← Back to opportunities

PEACEPLUS Works Contractor for Reconnected Belfast Project at Waterworks and Alexandra Park

Belfast City Council

Buyer Contact Info

Buyer Name: Belfast City Council

Buyer Address: 9-21 Adelaide Street, Belfast, UKN06, BT2 8DJ, United Kingdom

Contact Email: pdu@belfastcity.gov.uk

Status
active
Procedure
selective
Value
n/a
Published
16 Jan 2026, 14:17
Deadline
16 Feb 2026, 12:00
Contract Start
n/a
Contract End
n/a
Category
works
CPV
45112710 - Landscaping work for green areas
Region
n/a
Awarded To
n/a
Official Source
Open Find a Tender

Description

The Project focuses on re-generating Waterworks and Alexandra Park, the objective of the project is to increase cross-community integration through a transformed shared space in north Belfast, which will enable 33.18 hectares of parkland space to be upgraded and capable of facilitating participation of thousands of people from all communities. Improvements at Waterworks Park comprise the demolition of the existing Waterworks Bothy and replacement with a new building to include public toilets, Changing Places, multi-purpose community room and kitchenette, extension to existing Cavehill Road gatehouse building, entrance improvements, new events space including multipurpose decking, resurfacing of footways, new pedestrian lighting along key routes, a dog park, replacement platforms and viewing area, replacement surface to existing small sided 3G pitch, and upgrades to existing Queen Mary’s playground. Improvements at Alexandra Park include the resurfacing of footways, new pedestrian lighting along key routes, new reinforced grass event space, new lake viewing area, new public toilets and changing places, entrance improvements, 2no existing bridges replaced, new pedestrian entrance, new multi-sport synthetic surface with cover, and upgrades to existing play parks. Streetscape improvements along Camberwell Terrace and Castleton Gardens include resurfacing of footways with new kerbs; resurfaced carriageways and new tactile paving at pedestrian crossings; and all associated works. Additionally, works include refurbishment and safety works to the Waterworks upper and lower reservoirs, and Alexandra Park lake reservoir, to be complemented with wider environmental, landscape and connectivity improvements. The proposed reservoir works comprise of a new overflow structure with reinforcement and protection of the return embankment parallel to the bywash channel at Waterworks Upper reservoir, repairs to the upstream face of Waterworks Lower reservoir with the addition of wetland planting to reduce the overall capacity of the reservoir, and removal of an existing parapet wall and embankment reinforcement at the Alexandra Park Lake reservoir.

Linked Documents

No linked documents found for this notice.

Opportunity Context

Lots

Lot Description: The Project focuses on re-generating Waterworks and Alexandra Park, the objective of the project is to increase cross-community integration through a transformed shared space in north Belfast, which will enable 33.18 hectares of parkland space to be upgraded and capable of facilitating participation of thousands of people from all communities. Improvements at Waterworks Park comprise the demolition of the existing Waterworks Bothy and replacement with a new building to include public toilets, Changing Places, multi-purpose community room and kitchenette, extension to existing Cavehill Road gatehouse building, entrance improvements, new events space including multipurpose decking, resurfacing of footways, new pedestrian lighting along key routes, a dog park, replacement platforms and viewing area, replacement surface to existing small sided 3G pitch, and upgrades to existing Queen Mary’s playground. Improvements at Alexandra Park include the resurfacing of footways, new pedestrian lighting along key routes, new reinforced grass event space, new lake viewing area, new public toilets and changing places, entrance improvements, 2no existing bridges replaced, new pedestrian entrance, new multi-sport synthetic surface with cover, and upgrades to existing play parks. Streetscape improvements along Camberwell Terrace and Castleton Gardens include resurfacing of footways with new kerbs; resurfaced carriageways and new tactile paving at pedestrian crossings; and all associated works. Additionally, works include refurbishment and safety works to the Waterworks upper and lower reservoirs, and Alexandra Park lake reservoir, to be complemented with wider environmental, landscape and connectivity improvements. The proposed reservoir works comprise of a new overflow structure with reinforcement and protection of the return embankment parallel to the bywash channel at Waterworks Upper reservoir, repairs to the upstream face of Waterworks Lower reservoir with the addition of wetland planting to reduce the overall capacity of the reservoir, and removal of an existing parapet wall and embankment reinforcement at the Alexandra Park Lake reservoir.

