentry",
"documentType": "biddingDocuments",
"id": "L-45",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357595"
},
{
"description": "7L4 KPIs - Plastering",
"documentType": "biddingDocuments",
"id": "L-46",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357596"
},
{
"description": "7L5 KPIs - Communal Aerials",
"documentType": "biddingDocuments",
"id": "L-47",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357597"
},
{
"description": "7L6 KPIs - Flooring",
"documentType": "biddingDocuments",
"id": "L-48",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357598"
},
{
"description": "7L7 KPIs - Externals",
"documentType": "biddingDocuments",
"id": "L-49",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357599"
},
{
"description": "7L8 KPIs - Fabrication",
"documentType": "biddingDocuments",
"id": "L-50",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357600"
},
{
"description": "8 - Framework Agreement - Responsive Maintenance Framework Agreement - Ref 01003",
"documentType": "biddingDocuments",
"id": "L-51",
"url": "https://www.sell2wales.gov.wales/Assets/NoticeBuilder_FileDownload.aspx?id=357602"
},
{
"datePublished": "2026-01-21T08:48:25Z",
"description": "Tender notice on Find a Tender",
"documentType": "tenderNotice",
"format": "text/html",
"id": "005080-2026",
"noticeType": "UK4",
"url": "https://www.find-tender.service.gov.uk/Notice/005080-2026"
}
],
"enquiryPeriod": {
"endDate": "2026-02-20T12:00:00+00:00"
},
"id": "01003",
"items": [
{
"additionalClassifications": [
{
"description": "Plumbing and sanitary works",
"id": "45330000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL17"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL18"
}
],
"id": "1",
"relatedLot": "1"
},
{
"additionalClassifications": [
{
"description": "Electrical installation work",
"id": "45310000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL17"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL18"
}
],
"id": "2",
"relatedLot": "2"
},
{
"additionalClassifications": [
{
"description": "Joinery and carpentry installation work",
"id": "45420000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL17"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL18"
}
],
"id": "3",
"relatedLot": "3"
},
{
"additionalClassifications": [
{
"description": "Floor and wall covering work",
"id": "45430000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL17"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL18"
}
],
"id": "4",
"relatedLot": "4"
},
{
"additionalClassifications": [
{
"description": "Television aerial installation work",
"id": "45312320",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL17"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL18"
}
],
"id": "5",
"relatedLot": "5"
},
{
"additionalClassifications": [
{
"description": "Floor and wall covering work",
"id": "45430000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL17"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL18"
}
],
"id": "6",
"relatedLot": "6"
},
{
"additionalClassifications": [
{
"description": "Footpath construction work",
"id": "45233161",
"scheme": "CPV"
},
{
"description": "Fencing, railing and safety equipment installation work",
"id": "45340000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL17"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL18"
}
],
"id": "7",
"relatedLot": "7"
},
{
"additionalClassifications": [
{
"description": "Fencing, railing and safety equipment installation work",
"id": "45340000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL17"
},
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKL18"
}
],
"id": "8",
"relatedLot": "8"
}
],
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"awardCriteria": {
"criteria": [
{
"description": "Price",
"name": "Price",
"numbers": [
{
"number": 60.0,
"weight": "percentageExact"
}
],
"type": "price"
},
{
"description": "Quality",
"name": "Quality",
"numbers": [
{
"number": 40.0,
"weight": "percentageExact"
}
],
"type": "quality"
}
]
},
"contractPeriod": {
"endDate": "2027-03-31T23:59:59+01:00",
"startDate": "2026-04-01T00:00:00+01:00"
},
"description": "The scope of this Lot comprises repair and maintenance of plumbing (excluding heating and hot water) as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL1, and in accordance with Specification (Appendix 2AL1).\nWe are seeking to appoint Providers to complete 1-day and 7-day repairs including out of hours, on a fixed term 1 year Call-off Contract.\nWe estimate work to be in the region of 600 \u2013 700 works orders per quarter to address leaks, blockages and faulty plumbing e.g., taps, siphons, fill valves etc.\nThe profile of work allocated is estimated at:\n\u2022\t45% of jobs needing to be completed in 1 day, including out-of-hour emergencies.\n\u2022\t55% of jobs requiring completion in 7 days.",
