Buyer Name: UK Atomic Energy Authority
Buyer Address: Culham Science Centre, Oxfordshire, UKJ14, OX14 3DB, United Kingdom
Contact Name: Jordan Luker
Contact Email: Jordan.Luker@ukaea.uk
Buyer Name: UK Atomic Energy Authority
Buyer Address: Culham Science Centre, Oxfordshire, UKJ14, OX14 3DB, United Kingdom
Contact Name: Jordan Luker
Contact Email: Jordan.Luker@ukaea.uk
The equipment specified above is high voltage switchgear rated at 36 kV and was manufactured and installed in the HV substation in J5 by ABB Ltd. Onsite test and servicing of 6 x ABB Is Limiters by ABB factory in Germany. These are high capacity/high speed HV switchgear explosive fuses which protect 3 x 400/33 kV Super Grid Transformers installed in the HV substation at J5. ABB is the original equipment manufacturer (OEM) and recommends periodic servicing of this equipment to ensure correct operation is maintained. Specialist factory engineers from ABB Germany will perform this work.
No linked documents found for this notice.
Lot LOT-0000 Status: complete
Contract Title: Refurbishment request for Is inserts
{
"awards": [
{
"id": "1",
"items": [
{
"additionalClassifications": [
{
"description": "Industrial machinery",
"id": "42000000",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"country": "GB",
"countryName": "United Kingdom",
"region": "UKJ14"
}
],
"id": "LOT-0000",
"relatedLot": "LOT-0000"
}
],
"mainProcurementCategory": "goods",
"relatedLots": [
"LOT-0000"
],
"status": "active",
"suppliers": [
{
"id": "GB-PPON-PQZM-6371-NDYR",
"name": "ABB Electrification Service"
}
]
}
],
"buyer": {
"id": "GB-PPON-PLJV-1169-JTDD",
"name": "UK Atomic Energy Authority"
},
"contracts": [
{
"aboveThreshold": false,
"awardID": "1",
"dateSigned": "2026-01-06T00:00:00Z",
"documents": [
{
"datePublished": "2026-01-16T09:04:34Z",
"description": "Contract details notice on Find a Tender",
"documentType": "contractNotice",
"format": "text/html",
"id": "003703-2026",
"noticeType": "UK7",
"url": "https://www.find-tender.service.gov.uk/Notice/003703-2026"
}
],
"id": "1",
"period": {
"endDate": "2028-05-15T23:59:59+01:00",
"startDate": "2026-12-07T00:00:00Z"
},
"status": "active",
"title": "Refurbishment request for Is inserts",
"value": {
"amount": 34677.97,
"amountGross": 41613.56,
"currency": "GBP"
}
}
],
"date": "2026-01-16T09:04:34Z",
"id": "003703-2026",
"initiationType": "tender",
"language": "en",
"ocid": "ocds-h6vhtk-06072c",
"parties": [
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Oxfordshire",
"postalCode": "OX14 3DB",
"region": "UKJ14",
"streetAddress": "Culham Science Centre"
},
"contactPoint": {
"email": "Jordan.Luker@ukaea.uk",
"name": "Jordan Luker"
},
"details": {
"classifications": [
{
"description": "Public authority - central government",
"id": "publicAuthorityCentralGovernment",
"scheme": "UK_CA_TYPE"
}
],
"url": "https://www.gov.uk/government/organisations/uk-atomic-energy-authority"
},
"id": "GB-PPON-PLJV-1169-JTDD",
"identifier": {
"id": "PLJV-1169-JTDD",
"scheme": "GB-PPON"
},
"name": "UK Atomic Energy Authority",
"roles": [
"buyer"
]
},
{
"address": {
"country": "GB",
"countryName": "United Kingdom",
"locality": "Warrington",
"postalCode": "WA4 4BT",
"region": "UKD71",
"streetAddress": "Daresbury Park Daresbury"
},
"contactPoint": {
"email": "orders.lvp@gb.abb.com"
},
"details": {
"scale": "large",
"vcse": false
},
"id": "GB-PPON-PQZM-6371-NDYR",
"identifier": {
"id": "PQZM-6371-NDYR",
"scheme": "GB-PPON"
},
"name": "ABB Electrification Service",
"roles": [
"supplier"
]
}
],
"tag": [
"award",
"contract"
],
"tender": {
"description": "The equipment specified above is high voltage switchgear rated at 36 kV and was manufactured and installed in the HV substation in J5 by ABB Ltd. Onsite test and servicing of 6 x ABB Is Limiters by ABB factory in Germany. These are high capacity/high speed HV switchgear explosive fuses which protect 3 x 400/33 kV Super Grid Transformers installed in the HV substation at J5. ABB is the original equipment manufacturer (OEM) and recommends periodic servicing of this equipment to ensure correct operation is maintained. Specialist factory engineers from ABB Germany will perform this work.",
"id": "2114693",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"lots": [
{
"id": "LOT-0000",
"status": "complete"
}
],
"procurementMethod": "direct",
"procurementMethodDetails": "Below threshold - without competition",
"status": "complete",
"title": "Refurbishment request for Is inserts"
}
}