Lot 1 Status: active

Lot 1 Has Options: No

Raw Notice JSON

Expand raw payload
{
  "buyer": {
    "id": "GB-FTS-21397",
    "name": "Belfast City Council"
  },
  "date": "2026-01-16T14:17:32Z",
  "id": "003934-2026",
  "initiationType": "tender",
  "language": "en",
  "ocid": "ocds-h6vhtk-0607bd",
  "parties": [
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "Belfast",
        "postalCode": "BT2 8DJ",
        "region": "UKN06",
        "streetAddress": "9-21 Adelaide Street"
      },
      "contactPoint": {
        "email": "pdu@belfastcity.gov.uk",
        "url": "https://e-sourcingni.ukp.app.jaggaer.com/web/login.shtml"
      },
      "details": {
        "classifications": [
          {
            "description": "Regional or local authority",
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE"
          },
          {
            "description": "Recreation, culture and religion",
            "id": "08",
            "scheme": "COFOG"
          }
        ],
        "url": "https://www.belfastcity.gov.uk/tenders"
      },
      "id": "GB-FTS-21397",
      "identifier": {
        "legalName": "Belfast City Council"
      },
      "name": "Belfast City Council",
      "roles": [
        "buyer"
      ]
    },
    {
      "id": "GB-FTS-172",
      "name": "European Union",
      "roles": [
        "funder"
      ]
    },
    {
      "address": {
        "countryName": "United Kingdom",
        "locality": "London",
        "postalCode": "SW1P 3AA",
        "streetAddress": "One Great George Street"
      },
      "id": "GB-FTS-135539",
      "identifier": {
        "legalName": "ICE"
      },
      "name": "ICE",
      "roles": [
        "reviewBody"
      ]
    }
  ],
  "planning": {
    "budget": {
      "finance": [
        {
          "description": "ERDF \u2013 European Regional Development Fund \u2013 2021-2027",
          "financingParty": {
            "id": "GB-FTS-172",
            "name": "European Union"
          },
          "id": "1",
          "relatedLots": [
            "1"
          ]
        }
      ]
    }
  },
  "tag": [
    "tender"
  ],
  "tender": {
    "classification": {
      "description": "Construction work",
      "id": "45000000",
      "scheme": "CPV"
    },
    "coveredBy": [
      "GPA"
    ],
    "description": "The Project focuses on re-generating Waterworks and Alexandra Park, the objective of the project is to increase cross-community integration through a transformed shared space in north Belfast, which will enable 33.18 hectares of parkland space to be upgraded and capable of facilitating participation of thousands of people from all communities. Improvements at Waterworks Park comprise the demolition of the existing Waterworks Bothy and replacement with a new building to include public toilets, Changing Places, multi-purpose community room and kitchenette, extension to existing Cavehill Road gatehouse building, entrance improvements, new events space including multipurpose decking, resurfacing of footways, new pedestrian lighting along key routes, a dog park, replacement platforms and viewing area, replacement surface to existing small sided 3G pitch, and upgrades to existing Queen Mary\u2019s playground. Improvements at Alexandra Park include the resurfacing of footways, new pedestrian lighting along key routes, new reinforced grass event space, new lake viewing area, new public toilets and changing places, entrance improvements, 2no existing bridges replaced, new pedestrian entrance, new multi-sport synthetic surface with cover, and upgrades to existing play parks. Streetscape improvements along Camberwell Terrace and Castleton Gardens include resurfacing of footways with new kerbs; resurfaced carriageways and new tactile paving at pedestrian crossings; and all associated works.\nAdditionally, works include refurbishment and safety works to the Waterworks upper and lower reservoirs, and Alexandra Park lake reservoir, to be complemented with wider environmental, landscape and connectivity improvements. The proposed reservoir works comprise of a new overflow structure with reinforcement and protection of the return embankment parallel to the bywash channel at Waterworks Upper reservoir, repairs to the upstream face of Waterworks Lower reservoir with the addition of wetland planting to reduce the overall capacity of the reservoir, and removal of an existing parapet wall and embankment reinforcement at the Alexandra Park Lake\nreservoir.",