"id": "1",
"status": "active",
"suitability": {
"sme": true,
"vcse": true
},
"title": "Plumbing",
"value": {
"amount": 200000,
"amountGross": 240000,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "Price",
"name": "Price",
"numbers": [
{
"number": 60.0,
"weight": "percentageExact"
}
],
"type": "price"
},
{
"description": "Quality",
"name": "Quality",
"numbers": [
{
"number": 40.0,
"weight": "percentageExact"
}
],
"type": "quality"
}
]
},
"contractPeriod": {
"endDate": "2030-03-31T23:59:59+01:00",
"startDate": "2026-04-01T00:00:00+01:00"
},
"description": "The scope of this Lot comprises repair and maintenance of electrical installations and accessories as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL2, and in accordance with Specification (Appendix 2AL2).\nWe are seeking to appoint a Provider to support our in-house maintenance team with:\n\u2022\tEmergency repairs Out of Hours \u2013 We estimate 120 jobs per quarter needing to be completed on an emergency basis, reinstating power, dealing with unsafe electrical installations.\n\u2022\tPeriods of high demand and cover for absence e.g. leave, sickness etc \u2013 We estimate issuing up to 60 orders per quarter, all of which will be issued with 28-day priorities for various electrical maintenance and testing.\n\u2022\tWork to maintain PV systems and batteries, including enabling work for our roofers \u2013 We have a planned installation programme currently providing PV to many of our homes. With over 2,000 homes due to have PV installed, we will require assistance of an MCS accredited Provider to undertake maintenance. Our initial requirement is to assist removal of some panels where properties require repairs to roofs. We estimate issuing up to 6 orders per quarter, all of which will have 7-day targets. Over the four-year period, this work is likely to extend repairing or replacing panels and other PV accessories.\n\u2022\tAd-hoc work in relation to extractor fan replacements \u2013 We estimate there to be approximately 100 extractor fans to be replaced annually on a planned 28-day target. \nWe expect the successful Provider to attend and reinstate / repair within the allocated timescale. Disruption and damage associated with this to be kept to a minimum.\nAny work required following completion of repairs will be handed over to Tai Tarian\u2019s Property Services team.\nWork Orders will be issued as individual Call-off Contracts from two main sources:\n1.\tDirectly from our contact centre colleagues (in house during working hours, externally outside of office hours) on receipt of repairs being reported by tenants. These will aim to capture details of the repair being reported before forwarding details with the work order via email to the Provider.\n2.\tDirectly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email.\nThe Provider will be required to provide adequate resource to cover all Tai Tarian\u2019s properties (Table 1).\nTai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot for both the in and out of hours work\nIt is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot.",
"id": "2",
"status": "active",
"suitability": {
"sme": true,
"vcse": true
},
"title": "Electrical",
"value": {
"amount": 400000,
"amountGross": 480000,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "Price",
"name": "Price",
"numbers": [
{
"number": 60.0,
"weight": "percentageExact"
}
],
"type": "price"
},
{
"description": "Quality",
"name": "Quality",
"numbers": [
{
"number": 40.0,
"weight": "percentageExact"
}
],
"type": "quality"
}
]
},
"contractPeriod": {
"endDate": "2030-03-31T23:59:59+01:00",
"startDate": "2026-04-01T00:00:00+01:00"
},
"description": "The scope of this Lot comprises installation and maintenance of fire doors as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL3, and in accordance with Specification (Appendix 2AL3)\nWe are seeking to appoint a Provider to complete 7 day and 28-day repairs.\nWe estimate work to be in the region of 35 and 45 orders per quarter to fire doors, namely the installation or replacement of communal doors (not including flat entrance doors) and when necessary, some maintenance to existing doors e.g. closures, adjustments etc.\nThe profile of work allocated is estimated at:\n\u2022\t65% of jobs need to be completed in 7 days.\n\u2022\t35% of jobs requiring completion in 28 days.\nProviders must have suitable accreditation or equivalent to BM Trada to participate in this work.\nWork Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email.\nThe Provider will be required to provide adequate resource to cover all Tai Tarian\u2019s properties including those for flats and common areas (Table 2 Breakdown of Blocks and Flats by Ward). \nTai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot.\nIt is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot.",