    "hasRecurrence": false,
    "id": "PQQ 4707",
    "items": [
      {
        "additionalClassifications": [
          {
            "description": "Landscaping work for green areas",
            "id": "45112710",
            "scheme": "CPV"
          },
          {
            "description": "Construction work of leisure facilities",
            "id": "45212100",
            "scheme": "CPV"
          },
          {
            "description": "Repair and maintenance work in connection with sports facilities",
            "id": "45212290",
            "scheme": "CPV"
          },
          {
            "description": "Surface work for highways",
            "id": "45233210",
            "scheme": "CPV"
          },
          {
            "description": "Pedestrian zone construction work",
            "id": "45233262",
            "scheme": "CPV"
          },
          {
            "description": "Installation of street furniture",
            "id": "45233293",
            "scheme": "CPV"
          },
          {
            "description": "Reservoir construction works",
            "id": "45247270",
            "scheme": "CPV"
          }
        ],
        "deliveryAddresses": [
          {
            "region": "UKN06"
          }
        ],
        "id": "1",
        "relatedLot": "1"
      }
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "lots": [
      {
        "contractPeriod": {
          "durationInDays": 390
        },
        "description": "The Project focuses on re-generating Waterworks and Alexandra Park, the objective of the project is to increase cross-community integration through a transformed shared space in north Belfast, which will enable 33.18 hectares of parkland space to be upgraded and capable of facilitating participation of thousands of people from all communities. Improvements at Waterworks Park comprise the demolition of the existing Waterworks Bothy and replacement with a new building to include public toilets, Changing Places, multi-purpose community room and kitchenette, extension to existing Cavehill Road gatehouse building, entrance improvements, new events space including multipurpose decking, resurfacing of footways, new pedestrian lighting along key routes, a dog park, replacement platforms and viewing area, replacement surface to existing small sided 3G pitch, and upgrades to existing Queen Mary\u2019s playground. Improvements at Alexandra Park include the resurfacing of footways, new pedestrian lighting along key routes, new reinforced grass event space, new lake viewing area, new public toilets and changing places, entrance improvements, 2no existing bridges replaced, new pedestrian entrance, new multi-sport synthetic surface with cover, and upgrades to existing play parks. Streetscape improvements along Camberwell Terrace and Castleton Gardens include resurfacing of footways with new kerbs; resurfaced carriageways and new tactile paving at pedestrian crossings; and all associated works.\nAdditionally, works include refurbishment and safety works to the Waterworks upper and lower reservoirs, and Alexandra Park lake reservoir, to be complemented with wider environmental, landscape and connectivity improvements. The proposed reservoir works comprise of a new overflow structure with reinforcement and protection of the return embankment parallel to the bywash channel at Waterworks Upper reservoir, repairs to the upstream face of Waterworks Lower reservoir with the addition of wetland planting to reduce the overall capacity of the reservoir, and removal of an existing parapet wall and embankment reinforcement at the Alexandra Park Lake\nreservoir.",
        "hasOptions": false,
        "hasRenewal": false,
        "id": "1",
        "status": "active",
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      }
    ],
    "mainProcurementCategory": "works",
    "procurementMethod": "selective",
    "procurementMethodDetails": "Restricted procedure",
    "status": "active",
    "submissionMethod": [
      "electronicSubmission",
      "written"
    ],
    "submissionMethodDetails": "https://e-sourcingni.ukp.app.jaggaer.com/web/login.shtml",
    "submissionTerms": {
      "languages": [
        "en"
      ]
    },
    "tenderPeriod": {
      "endDate": "2026-02-16T12:00:00Z"
    },
    "title": "PEACEPLUS Works Contractor for Reconnected Belfast Project at Waterworks and Alexandra Park"
  }
}