"id": "3",
"status": "active",
"suitability": {
"sme": true,
"vcse": true
},
"title": "Carpentry",
"value": {
"amount": 180000,
"amountGross": 216000,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "Price",
"name": "Price",
"numbers": [
{
"number": 60.0,
"weight": "percentageExact"
}
],
"type": "price"
},
{
"description": "Quality",
"name": "Quality",
"numbers": [
{
"number": 40.0,
"weight": "percentageExact"
}
],
"type": "quality"
}
]
},
"contractPeriod": {
"endDate": "2030-03-31T23:59:59+01:00",
"startDate": "2026-04-01T00:00:00+01:00"
},
"description": "The scope of this Lot comprises plastering as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL4, and in accordance with Specification (Appendix 2AL4).\nWe are seeking to appoint a Provider to support our in-house maintenance team with periods of high demand and cover for absence e.g. leave sickness etc.\nWe estimate work to be in the region of 30 orders per quarter to complete orders with 28-day targets. \nWorks Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email.\nThe Provider will be required to provide adequate resource to cover all of Tai Tarian\u2019s properties (Table 1 Properties by Ward).\nTai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot.\nIt is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot",
"id": "4",
"status": "active",
"suitability": {
"sme": true,
"vcse": true
},
"title": "Plastering",
"value": {
"amount": 240000,
"amountGross": 288000,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "Price",
"name": "Price",
"numbers": [
{
"number": 60.0,
"weight": "percentageExact"
}
],
"type": "price"
},
{
"description": "Quality",
"name": "Quality",
"numbers": [
{
"number": 40.0,
"weight": "percentageExact"
}
],
"type": "quality"
}
]
},
"contractPeriod": {
"endDate": "2030-03-31T23:59:59+01:00",
"startDate": "2026-04-01T00:00:00+01:00"
},
"description": "The scope of this Lot comprises work to communal aerials as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL5, and in accordance with Specification (Appendix 2AL5).\nWe are seeking to appoint a Provider to undertake 7-day and 28-day orders.\nWe estimate work to be in the region of 30 orders per quarter to install, maintain or replace communal aerials.\nThe profile of work allocated is estimated at:\n\u2022\t35% of jobs need to be completed in 7 days.\n\u2022\t65% of jobs requiring completion in 28 days.\nWorks Orders will be issued as individual Call-off Contracts directly from our contact centre colleagues (in house during working hours, externally outside of office hours) on receipt of repairs being reported by tenants. These will aim to capture details of the repair being reported before forwarding details with the work order via email to the Provider.\nThe Provider will be required to provide adequate resource to cover all Tai Tarian\u2019s properties with communal aerials (Table 2 Breakdown of Blocks and Flats by Ward) \nTai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot.\nIt is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot",
"id": "5",
"status": "active",
"suitability": {
"sme": true,
"vcse": true
},
"title": "Communal Aerials",
"value": {
"amount": 80000,
"amountGross": 96000,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "Price",
"name": "Price",
"numbers": [
{
"number": 60.0,
"weight": "percentageExact"
}
],
"type": "price"
},
{
"description": "Quality",
"name": "Quality",
"numbers": [
{
"number": 40.0,
"weight": "percentageExact"
}
],
"type": "quality"
}
]
},
"contractPeriod": {
"endDate": "2030-03-31T23:59:59+01:00",
"startDate": "2026-04-01T00:00:00+01:00"
},
"description": "The scope of this Lot comprises replacement of kitchen and bathroom flooring as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1DL6, and in accordance with Specification (Appendix 2BL6)\nWe are seeking to appoint a Provider to undertake 28-day orders.\nThe successful provider will be responsible for undertaking all associated works with the flooring replacement which will include, but not be limited to: \n\u2022\tRemoval and reinstatement of sanitaryware\n\u2022\tRemedial works to flooring e.g. renewal of floorboards and applying self-level materials\n\u2022\tAny associated plumbing works\n\u2022\tNote \u2013 no disruption to gas appliances\nWe estimate work to be in the region of 75 and 100 works orders per quarter to install / replace kitchen or bathroom flooring \nRenewal of bathroom and WC flooring to be fitted after removal of sanitaryware and same sanitaryware to be refitted on completion of flooring.\nWork Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email.\nThe Provider will be required to provide adequate resource to cover all Tai Tarian\u2019s properties (Table 1 Properties by Ward).\nTai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot.\nIt is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot",
"id": "6",
"status": "active",
"suitability": {
"sme": true,
"vcse": true
},
"title": "Flooring",
"value": {
"amount": 1100000,
"amountGross": 1320000,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "Price",
"name": "Price",
"numbers": [
{
"number": 60.0,
"weight": "percentageExact"
}
],
"type": "price"
},
{
"description": "Quality",
"name": "Quality",
"numbers": [
{
"number": 40.0,
"weight": "percentageExact"
}
],
"type": "quality"
}
]
},
"contractPeriod": {
"endDate": "2030-03-31T23:59:59+01:00",
"startDate": "2026-04-01T00:00:00+01:00"
},
"description": "The scope of this Lot comprises repairs and maintenance of paths, fencing and walls as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL7 and the NHF Schedule of Rates for Planned Maintenance (Version 8) included in Appendix 1DL7, and in accordance with Specifications (Appendix 2AL7 and 2BL7 respectively)\nWe are seeking to appoint a Provider to undertake 60 day and 365 day orders.\nWe estimate responsive work (60 day) to be in the region of 30 and 40 orders per quarter to replace fencing, re-build steps and walls, re-lay paths.\nPlanned work (365 day) is estimated to be in the region of 20 orders per quarter.\nWork Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email.\nThe Provider will be required to provide adequate resource to cover all of Tai Tarian\u2019s properties (Table 1 Properties by Ward).\nTai Tarian intends (but there is no obligation) to appoint a maximum of 2 Providers as Primary Providers, within this Lot, with one focussing on responsive works and the other planned works. \nIt is anticipated that a maximum of 2 Providers will be appointed as Reserve Providers within this Lot.",
"id": "7",
"status": "active",
"title": "External Works - Paths, Fencing and Walls",
"value": {
"amount": 1400000,
"amountGross": 1680000,
"currency": "GBP"
}
},
{
"awardCriteria": {
"criteria": [
{
"description": "Price",
"name": "Price",
"numbers": [
{
"number": 60.0,
"weight": "percentageExact"
}
],
"type": "price"
},
{
"description": "Quality",
"name": "Quality",
"numbers": [
{
"number": 40.0,
"weight": "percentageExact"
}
],
"type": "quality"
}
]
},
"contractPeriod": {
"endDate": "2030-03-31T23:59:59+01:00",
"startDate": "2026-04-01T00:00:00+01:00"
},
"description": "The scope of this Lot comprises repairs and maintenance of paths, fencing and walls as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL8, and the NHF Schedule of Rates for Planned Maintenance (Version 8) included in Appendix 1DL8, and in accordance with Specifications (Appendix 2AL8 and 2BL8 respectively)\nWe are seeking to appoint a Provider to undertake 60-day orders.\nWe estimate work to be in the region of 25 and 30 orders per quarter to manufacture and fit metal gates, fencing and railings.\nWork Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email.\nThe Provider will be required to provide adequate resource to cover all Tai Tarian\u2019s properties (Table 1 Properties by Ward).\nTai Tarian intends (but there is no obligation) to appoint a maximum of 2 Providers as Primary Providers, within this Lot. There is not out of hours service provision included in this Lot.",
"id": "8",
"status": "active",
"suitability": {
"sme": true,
"vcse": true
},
"title": "Fabrication of Railings and Gates",
"value": {
"amount": 340000,
"amountGross": 408000,
"currency": "GBP"
}
}
],
"mainProcurementCategory": "works",
"procurementMethod": "open",
"procurementMethodDetails": "Below threshold - open competition",
"status": "active",
"submissionMethodDetails": "https://www.sell2wales.gov.wales/",
"submissionTerms": {
"electronicSubmissionPolicy": "allowed"
},
"tenderPeriod": {
"endDate": "2026-03-03T17:00:00+00:00"
},
"title": "Responsive Maintenance Framework Agreement - Ref 01003",
"value": {
"amount": 3940000,
"amountGross": 4728000,
"currency": "GBP"
}
}
}